首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 203 毫秒
1.
Risk Assessment Methodology for Underground Construction Projects   总被引:3,自引:0,他引:3  
This paper presents a risk assessment methodology for underground construction projects. A formalized procedure and associated tools were developed to assess and manage the risks involved in underground construction. The suggested risk assessment procedure is composed of four steps of identifying, analyzing, evaluating, and managing the risks inherent in construction projects. The main tool of the proposed risk assessment methodology is the risk analysis software. The risk analysis software is built upon an uncertainty model based on fuzzy concept. The fuzzy-based uncertainty model is designed to consider the uncertainty range that represents the degree of uncertainties involved in both (1) probabilistic parameter estimates and (2) subjective judgments. Other tools developed in this study include the survey sheets for collecting risk-related information and the detail check sheets for risk identification and analysis. The paper finally discusses a detailed case study of the developed risk assessment methodology performed for a subway construction project in Korea.  相似文献   

2.
Sustainable, or “green,” rating systems, such as the United States Green Building Council’s Leadership in Energy and Environmental Design (LEED), are leading to changes in the way owners, designers, and contractors approach the design, construction, and operation of buildings. The processes and features included in green design and construction may have positive and/or negative impacts on construction worker safety and health. This paper presents the findings of a research study of the impact of green building design and construction practices on construction worker safety and health. Occupational Safety and Health Administration (OSHA) recordable and lost time injury and illness data from green projects (as identified by LEED) and from nongreen projects was collected through a structured questionnaire survey. The data collected was analyzed to test for the presence of a difference in OSHA recordable incident rates (RIRs) and lost time case rates (LTCRs) between green and nongreen projects. It was found that there was suggestive, but inconclusive evidence of a statistically significant difference in the RIRs of the green and nongreen building projects included in the study. No statistically significant difference was found between the LTCRs for the green and nongreen projects included in the study. The study findings provide valuable information to the construction industry for the purposes of project safety planning and the assessment of safety and health on projects.  相似文献   

3.
Safety climate can benefit contractors, specialty contractors, and owners of industries by providing them with the knowledge of attitudes and perceptions that can help to consistently achieve better safety performance. The objective of this research was to determine safety climate that would enhance safety culture and positively impact perceived safety performance on construction projects. A safety climate questionnaire survey was conducted on the construction sites of a leading construction company and its subcontractors in Hong Kong. Approximately, 1,500 hard copy questionnaires were distributed and the response rate was excellent, resulting in 1,120 valid questionnaires being collected from 22 construction projects. By means of factor analysis, two underlying safety climate factors were extracted, accounting for 43.9% of the total variance. Multiple regression analysis confirmed that these climate factors, “management commitment and employee involvement” and “inappropriate safety procedure and work practices” were significant predictors of workers’ perceptions of safety performance. The findings indicated that the relationship between perceived safety performance and “inappropriate safety procedure and work practices” was inversely correlated. The results suggest that safety climate can be used as an effective measure of assessing and improving site safety for projects under construction. The findings of this study and the methodology might be useful for research at other construction sites in other regions and countries. This work provides useful information for project managers and safety practitioners who desire to improve safety climate and safety performance on construction sites.  相似文献   

4.
Designing for construction safety entails consideration of the safety of construction workers in the design of a project. Research studies have identified the design aspect of projects as being a significant contributing factor to construction site accidents. Designing to eliminate or avoid hazards prior to exposure on the jobsite is also listed as the top priority in the hierarchy of controls common to the safety and health professions. Widespread implementation of the concept in the United States by engineering and architecture firms, however, is lacking due to perceived industry and project barriers. Given its absence from standard design practice, a question arises as to the viability of designing for safety as an intervention in the construction industry. This paper presents a pilot study that was conducted to investigate the practice of addressing construction worker safety when designing a project and to determine the feasibility and practicality of such an intervention. Through interviews of architects and engineers, the study found that a large percentage of design professionals are interested and willing to implement the concept in practice. Among the perceived impacts of implementation, project cost and schedule were mentioned most often along with limitations being placed on design creativity. The results of the pilot study indicate that designing for safety is a viable intervention in construction. The factors that impact the consideration of safety in the design of a project do not entirely prohibit its implementation or make its implementation extremely impractical and therefore not feasible. Additionally, the outcomes of implementation provide sufficient motivation to implement the concept in practice. The paper describes the key changes needed for implementation of the concept in practice which include: a change in designer mindset toward safety; establishment of a motivational force to promote designing for safety; increase designer knowledge of the concept; incorporate construction safety knowledge in the design phase; utilize designers knowledgeable about design-for-safety modifications; make design for safety tools and guidelines available for use and reference; and mitigate designer liability exposure.  相似文献   

5.
This paper presents a quantitative methodology to determine financial impacts of the risk factors during the bidding stages of international construction projects. Project and country data of 26 construction projects from 21 countries were collected for evaluation of the international risk factors. The factors impacting cost contingency were identified using correlation and regression analysis techniques. The results indicated that four factors had major contributions for explaining the variations in the contingency levels. A regression model including the significant factors was developed to support bidding contingency decisions. The methodology presented provides a robust and practical statistical approach for determination of contingency by focusing on important risk factors. Details regarding model development and validation are presented along with a discussion on study limitations.  相似文献   

6.
A survey of design engineers, general contractors, and subcontractors indicates there is not uniform agreement on the site safety responsibilities that should be assumed by each of these groups. Possible explanations for this lack of shared expectations regarding site safety roles are discussed. It is suggested that specific site safety responsibilities be assigned on future projects based on each group’s ability to control the factors needed to prevent eight root causes of construction accidents.  相似文献   

7.
Concurrent design and construction has been lauded for streamlining projects in terms of time. However, such an approach may actually make projects more uncertain and complex than the traditional sequential design and construction process. The main sources of risk that have been identified with concurrent design and construction are iterative cycles that result from unanticipated errors and changes and their subsequent impacts on project performance. As an effort to address these detrimental impacts, a framework for quality and change management that identifies those negative iterative cycles is proposed. The proposed framework is incorporated into the system dynamics model of dynamic planning and control methodology (DPM), which has been developed to evaluate negative impacts of errors and changes on construction performance. Relevant to practitioners and researchers, the potential of DPM as a robust design and construction planning methodology that could effectively deal with errors and changes inherent in the design and construction process is demonstrated through a case study involving the Treble Cove road bridge in Massachusetts.  相似文献   

8.
This paper presents a mathematical model for calculating the budgetary impact of increasing the required confidence level in a probabilistic risk assessment for a portfolio of projects. The model provides a rational approach for establishing a probabilistic budget for an individual project in such a way that the budget for a portfolio of projects will meet a required confidence level. The use of probabilistic risk assessment in major infrastructure projects is increasing to cope with major cost overruns and schedule delays. The outcome of the probabilistic risk assessment is often a distribution for project costs. The question is at what level of confidence (i.e., the probability that budget would be sufficient given the cost distribution) should be used for establishing the budget. The proposed method looks at a portfolio of such projects being funded by the same owner. The owner can establish a target probability with respect to its annual budget. The model can help the owner establish confidence level for individual projects and also examine the effect of changing the confidence level of the portfolio budget on the budget and the confidence level of individual projects. The paper is relevant to practitioners because it provides a methodology for establishing confidence levels by the owner agencies in the emerging field of cost risk assessment for infrastructure projects. A numerical example is provided using actual transit project data to demonstrate the model application.  相似文献   

9.
Success has always been the ultimate goal of every activity, and a construction project is no exception. Due to the ambiguous definition of project success and the different perceptions of participants toward this concept, it may be difficult to tell whether a project is successful as there is a lack of consensus. Time, cost, and quality have long been the success criteria used to evaluate the performance of a construction project. However, such a list has been criticized as not being comprehensive. Even studies of the project success of a particular construction method, such as the design/build procurement system, are lacking in most previous research considering construction projects in general. This paper sets out to establish criteria for project success for a design/build project in construction, first by identifying relevant measures of project success for a construction project in past studies, with particular emphasis on design/build projects, and then by establishing a comprehensive assessment framework for project success for design/build projects. The significant impacts on the construction field of study, in terms of educational value and practical use, are also presented. With little research in the project success of design/build projects, the writers suggest a research focus for the study.  相似文献   

10.
New technologies, new materials, and innovative designs have been extensively adopted in Beijing Olympic venues construction. The extreme requirements for time deadline and competition function expose the venues construction to high risks. These risks would potentially bring negative impacts on the site safety performance. Meanwhile, there is a lack of systematic management for safety risks in China’s construction industry, especially for large projects such as the Beijing Olympic venues construction. This paper identifies and assesses safety risk factors inherent in Beijing Olympic venues construction with the involvement of 27 experienced and highly respected experts from government agencies, the construction industry, and academe through brainstorming, workshop discussions, and questionnaire surveys. The finding reveals that more than half of the critical safety risk factors are from contractors and subcontractors such as: lack of emergency response plan and measures; workers’ unsafe operation, and contractors ignoring safety under schedule pressure. Based on these critical safety risks, a risk register is composed and a model is developed in application of the analytic hierarchy process to assess the status of risks on site safety. The model has been attempted in two Olympic venue projects under construction and the validity has been approved. The risk checklist, register, and assessment model developed in the paper were integrated into the risk management system that has been used for Beijing Olympic venues construction.  相似文献   

11.
This paper develops a risk assessment methodology for construction projects by combining existing large quantities of data and project-specific information through updating approaches. Earlier studies have indicated that risk assessment is still difficult for practicing engineers to use due to the requirement of data on too many input variables. However, the availability of existing large quantities of data and project-specific information makes it possible to simplify the risk assessment procedure. Two main ideas are pursued in this paper to facilitate practical implementation: identify and evaluate the critical risk events, and develop a systematic updating methodology. Both epistemic and aleatory types of uncertainties in the data are considered, and corresponding updating procedures are developed. The proposed methodology is illustrated for the construction risk assessment of a cable-stayed bridge.  相似文献   

12.
This paper presents information by which to measure safety management performance on construction sites. In China, the conventional construction safety benchmarking approach is to assess safety performance by evaluating the physical safety conditions on site as well as the accident records, while no attention has been paid to the management factors that influence site safety. This paper is to identify the key factors that influence safety management and to develop a method for measuring safety management performance on construction sites. Based on the survey and interview data collected on safety management factors in 82 construction projects in China, the safety management index as a means to evaluate real-time safety management performance by measuring key management factors was developed. The quantified factors were compared with the commonly accepted physical safety performance index, which was derived from inspection records of physical safety conditions, accident rates, and the satisfaction of the project management team. Multifactor linear regression was conducted and the result indicates that safety management performance on site is closely related to organizational factors, economic factors, and factors related to the relationship between management and labor on site. Based on this benchmarking study, a practical safety assessment method was developed and then implemented on six construction projects. The results show that this method can be an effective tool to evaluate safety management on construction projects.  相似文献   

13.
Infrastructure projects have major effects on implementing the principles of sustainable development. Infrastructure projects will continue to be developed in the coming years, particularly in developing countries such as China and India; therefore, it is important to find methods and solutions for improving the sustainability of them. Although existing studies have suggested various methods for practicing sustainable development principles in the process of implementing infrastructure projects, effective assessment indicators are unavailable, which presents a barrier to the effective assessment of infrastructure project sustainability. This study introduces key assessment indicators (KAIs) for assessing the sustainability performance of an infrastructure project. The research data used for analysis were collected from a questionnaire survey given to three groups of experts, including government officials, professionals, and clients in the Chinese construction industry. The fuzzy set theory was used to establish KAIs. A procedure for using the KAIs is demonstrated by a case study. These research findings provide an alternative solution to appraise the sustainability of infrastructure projects.  相似文献   

14.
Due to the demand for built products from foreign investors and the growing economy, Vietnam’s construction industry experiences strong growth. While some of the construction projects are successfully executed, others faced difficulties. The aim of this study is to examine the factors that lead to successful outcomes in construction projects in Vietnam. Using the case study research design, three successful projects and another three unsuccessful projects were investigated. Data were collected from face-to-face interviews with several project participants in each project and archival data. The results show that major enablers that lead to project success are foreign experts’ involvement in the project, government officials inspecting the project, and very close supervision when new construction techniques are employed. A factor which leads to poor performance is the lack of accurate data on soil, weather, and traffic conditions. The findings may be useful to construction professionals operating in Vietnam to put in place factors that can lead to good project performance. For foreign practitioners entering Vietnam’s market, the study may assist them in focusing on the more important factors to achieve good project outcomes.  相似文献   

15.
Aspiring to adopt a nonstatistical quantitative approach to safety assessment, this study implements a multiattribute decision-making tool to elicit knowledge from experts and formalize it into a set of weighted safety factors. The environment addressed is the construction site and the specific factors studied are those affecting safety due to the operation of tower cranes. Nineteen senior construction equipment and safety experts were interviewed and led through the analytic hierarchy process (AHP) to provide their assessments on the relative importance of safety factors obtained in an earlier study. The results accentuate the dominance of the crane operator and general superintendent on the site safety scene and play down the contribution of “classic” site hazards such as power lines. Quantitative measuring of safety, such as reflected in the weights obtained in this study, is important in communicating safety requirements and focusing the limited resources available for safety improvements. These factor weights are also deemed to be a vital component in the development of a comprehensive model that will allow the computation of safety indices for individual construction sites employing tower cranes. It is expected that the methodology can then be adopted for addressing other site safety issues as well.  相似文献   

16.
An integrated methodology is developed for planning construction projects under uncertainty. The methodology relies on a computer supported risk management system that allows for the identification, analysis, and quantification of the major risk factors and the derivation of their probability of occurrence and their impact on the duration of the project activities. Using project management estimates of the marginal cost of activity starting time disruptions, a heuristic procedure is used to develop a stable proactive baseline schedule that is sufficiently protected against the anticipated disruptions that may occur during project execution and that exhibits acceptable makespan performance. We illustrate the application of the methodology on a real life construction project and demonstrate that our proactive scheduler generates baseline schedules that outperform the schedules generated by commercial software packages in terms of robustness and timely project completion probability.  相似文献   

17.
Construction projects are uncertain and complex in nature often because of iterative cycles caused by errors and changes. These errors and changes impair project performance and, consequently, cause schedule and cost overruns to be prevalent. Iterative cycles are more detrimental when design and construction are concurrent and often force activities to proceed without complete information. In an effort to address this issue, this paper presents the information technology aspect of the dynamic planning and control methodology (DPM), which provides a mechanism that will analyze the impact of negative iterative cycles on construction performance. In order to guarantee a smooth application of this method to real-world projects, DPM has been developed by integrating several existing methods around a core system dynamic model for quality and change management and then implementing these methods into a web-based collaborative environment. A case project, applying the developed web-based DPM, shows great potential in facilitating on-site decision making by virtue of its support of data analysis as well as real-time information sharing.  相似文献   

18.
This paper presents results from the simulation of localized, short-duration bioaerosol releases in a hypothetical building similar to a dormitory or barracks using public domain multizone air flow and contaminant dispersion modeling software. The primary purpose of the modeling was to generate example exposure data to be used in the development of a comprehensive microbial risk assessment methodology. However, these results are also of intrinsic interest for what they reveal about the contribution of various building characteristics to risk from airborne contaminants. A variety of parameters were varied, including building construction, heating, ventilating, and air-conditioning (HVAC) system design, and release characteristics, among others. Results of these simulations demonstrate the variability of exposure possible under different scenarios and, more particularly, the impact that HVAC design decisions can have on risk. Although a single building and restricted set of scenarios was investigated, several general conclusions could be drawn regarding factors, such as HVAC zoning and filter maintenance, that intrinsically contribute to vulnerability reduction.  相似文献   

19.
It is normally recognized that information systems (IS) in the construction industry have not been sufficiently used in the era of information. However, so far no serious comprehensive effort has been made to measure the degree of informatization at the industry level. In order to address this problem, in this paper we propose an informatization assessment methodology for the construction industry. An informatization index for the construction industry (IICI) is developed based on specifics of the construction industry. A survey using IICI was conducted among general contractors in Korea, and the results are analyzed in terms of the measure of assessment, IS phases, construction business functions, and size of the firm. It is found that the proposed methodology can provide meaningful indicators that can be used in quantitative comparative assessment from many different perspectives. Details and implications of the case study are briefly presented.  相似文献   

20.
This paper presents a study to develop and validate a sustainable construction safety and health (SCSH) rating system. The rating system provides an opportunity to rate projects based on the importance given to construction worker safety and health and the degree of implementation of safety and health elements. A Delphi survey using an expert panel of 12 experienced safety and health professionals representing different sectors of the construction industry was employed to develop the SCSH rating system. The study resulted in a rating system consisting of a total of 50 safety and health elements organized into 13 categories. Each category contains safety and health elements which carry credits based on their effectiveness in preventing construction worker injuries and illnesses. The rating system was initially validated based on data from 25 construction projects and found to accurately represent the safety performance of large projects. The SCSH rating system can be used as an effective tool to develop and plan construction safety and health programs and evaluate the potential safety performance of construction projects.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号