首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
2.
3.
4.
5.
Conclusions The successful damming of the Dnepr near Kanev by the bermless method with the use of small- and medium-grained sands shows that this method can find widespread use in the future when constructing hydraulic structures on lowland rivers. In addition to the good organization of the operations, the success of damming can be attributed to the high discharge capacity of the tailrace and its convenient linking with the river channel being dammed. Translated from Gidrotekhicheskoe Stroitel'stvo, No. 6, pp. 5–7, June, 1973.  相似文献   

6.
7.
8.
9.
10.
Conclusion During construction of the Sayano-Shushenskoe hydrostation ice was passed through the narrowed 130-m wide channel for 7 years and for 3 years through the 5.3-m wide dewatering outlets which, during the ice run, were not submerged and operated as narrow deep bays with wide separating piers. Observations established that the planned and actual outer and height contours of the earth cofferdams and cribs of the foundation area of the first stage and their construction successfully performed their functions under rather complex ice conditions (especially in the springs of 1969–1971). For the first time in hydrotechnical construction practice conparatively large ice runs were passed through 5.3-m ice-discharge bays. The appropriate hydraulic conditions (flow depth more than 9–10 m and approach velocities more than 3 m/sec) were the decisive factors providing for the successful passage of ice under these conditions. Consideration of the experience by previously constructed Siberian hydrostations on rivers with heavy ice runs made it possible to make simple and economic decisions with respect to individual problems (rejection of high jackets on the cribs, use of earth cofferdams, use of narrow first stage dewatering outlets). In the future when using schemes for ice passages through narrow dewatering outlets under more rigorous climatic conditions it is necessary to take into account the possibility of their considerable freezing over and intensified ice formation in them during the winter. The solution to complex problems of ice passage when constructing hydrostations on the middle and lower reaches of large Siberian rivers requires further on-site observations at hydrostations under construction and improvement of model-calculation methods of investigation. Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 8, pp. 25–28, August, 1979.  相似文献   

11.
Conclusion The inclusion of regime observations during construction of the machine hall produced a practical effect and in combination with a number of design and technological decisions provided safe driving in the section of the startup complex.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 34–37, May, 1990.  相似文献   

12.
13.
14.
15.
16.
光明水电站二期工程泄洪建筑物采用台阶式溢流坝的型式,坝面消能率达50%以上,消能效果好,节省了下游消能工的工程投资。  相似文献   

17.
18.
19.
20.
1.  When constructing earth dams the inclusion of foreign members in the form of reinforced-concrete galleries, shafts, etc., in the body of the structure is impermissible. It is also desirable to eliminate the construction of a grouting gallery under the dam. The foundation should be grouted either before or after constructing the dam.
2.  Installation of monitoring and measuring equipment for observations during operation must be done after completing construction of the dam. Installation of MME during construction leads to its complete disturbance, holds up the rate of filling, and affects the quality of the works.
It is impermissible to construct concrete galleries on made ground. Elements of the dam should be constructed on a homogeneous foundation.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号