首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到10条相似文献,搜索用时 15 毫秒
1.
《Planning》2016,(45)
<正>【重点词组或短语】1.prepare for为……做准备2.have the flu患感冒3.help my mom with housework帮妈妈做家务4.another time下次,其他时间5.last fall去年秋天6.hang out常去某处;泡在某处7.by now到现在8.visit/see sb.拜访某人  相似文献   

2.
《Planning》2015,(9)
<正>【重点词组或短语】1.Clean-Up Day清洁日3.an old people’s home养老院5.help out with sth.帮助解决困难7.used to曾经,过去9.care for关心;照顾11.the look of joy快乐的表情13.at the age of在……岁时15.clean up打扫(或清除)干净17.cheer up(使)变得高兴起来;振奋19.give out分发;散发21.come up with想出;提出23.make a plan制定计划25.make some notices做些公告牌27.try out试用;试行29.work for为……工作;为……效力30.put up建造;举起;张贴  相似文献   

3.
The sp Pillar Stability Experiment (APSE) is an in situ experiment for investigating the spalling mechanism under mechanical and thermal loading conditions in a crystalline rock. In this study, the thermo-mechanical behaviors in the APSE were investigated with three models: (1) a Full model with rough meshes for calculating the influence of tunnel excavation; (2) a Submodel with fine meshes for predicting the thermo-mechanical behavior in the pillar during the borehole drilling, heating, and cooling phases; and (3) a Thin model for modeling the effect of slot cutting for de-stressing around the pillar. In order to import the stresses calculated from the Full model to the Submodel and to define the complex thermal boundary conditions, artificial neural networks (NNs) were utilized. From this study, it was possible to conclude that the stepwise approach with the application of NNs was useful for predicting the complex response of the pillar under severe thermo-mechanical loading conditions.  相似文献   

4.
《岩土工程学报》2004,26(1):99-99
Organised by: Hohai University, Nanjing, China; China Society for Hydraulic Engineering;China Society for Hydropower Engineering. Introduction: With the rapid economic and industrial growth of many regions in Asia,the development of water resources is a vital element of the infrastructure to satisfy the ever-increasing demand for power, irrigation and drinking water supply. This development includes both the construction of new facilities and the rehabilitation of existing older plants. Dams are usually the key element in such facilities and their economic construction and safety are of paramount importance.  相似文献   

5.
《Planning》2016,(33)
<正>【重点词组或短语】1.how often多久一次2.of course当然3.on weekends在周末4.go to the movies去看电影5.hardly ever几乎不;不曾6.at least至少,起码7.junk food垃圾食品8.use the Internet上网9.three or four times a week一周三到四次10.want sb.to do sth.想要某人做某事11.be good/bad for对……有好/坏处12.go camping in the country去乡下露营13.play sports做运动  相似文献   

6.
News in Brief     
<正>The State Council Issues the 13~(th) Five-Year Plan for Ecological Environmental Protection On Dec.5,2016,the State Council of China issued the 13~(th) Five-Year Plan for Ecological Environmental Protection.The Plan suggests that with the promotion of environmental quality as the core,the strictest measures for environmental protection should be applied to effectively prevent and control pollution in air,water,and soil,to enhance  相似文献   

7.
 This paper carried out the in-situ tests and laboratory tests to study the reinforcement mechanism and construction technology of a high fill airport under dynamic consolidation. The dynamic response of broken stone fills,of which gradation can not meet the specifications for earthwork construction,has been studied by measuring the acceleration. Then the relationship between compact energy,compact momentum(the height of hammer raised),the size of hammer and settlement,effective reinforced range were researched by numerical simulation. The results show that the acceleration of the range of sideways and downward of the broken stone fills is weaker than around. The plastic dissipation energy and volume of plastic zone of fills for every ramming are stable;while the settlement for each ramming is decreased because the plastic zone is increasing. The larger compact energy is,the larger settlement is;but the compact energy can not affect the ramming time for stable settlement. The settlement and plastic zone can be affected by the height of hammer raised and the size of hammer when the compact energy is constant. Construction technology indices were proposed by the research results.  相似文献   

8.
《Planning》2015,(33)
<正>【重点词组或短语】1.go on vacation去度假2.go to the mountains去爬山3.visit museums参观博物馆4.quite a few相当多5.study for为……而学习6.most of the time大部分时间7.taste good尝起来很好吃8.have a good time玩得高兴9.of course当然10.feel like感觉像是……;想要(做某事)11.in the past在过去12.walk around四处走走13.because of因为14.one bowl of...一碗……  相似文献   

9.
《Planning》2016,(33)
<正>【重点词组或短语】1.go on vacation去度假2.go to the mountains去爬山3.visit museums参观博物馆4.quite a few相当多5.study for为……而学习6.most of the time大部分时间7.taste good尝起来很好吃8.have a good time玩得高兴9.of course当然10.feel like感觉像是……;想要(做某事)11.in the past在过去12.walk around四处走走13.because of因为14.one bowl of...一碗……15.the next day第二天16.find out找出;查明17.go on继续18.something important重要的事  相似文献   

10.
In Belgium,the Boom clay was selected as a potential host formation for the disposal of high-level radioactive waste(HLW).To demonstrate the suitability of Boom clay for bearing thermal load induced by the HLW,a large-scale in-situ heater test,called PRACLAY heater test,will be conducted in the underground research laboratory(URL) in Mol.Owing to the limitations of the test(a short period of time compared with that considered in a real repository,different boundary conditions,etc.),the test is designed to simulate,in a conservative way,the most critical state and phenomena that could occur in the host rock.The PRACLAY gallery was excavated at the end of 2007;the heating phase will begin in 2010 and will last for at least 10 years.The PRACLAY gallery itself leaves an opportunity to study the possibilities of sealing a disposal drift in Boom clay and testing the feasibility of hydraulic cut-off of any preferential pathway to the main access gallery through the excavation damage zone(EDZ) and the lining with a seal in a horizontal drift(horizontal seal).Indeed,this is a generic problem for all deep geological disposal facilities for HLW.An annular seal made of compacted swelling bentonite will be installed in the front of the heated part of the PRACLAY gallery for these purposes.This paper provides detailed considerations on the thermo-hydro-mechanical(THM) boundary conditions for the design of the PRACLAY heater test and the seal test with the support of numerical calculations.It is believed that these important items considered in the PRACLAY heater test design also constitute key issues for the repository design.The outcome of the PRACLAY heater test will be an important milestone for the Belgian repository design.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号