首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
We consider the single machine multi-operation jobs scheduling problem to minimize the number of tardy jobs. Each job consists of several operations that belong to different families. In a schedule, each family of job operations may be processed in batches with each batch incurring a setup time. A job completes when all of its operations have been processed. The objective is to minimize the number of tardy jobs. In the literature, this problem has been proved to be strongly NP-hard for arbitrary due-dates. We show in this paper that the problem remains strongly NP-hard even when the due-dates are common and all jobs have the same processing time.  相似文献   

2.
We consider the scheduling problems arising when two agents, each with a family of jobs, compete to perform their respective jobs on a common unbounded parallel-batching machine. The batching machine can process any number of jobs simultaneously in a batch. The processing time of a batch is equal to the maximum processing time of the jobs in the batch. Two main categories of batch processing based on the compatibility of job families or agents are distinguished. In the case where job families are incompatible, jobs from different families cannot be placed in the same processing batch while all jobs can be placed in the same processing batch when job families are compatible. The goal is to find a schedule for all jobs of the two agents that minimizes the objective of one agent while keeping the objective of the other agent below or at a fixed value Q. Polynomial-time and pseudo-polynomial-time algorithms are provided to solve various combinations of regular objective functions for the scenario in which job families are either incompatible or compatible.  相似文献   

3.
Motivated by applications in food processing and semiconductor manufacturing industries, we consider the scheduling problem of a batching machine with jobs of multiple families. The machine has a limited capacity to accommodate jobs. The jobs are in arbitrary sizes and multiple families. Jobs from different families cannot be processed in a batch. We show the problems of minimizing makespan and total batch completion time are both NP-hard in the strong sense. We present a mixed integer programming model for the problems. Then we propose two polynomial time heuristics based on longest processing time first rule and first fit rule. For the special case where a larger job also has a longer processing time, the heuristic for minimizing makespan is optimal. For the general case, we show the performance guarantee of the methods for the two objectives respectively.  相似文献   

4.
In this paper we consider the problem of scheduling a set of identical batch processing machines arranged in parallel. A Greedy Randomized Adaptive Search Procedure (GRASP) approach is proposed to minimize the makespan under the assumption of non-zero job ready times, arbitrary job sizes and arbitrary processing times. Each machine can process simultaneously several jobs as a batch as long as the machine capacity is not violated. The batch processing time is equal to the largest processing time among those jobs in the batch. Similarly, the batch ready time is equal to the largest ready time among those jobs in the batch. The performance of the proposed GRASP approach was evaluated by comparing its results to a lower bound and heuristics published in the literature. Experimental study suggests that the solution obtained from the GRASP approach is superior compared to other heuristics.  相似文献   

5.
A batch processing machine can simultaneously process several jobs forming a batch. This paper considers the problem of scheduling jobs with non-identical capacity requirements, on a single-batch processing machine of a given capacity, to minimize the makespan. The processing time of a batch is equal to the largest processing time of any job in the batch. We present some dominance properties for a general enumeration scheme and for the makespan criterion, and provide a branch and bound method. For large-scale problems, we use this enumeration scheme as a heuristic method.Scope and purposeUsually in classical scheduling problems, a machine can perform only one job at a time. Although, one can find machines that can process several jobs simultaneously as a batch. All jobs of a same batch have common starting and ending times. Batch processing machines are encountered in many different environments, such as burn-in operations in semiconductor industries or heat treatment operations in metalworking industries. In the first case, the capacity of the machine is defined by the number of jobs it can hold. In the second case, each job has a certain capacity requirement and the total size of a batch cannot exceed the capacity of the machine. Hence, the number of jobs contained in each batch may be different. In this paper, we consider this second case (which is more difficult) and we provide an exact method for the makespan criterion (minimizing the last ending time).  相似文献   

6.
This paper considers the problem of scheduling a single machine to minimize the number of late jobs in the presence of sequence-independent family set-up times. The jobs are partitioned into families, and a set-up time is required at the start of each batch, where a batch is a maximal set of jobs in the same family that are processed consecutively. We design branch and bound algorithms that have several alternative features. Lower bounds can be derived by relaxing either the set-up times or the due dates. A first branching scheme uses a forward branching rule with a depth-first search strategy. Dominance criteria, which determine the order of the early jobs within each family and the order of the batches containing early jobs, can be fully exploited in this scheme. A second scheme uses a ternary branching rule in which the next job is fixed to be early and starting a batch, to be early and not starting a batch, or to be late. The different features are compared on a large set of test problems, where the number of jobs ranges from 30 to 50 and the number of families ranges from 4 to 10.  相似文献   

7.
We study problems of scheduling jobs on identical parallel machines, in which a due window has to be assigned to each job. If a job is completed within its due window, then it incurs no scheduling cost. Otherwise, it incurs earliness or tardiness cost. Two due window models are considered. In both models, the due window size is a decision variable common for all jobs. In the first model, called a constant due window, the due window starting time is a decision variable common for all jobs, and in the second, called a slack due window, the due window starting time is equal to the job processing time plus a decision variable common for all jobs. The objective is to find a job schedule as well as the size and location(s) of the due window(s) such that a weighted maximum or sum of costs associated with job earliness, job tardiness, and due window size is minimized. We establish the properties of optimal solutions of these minmax and minsum problems. For a constant due window model, we prove that the minmax problem with arbitrary weights and the minsum problem with equal weights are polynomially equivalent to the classical parallel machine scheduling problem to minimize the makespan. We further show that the problems for a constant due window model and slack due window model with the same objective function are reversible in the sense that their optimal solutions are mirror images of each other. These results imply O(n) and O(n log n) time algorithms for the considered problems when m=1.  相似文献   

8.
Minimizing Mean Completion Time in a Batch Processing System   总被引:8,自引:0,他引:8  
We consider batch processing jobs to minimize the mean completion time. A batch processing machine can handle up to $B$ jobs simultaneously. Each job is represented by an arrival time and a processing time. Jobs processed in a batch have the same completion time, i.e., their common starting time plus the processing time of their longest job. For batch processing, non-preemptive scheduling is usually required and we discuss this case. The batch processing problem reduces to the ordinary uniprocessor system scheduling problem if $B=1$. We focus on the other extreme case $B=+\infty$. Even for this seemingly simple extreme case, we are able to show that the problem is NP-hard for the weighted version. In addition, we establish a polynomial time algorithm for a special case when there are only a constant number of job processing times. Finally, we give a polynomial time approximation scheme for the general case.  相似文献   

9.
本文研究的连续型批处理机调度问题, 是在钢铁工业管坯的加热过程中提出来的. 工件带有释放时间和工期, 工件进入和离开机器是按周期依次进行的. 本文针对单机连续型批调度问题中工件释放时间和工期同序的情况, 分析了极小化最大拖期和拖期工件数等问题的计算复杂性, 证明了两类问题都是强NP-难的. 对于工件的释放时间和加工时间、工期都同序的特殊情况, 分别给出了能够获得对应问题的最优解的多项式算法.  相似文献   

10.
This research analyzes the problem of scheduling a set of n jobs with arbitrary job sizes and non-zero ready times on a set of m unrelated parallel batch processing machines so as to minimize the makespan. Unrelated parallel machine is a generalization of the identical parallel processing machines and is closer to real-world production systems. Each machine can accommodate and process several jobs simultaneously as a batch as long as the machine capacity is not exceeded. The batch processing time and the batch ready time are respectively equal to the largest processing time and the largest ready time among all the jobs in the batch. Motivated by the computational complexity and the practical relevance of the problem, we present several heuristics based on first-fit and best-fit earliest job ready time rules. We also present a mixed integer programming model for the problem and a lower bound to evaluate the quality of the heuristics. The small computational effort of deterministic heuristics, which is valuable in some practical applications, is also one of the reasons that motivates this study. The results show that the heuristic proposed in this paper has a superior performance compared to the heuristics based on ideas proposed in the literature.  相似文献   

11.
We study a scheduling problem that integrates parallel-batch production with family jobs and job delivery at the same time. The jobs are first processed on an unbounded parallel-batch machine and then delivered in batches to their specified customers by a transportation vehicle. We assume that jobs from different families (customers) cannot be processed together by the batch machine and also transported together by the vehicle. The objective is to minimize the time when the vehicle finishes delivering the last delivery batch to its customer and returns to the machine. We first show that the problem is NP-hard, and then propose for it a heuristic algorithm with a worst-case performance ratio of 3/2.  相似文献   

12.
e consider a single-machine batch delivery scheduling and common due date assignment problem. In addition to making decisions on sequencing the jobs, determining the common due date, and scheduling job delivery, we consider the option of performing a rate-modifying activity on the machine. The processing time of a job scheduled after the rate-modifying activity decreases depending on a job-dependent factor. Finished jobs are delivered in batches. There is no capacity limit on each delivery batch, and the cost per batch delivery is fixed and independent of the number of jobs in the batch. The objective is to find a common due date for all the jobs, a location of the rate-modifying activity, and a delivery date for each job to minimize the sum of earliness, tardiness, holding, due date, and delivery cost. We provide some properties of the optimal schedule for the problem and present polynomial algorithms for some special cases.  相似文献   

13.
This study considers the job scheduling problem of minimizing the weighted waiting time variance (WWTV) of jobs. It is an extension of WTV minimization problems in which we schedule a batch of n jobs, for servicing on a single resource, in such a way that the variance of their waiting times is minimized. WWTV minimization finds its applications for job scheduling in manufacturing systems with earliness and tardiness (E/T) penalties, in computer and networks systems for the stabilized QoS, and in other fields where it is desirable to minimize WWTV of jobs with different weights for priorities. We formulate a WWTV problem as an integer programming problem, prove the V-shape property for agreeably weighted WWTV problems and the nondelay property for general WWTV problems, and discover the strong V-Shape tendency of the optimal job sequences for this problem. Two job scheduling algorithms, Weighted Verified Spiral (WVS) and Weighted Simplified Spiral (WSS), are developed for the WWTV problems. Numerical testing shows that WVS and WSS significantly outperform existing WWTV algorithms.  相似文献   

14.
This paper considers scheduling problems where jobs are dispatched in batches. The objective is to minimize the sum of the completion times of the batches. While a machine can process only one job at a time, multiple machines can simultaneously process jobs in a batch. This simple environment has a variety of real world applications such as part kitting and customer order scheduling.A heuristic is presented for the parallel machine version of the problem. Also, a tight worst case bound on the relative error is found. For the case of two parallel machines, we examine two heuristics, which are based on simple scheduling rules. We find tight worst case bounds of 6/5 and 9/7 on the relative error and show that neither procedure is superior for all instances. Finally, we empirically evaluate these two heuristics. For large problems, the methods find solutions that are close to optimal.  相似文献   

15.
We study a supply chain scheduling problem in which n jobs have to be scheduled on a single machine and delivered to m customers in batches. Each job has a due date, a processing time and a lateness penalty (weight). To save batch-delivery costs, several jobs for the same customer can be delivered together in a batch, including late jobs. The completion time of each job in the same batch coincides with the batch completion time. A batch setup time has to be added before processing the first job in each batch. The objective is to find a schedule which minimizes the sum of the weighted number of late jobs and the delivery costs. We present a pseudo-polynomial algorithm for a restricted case, where late jobs are delivered separately, and show that it becomes polynomial for the special cases when jobs have equal weights and equal delivery costs or equal processing times and equal setup times. We convert the algorithm into an FPTAS and prove that the solution produced by it is near-optimal for the original general problem by performing a parametric analysis of its performance ratio.  相似文献   

16.
极小化最大完工时间的单机连续型批调度问题   总被引:7,自引:1,他引:7  
从钢铁工业中加热炉对管坯的加热过程,提出一种新的连续型批处理机调度问题,与传统批处理机调度问题的批进批出方式不同,其主要特征为批中工件的进入、处理和离开都连续进行,批B_i的处理时间与该批的大小|B_i|、批中工件T_j的处理时间p_j及机器的容量C都有关,表示为p^{(i)}=\dmax_{T_j\in B_i}\{p_j\}(1+\displaystyle\frac{|B_i|-1}{C}).对于极小化最大完工时间问题,给出了一个复杂性为O(n^2)的动态规划算法,并证明了这个算法的最优性.  相似文献   

17.
This paper presents a novel application of operational research techniques in Manufacturing. This concerns scheduling of multi-spindle head machines with a mobile table to minimize the makespan. We show that this problem can be formulated as scheduling for a single max-batch processing machine with inclusion, exclusion and precedence constraints between jobs. What makes this study unique from others in literature is that the batch processing time can exceed that of the longest job in the batch. The job compatibility and the batch time depend on the batch content, i.e. which jobs constitute the batch. This problem is transformed into finding the constrained shortest path in a specially constructed digraph. Dominance properties are developed to decrease the digraph's size. An industrial example is presented to illustrate the effectiveness of the proposed techniques.  相似文献   

18.
We study machine scheduling problems in which the jobs belong to different job classes and they need to be delivered to customers after processing. A setup time is required for a job if it is the first job to be processed on a machine or its processing on a machine follows a job that belongs to another class. Processed jobs are delivered in batches to their respective customers. The batch size is limited by the capacity of the delivery vehicles and each shipment incurs a transport cost and takes a fixed amount of time. The objective is to minimize the weighted sum of the last arrival time of jobs to customers and the delivery (transportation) cost. For the problem of processing jobs on a single machine and delivering them to multiple customers, we develop a dynamic programming algorithm to solve the problem optimally. For the problem of processing jobs on parallel machines and delivering them to a single customer, we propose a heuristic and analyze its performance bound.  相似文献   

19.
We consider the single machine multi-operation jobs total completion time scheduling problem. Each job consists of several operations that belong to different families. In a schedule, each family of job operations may be processed in batches with each batch incurring a set-up time. A job completes when all of its operations have been processed. The objective is to minimize the sum of the job completion times. In the literature, the computational complexity of this problem is posed as open. We show that the problem is strongly NP-hard even when the set-up times are common and the processing time of each operation is 0 or 1.  相似文献   

20.
Batch processing machines are frequently encountered in many industrial environments. A batch processing machine is one which can process several jobs simultaneously as a batch. The processing time of a batch is equal to the largest processing time of any job in the batch. This study deals with the problem of scheduling jobs in a flowshop with two batch processing machines such that the makespan is minimized. A heuristic based on Tabu search (TS) technique is proposed. The proposed heuristic is compared with a heuristic based on mixed integer linear programming (MILP). Because the complexity of the MILP-based heuristic is depended on the number of job batches, the comparison is under up-to-eight batches problem. In order to measure the proposed TS-based heuristic in larger batch problem, the relative error percentage with the lower bound (REPLB) is used. The results show that the proposed heuristic is efficient and effective for the problems with relative large job sizes.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号