首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Cable‐stayed bridge for tramway, pedestrians, and bike traffic. For the development of the new quarter “Parkstadt Schwabing” in den North of Munich, the transport connection is established by a new tramway, the line 23. Thereby, a new bridge construction became necessary for the crossing of the main circular roadway “Mittlerer Ring” at the Schenkendorfstraße. The extraordinary bridge structure in direct conjunction with the glass enclosure of the Petuel‐tunnel belongs to the most spectacular metropolitan crossing locations of Munich.  相似文献   

2.
The bridle‐chord truss bridge across the river Mulde near Wurzen, Germany – a review after design and construction. At the crossing of the federal highway B6 across the river Mulde near the town Wurzen, a composite bridge with a bridle‐chord truss was adopted as design solution. With the Mulde Bridge, the in historic times often used structure type of the bridle‐chord truss was developed farther in certain essential respects. The truss was designed as a one plane structure in the medial strip of the highway and furthermore, the truss was designed strongly curved, following the curvature of the alignment. The experiences made during design and execution are presented and alternatively possible solutions, construction types and building procedures are discussed.  相似文献   

3.
4.
5.
In Friedberg (Hessen) wurde im Juli 2008 erstmals in Deutschland eine Straßenbrücke unter Verwendung von glasfaserverstärktem Kunststoff (GFK) fertig gestellt. Das Bauwerk überspannt mit 27 m die Bundesstraße B 3a bei der Stadt Friedberg (Hessen) und wurde in Stahl‐GFK‐Verbundbauweise realisiert. Die hohe Dauerhaftigkeit des neuen Werkstoffs und die zügige Montage der Brücke waren die entscheidenden Gründe pro GFK. In den letzten Jahren wurden in den USA, Japan und auch in Europa einige Leichtbaubrücken mit faserverstärkten Kunststoffen realisiert. Dabei konnten wertvolle Erfahrungen zum Bau und Betrieb gesammelt und die Leistungsfähigkeit von Verbundwerkstoffen unter Beweis gestellt werden. Die Brücke in Friedberg geht über diese Vorbilder hinaus, indem hier erstmals die Verbundwirkung zwischen der GFK‐Fahrbahn und dem Haupttragwerk aus Stahl berücksichtigt wird. Außerdem wurde konsequent der Ansatz eines wartungsarmen und langlebigen Bauwerks verfolgt, indem auf Lager und Fahrbahnübergänge verzichtet wurde. Bridges with Glass Fibre Reinforced Polymers (GFRP) decks – The new Road Bridge in Friedberg (Hessen, Germany). In July 2008 the first road bridge in Germany using glass fibre reinforced polymers (GFRP) was finished in Friedberg (Hessen). The structure has a span of 27 m and acts as overfly of the federal road B 3 near Friedberg (Hessen). The high durability of the new construction material and the fast assembly of the bridge were decisive factors in favour of GFRP. Within the last years several light weight bridges using FRP were realised in USA, Japan and also in Europe. Through this valuable experiences could be gathered regarding construction, the use and performance of composites could be demonstrated. The bridge in Friedberg extends this experience with the approach of considering the composite action of the FRP deck and the steel girders. It also follows consequently the approach of durable bridge construction by omitting any bearings or expansion joints.  相似文献   

6.
7.
8.
Der Einsatz von Vollfertigteilen im Stahlverbundbrückenbau hat bisher in Deutschland wenig Anwendung gefunden. Im internationalen Großbrückenbau, insbesondere auch beim Bau von Schrägseilbrücken, ist die Herstellung der Fahrbahnplatte von Stahlverbundbrücken mit Vollfertigteilen eine häufig ausgeführte Variante. Am Beispiel der Bahretalbrücke im Zuge der Staatsstraße S 107n sollen die Vorteile dieser Bauweise beschrieben und einige Hinweise zur konstruktiven Ausbildung dargestellt werden. Application of prefabricated sections for composite bridges shown on the example of Bahretal Bridge. The application of the prefabricated sections in composite constructions has not been often used in Germany. In the international bridge building especially in building of cable stayed bridges prefabricated sections in the assembly of the deck are often used. The advantages of using this method and some details of the construction will be shown on the example of the Bahretal Bridge.  相似文献   

9.
10.
11.
12.
13.
VFT‐WIB viaduct in Vigaun – a composite bridge with external reinforcement. With the introduction of the composite dowel the possibility is given to develop new construction methods for bridges. The VFT‐WIB construction method is used for the first time for the road bridge in Vigaun/Austria, which is in service since autumn 2008. The cross‐section is composed out of two prefabricated elements with halved rolled girders, working as bottom flange. The composite dowels are manufactured by cutting the rolled girder into two halves with a special cutting‐line. These halved girders work as external reinforcement, which leads to very slender and economical composite structures. Below details about the planning process, the design and the construction process of 78m long three span framing bridge over the railway line from Salzburg to Wörgl are shown.  相似文献   

14.
15.
Im Zuge einer deutlichen Erweiterung der Fluggastkapazitäten und Modernisierung ist in Moskau das dritte Terminal am Flughafen Sheremetyevo entstanden (Bild 1). Unter der Leitung der Arnold AG übernahm das Büro B+G Ingenieure Bollinger und Grohmann GmbH (B+G) die Planung mehrerer Vordächer und einer Fußgängerbrücke zwischen Parkhaus und Terminal. In der weiteren Entstehung wurden die Firmen Müller Offenburg GmbH & Co. KG (MOG), Heinrich Lamparter Stahlbau GmbH & Co. KG (StaLA) und Radabau GmbH für die Fertigung verpflichtet. Der folgende Beitrag befasst sich mit den Besonderheiten der Planung sowie der Fertigung der einzelnen Bauteile in diesem speziellen Projekt. Sheremetyevo Airport, Moscow, Russia – Structural design and fabrication of steel roofing and bridge. The new Terminal 3 was built as part of the significant expansion and modernization to increase passenger capacities at Sheremetyevo Airport in Moscow (Figure 1). Bollinger + Grohmann Ingenieure carried out the structural design for various canopies and a footbridge between parking garage and terminal building under the supervision of the Arnold AG. In the later stage of the project Müller Offenburg GmbH & Co. KG (MOG), Heinrich Lamparter Stahlbau GmbH & Co. KG (StaLA) and the Radabau GmbH were assigned the manufacturing contract. The following article deals with the peculiarities during the design stage and fabrication of individual structural elements of this particular project.  相似文献   

16.
17.
Fertigteilbauweisen für die Herstellung der Fahrbahnplatten von Verbundbrücken konnten sich bei kleineren Brücken bereits durchsetzen. Verschiedene Bautypen wurden entwickelt: die VFT‐Bauweise, die Halbfertigteilbauweise, die Ganzfertigteilbauweise. Im Großbrückenbau ist die Anwendung, zumindest in Deutschland, bisher auf einzelne Fälle beschränkt geblieben und eine abgeschlossene Stufe der Entwicklung noch nicht erreicht. Die Ganzfertigteilbauweise, wie sie bei der Bahretalbrücke eingesetzt wurde, stellt eine Möglichkeit dar, die Vorteile der deutlich schnelleren Herstellung der Fahrbahnplatte im Großbrückenverbundbau effektiv zu realisieren. Besonderes Augenmerk ist bei der Bemessung und Konstruktion auf die Rissproblematik zu legen. Die hier aufgetretenen Rissbildungen begründen sich durch die unterschiedlichen Materialeigenschaften und Herstellungszeitpunkte der Fertigteile und der Ortbetonergänzungen. Mit Hilfe des baubegleitenden Messprogramms für die Bahretalbrücke konnten die Rissbildungen sowie insbesondere die Spannungen in den Anschlussbewehrungen der Fertigteile gut nachvollzogen werden. Letztere liegen aufgrund des “Sammelrisseffektes” deutlich über den Spannungen der Ortbetonbewehrung und können nicht einfach am Zustand II‐Querschnitt berechnet werden. Zusammenfassend kann für die Bahretalbrücke eine gute Beurteilung der Bauweise gegeben werden. Prefabricated elements for the floor system of Bahretalbridge. The construction of floor systems of composite bridges, using prefabricated elements in concrete, could already achieve acceptance for smaller bridges. Different types were developed: VFT‐types, semi‐precast construction, precast construction. So far there are only a few cases of prefabricated elements in concrete for bigger bridges in Germany. Using the precast construction presents a possibility to produce floor systems faster and more effective, as done with the Bahretalbridge. Special attention is to be turned to the calculation and construction of the crack formations. The crack formations seen in this particular construction happened because of the different material property and the production time of the prefabricated elements as well as the addition of floor systems. During the construction progress several measurements helped to understand the appearance of the crack formations. The stresses of the reinforcement between prefabricated elements and the in‐situ concrete are much higher due to the effect of accumulated cracks. Summarizing the construction of the Bahretalbridge was done in a decent way and deserves a positive evaluation.  相似文献   

18.
Am 5. September 2009 wäre Hellmut Homberg einhundert Jahre alt geworden. Dies ist Anlass, an sein vor allem den Brückenbau bereicherndes Wirken zu erinnern und ein, wenn auch nicht vollständiges, Werkverzeichnis zu erstellen. Das gilt sowohl für die unter seiner maßgebenden Mitwirkung entworfenen Brücken als auch für seine völlig neuartigen, die statischen Berechnungen in der Praxis erleichternden, streng theoretisch hergeleiteten und eine zutreffende Bemessung der Kreuzwerke und orthotropen Fahrbahnplatten ermöglichenden Tafel‐ und Tabellenwerke. Teil I schildert Homberg s beruflichen Weg und versucht, ein Porträt zu zeichnen; Teil II ist seinen theoretischen Untersuchungen gewidmet, und Teil III geht auf besondere Brücken ein, und. Harmony between science and art in bridge‐building: Hellmut Homberg (1909–90) – life and work (part I). Hellmut Homberg would have been 100 years old on 5 September 2009. This is an opportunity to look back on his work which so enriched the world of bridge‐building in particular, and also a chance to compile a catalogue of his work, albeit incomplete. This applies to the bridges in which he played an influential role in their design and also to his books of mathematical and design tables that enabled the accurate design of beam grids and orthotropic bridge decks. The tables with their rigorous theoretical background were at the time quite new and eased structural calculations in everyday practice. Part I describes Homberg's professional career and attempts to draw a portrait of the man; part II is devoted to his theoretical studies, and part III deals with particular bridges.  相似文献   

19.
20.
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号