首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 19 毫秒
1.
2.
Thomas Stihl 《Stahlbau》2009,78(6):419-424
Die erste kommerzielle Tribünenanwendung mit dem Sandwich‐Plate‐System (SPS) – einem Stahl‐Kunststoff‐Sandwich‐System – konnte durchgeführt werden, weil besondere Umstände an dem gerade fertiggestellten Tribünengebäude der Pferderennbahn in Ascot [1] eine zusätzliche dringliche Anpassung erforderten. Ascot Racecourse – Steel‐plastic sandwich for the terrace of the new Grandstand. The first commercial application of the sandwich‐plate‐system (SPS) – a steel‐plastic sandwich system – could be carried out because special circumstances at the just completed building of the Grandstand at Ascot Racecourse [1] required additional urgent adjustments.  相似文献   

3.
The bridle‐chord truss bridge across the river Mulde near Wurzen, Germany – a review after design and construction. At the crossing of the federal highway B6 across the river Mulde near the town Wurzen, a composite bridge with a bridle‐chord truss was adopted as design solution. With the Mulde Bridge, the in historic times often used structure type of the bridle‐chord truss was developed farther in certain essential respects. The truss was designed as a one plane structure in the medial strip of the highway and furthermore, the truss was designed strongly curved, following the curvature of the alignment. The experiences made during design and execution are presented and alternatively possible solutions, construction types and building procedures are discussed.  相似文献   

4.
5.
6.
7.
8.
9.
10.
Zur Zeit befindet sich der Lückenschluss der BAB 30 als sogenannte Nordumgehung Bad Oeynhausen im Bau. In diesem Rahmen werden am östlichen und westlichen Ende der Nordumgehung die Bauwerke 29 und 4 erstellt. Hierbei handelt es sich um Schrägseilbrücken in Verbaundbauweise, welche architektonische Landmarken an den Enden der Nordumgehung Bad Oeynhausen setzen. Beide Bauwerke überführen die BAB 30 über den Fluss Werre. Die Stromöffnungen betragen ca. 68 m bzw. ca. 83 m und sind damit für Schrägseilbrücken vergleichsweise gering. Aufgrund der Lage im Krümmungsbereich, der örtlichen Randbedingungen (u. a. große Schiefe wegen des Kreuzungswinkels) sowie des FFH‐Status der Werre ergab sich im Rahmen der Entwurfsplanung eine anspruchsvolle Aufgabenstellung. Trotz eines ähnlichen Erscheinungsbildes unterscheiden sich beide Bauwerke jedoch maßgeblich in ihrer Konstruktion durch die Anzahl der Seilebenen und die Ausbildung der Seilquerträger. Der Aufsatz beschreibt die wesentlichen statisch‐konstruktiven Besonderheiten der Bauwerke aus Sicht der Entwurfsverfasser. New cable‐stayed bridges (Structure 29 and 4) in the course of the Autobahn A 30 – Northern bypass at Bad Oeynhausen. Closing a gap in the course of the Autobahn A 30, the Northern bypass at Bad Oeynhausen is currently under construction. Within this project two cable‐stayed bridges, Structure 29 and 4, are being constructed at the Western and Eastern ends of the bypass. The bridges are of composite construction and they have been architecturally designed to form landmarks at the respective ends of the Bad Oeynhausen bypass. Both structures carry the Autobahn A 30 across the river Werre. The main spans measure 68 m and 83 m respectively and are thus fairly short for cable‐stayed bridges. Due to the location in curved sections of the Autobahn, local constraints (such as a large skew because of the crossing angle) and the Werre being a nature reserve with FFH status, the structural design has been a demanding task. In spite of having a similar appearance both structures differ significantly in number of cable planes and the construction of the transversal girder for cable anchorages. This article describes the distinctive features of both bridges from a static and structural point‐of‐view.  相似文献   

11.
12.
Aufgrund der hohen Erhaltungskosten von Brücken gibt es mittlerweile unterschiedliche Ansätze, um die Dauerhaftigkeit zu erhöhen. Vorgespannte Brücken ohne Betonstahl stellen hierfür einen neuen Ansatz dar. Zur Erforschung des Tragverhaltens solcher Strukturen wurde ein Forschungsprojekt gestartet und Großversuche durchgeführt. Die Landesbaudirektion Salzburg war von dieser innovativen Idee überzeugt und hat deshalb die Technologie beim Bau der Egg‐Graben Brücke ausgeschrieben. Die Egg‐Graben Brücke ist eine im Grundriss gekrümmte Bogenbrücke mit einer Länge von 50 m. Nach einer Bauzeit von 18 Monaten erfolgte im November 2009 die Freigabe für den Verkehr. Der vorliegende Aufsatz beschreibt die Technologie, den Entwurf sowie die beim Bau der Brücke gesammelte Erfahrung. Design and Construction of the Egg‐Graben Bridge Due to the high maintenance costs of bridges, there are now various approaches to enhance the durability. Post tensioned bridges without steel reinforcement represent one of these approaches. To investigate the structural behaviour of such constructions, a research project was started and large‐scale tests were carried out. The government of the province of Salzburg could be convinced of this innovative technology and tendered out the method for the construction of the Egg‐Graben Bridge. For the arch bridge, which is curved in plan, the superstructure is prestressed without using further steel reinforcement. After a construction period of 18 months the bridge was opened to traffic in November 2009. The paper describes the technology, the design and the experience gained from the construction of the bridge.  相似文献   

13.
14.
15.
16.
17.
18.
19.
20.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号