首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
刘军 《山西建筑》2005,31(8):150-151
介绍了FIDIC条约和国内施工合同,从合同工期和施工期、中期付款、变更范围三方面,对FIDIC条约和国内施工合同进行了对比分析,提出一些看法。  相似文献   

2.
本文通过解读以工程量清单综合单价为基础的FIDIC合同条件,讨论国内建设工程施工合同签订中合同价格形式的选用原则、专用条款的约定内容,对合同签订中的风险规避提出建议,完善合同的签订。  相似文献   

3.
我国借鉴了FIDIC土木施工合同条件有关规定 ,于 1999年 12月 2 4日重新修订了《建设施工合同 (示范文本 )》。新文本的内容和一些规定有所变动。建设施工的相关主体在订立施工合同时要充分注意示范文本的变动。  相似文献   

4.
本文对工程建设合同的类型进行了简单的描述,阐述了工程合同进行风险管理的依据,通过合同类型的定义对固定总价合同、单价合同和成本加酬金合同进行了辨析,得出在三种不同的计价合同下业主和承包商的风险分担,并在风险承担者、对工程的管理、工程变更的可能性、对工程结算的难易等方面对固定总价和、单价合同和成本加酬金合同三种计价合同进行阐述并给出了各自的应用范围。  相似文献   

5.
Uncertainty makes exchanges subject to substantial opportunistic behavior that is generally believed to be curbed by the contract. However, how the contract governs the relationship between uncertainty and opportunistic behavior has not been elaborated. This paper examines the effects of uncertainty on the supplier's opportunistic behavior and the moderating effects of contractual complexity. This research classifies uncertainty into environmental uncertainty and behavioral uncertainty and distinguishes contractual complexity from a functional perspective, with elements including control, coordination and adaptation. Using data from 220 owners and general contractors in the Chinese construction industry, this research reveals that a positive relationship exists between uncertainty and opportunistic behavior. Contractual control and adaptation have effects on weakening the relationship between environmental uncertainty and opportunistic behavior, while contractual coordination can mitigate the opportunistic behavior induced by behavioral uncertainty. These findings offer new insights into uncertainty management and a nuanced understanding of contractual governance in projects.  相似文献   

6.
FIDIC施工合同条件下的工程变更控制   总被引:1,自引:0,他引:1  
随着我国工程管理逐步与国际接轨,FIDIC新版施工合同条件在工程管理行业得到广泛应用。本文对如何应用FIDIC施工合同条件的条款处理工程变更进行了简要介绍。  相似文献   

7.
为了改善我国工程计价与建设工程合同管理相脱节的现状,以长期合同理论为分析工具,对工程价款形成过程进行解析,并建立了工程价款分析框架,即形成—调整—支付,在此基础上,选择《FIDIC 土木工程施工合同条件》为对象,对其合同价格的形成、合同价款的调整、工程价款的支付全过程及相关合同条款和国内合同范本对比分析,在验证该分析框架适用性的同时也为工程造价人员开展合同分析工作提供了借鉴。  相似文献   

8.
工程合同柔性作为一种应对项目不确定性的能力,能够有效地改善项目管理绩效。在工程项目管理研究领域中,针对工程合同柔性的研究,真正结合工程项目、工程合同特征的研究却很少见,因此,通过文献研究并且结合法经济学与契约经济学理论,深刻剖析工程合同柔性的本质是价格柔性;基于13版《施工合同范本》与FIDIC合同条件,阐明工程合同柔性条款运作机理,即工程合同柔性程度的改变主要是通过柔性点的数量以及同一柔性点责任与权利划分的原则来确定。  相似文献   

9.
国际工程合同争议解决方式评析与借鉴   总被引:1,自引:0,他引:1  
争议解决方式是国际工程合同的重要内容.本文分析了FIDIC、NEC、ICE、JCT、AIA等5种目前通行的国际工程合同,其争议解决方式各具特点,体现了现代合同管理公平、效率的理念和尊重当事人意思自治的思想.借鉴国际工程合同争议解决方式有助于改革我国目前的建筑纠纷解决机制.  相似文献   

10.
赵三宝 《山西建筑》2008,34(7):260-262
从计量程序上阐述了FIDIC合同条件下的支付方式,并介绍了各种支付方式的实施方法,对提高实施FIDIC合同条件的工程项目的效益具有一定的参考价值.  相似文献   

11.
王文胜 《山西建筑》2005,31(4):121-122
结合工程实例,介绍了FIDIC合同条款在我国外资建设项目中的应用情况,阐述了索赔在工程中的作用,指出FIDIC合同条款将在我国被广泛地应用。  相似文献   

12.
In light of increasing project complexity, constraints on programme schedule and limited budget, there exists a strong call for changes in contracting procedures in construction. Both the Guaranteed Maximum Price (GMP) and Target Cost Contracting (TCC) approaches with a gain-share/pain-share arrangement have been advocated to achieve better value for money and more satisfactory project performance. This paper aims to review the prevailing practices of GMP/TCC in general, and explore the motives and benefits of implementing the GMP/TCC scheme in comparison with the traditional fixed-price lump-sum contract in particular. The research study is based on a comprehensive literature review and an industry-wide empirical questionnaire survey for evaluating the relative importance of motives and benefits associated with GMP/TCC in Hong Kong. The survey data collected from 45 valid completed questionnaires were analysed using the mean score ranking technique, Kendall's concordance test, Spearman's rank correlation test and one-way ANOVA test. The perceived benefits were measured and ranked from the perspectives of the client, contractor and consultant for cross-comparison. The survey findings indicated that the three most common motives of clients behind their decision of adopting GMP/TCC include: (1) to generate an incentive for contractor to achieve cost saving; (2) to develop better working relationship within the project team; and (3) to tap in contractor's expertise in design and innovation. The top three perceived benefits of applying GMP/TCC were found to be: (1) early settlement of final project account; (2) improved partners' working relationship under a partnering arrangement; and (3) capability of integrating contractor's expertise in building designs and innovations prior to construction. The research results are particularly essential in assisting key project stakeholders to realise the potential benefits derived from the use of GMP/TCC contracts and in generating more useful insights into alternative integrated contracting strategies for the construction industry, so as to drive for excellence in overall project performance.  相似文献   

13.
为探讨新工程合同( NEC)在内地推广的可能性,通过文献综述,概述 NEC 的特征及组成结构,以内地建设工程合同借鉴的 FIDIC 条款为例,分析 NEC 在工期、成本、质量管理方面的优势。根据对香港发展局工务部门成员及 NEC 项目相关负责人的访谈,重点总结 2009 年以来 NEC 在香港工程建设领域的应用情况,分析顺利开展 NEC 项目的要素,以及阻碍其推广的因素。从合作理念转变、试点项目选择、合同应用语言、团队成员配置四方面,提出在内地建设实践项目中应用 NEC 的相关建议。  相似文献   

14.
通过分析菲迪克合同体系的特点并结合小浪底水利工程国际标二标的实际案例,探讨在中国实施菲迪克合同条件下建设项目工程中处置合同争议与冲突的基本思路,探求进行建设项目风险管理的可能途径,以及建立链式风险管理模型的构想。  相似文献   

15.
工程总承包是目前国际上一种主流的工程发包方式,与之相匹配的标准化合同文本也应运而生。这些标准化合同文本总体上采用总价方式,这为发挥工程总承包的优势创造了条件,但同时也限制了工程总承包的广泛应用。本文介绍了FIDIC的"银皮书",以及我国在2011年相继颁布的两个标准化工程总承包合同条件的特点和适用范围,并对其计价方式进行了分析,剖析了它们计价方式的收益或风险分配方式的特点以及适用范围,指出了在普遍推广应用中所面临的问题。特别的,为推动工程总承包合同条件计价方式的完善,提出了改进标准化合同条件计价方式的途径:构建介于单价合同与总价合同之间的计价方式,既保持总价合同对承包方激励作用,又充分发挥单价合同可对风险作合理分配的优势,以实现承发包双方的共赢。  相似文献   

16.
工程变更估价三原则在合同工程子项价格基本合理的情况下可以公平的高效率的适用,但在合同中可适用参照的工程子项价格明显偏高或偏低的情况下适用该三原则就明显不公平,应该进行补充和完善。文章从工程合同中的不修改合同原则及合同法中的实质公平原则出发,提出了在合同工程子项价格非正常情况下工程变更估价的方法,并据此提出完善工程变更估价三原则的建议。  相似文献   

17.
汪黎明 《山西建筑》2014,(25):285-287
阐述了建设工程项目合同的基本概念、特征和作用,深入分析了当前建设工程合同管理中出现的问题,并提出相应的对策,旨在提高工程项目管理效率,增加工程建设领域的经济效益和社会效益。  相似文献   

18.
浅析DAB争议解决方式的法律效力   总被引:1,自引:0,他引:1  
详细介绍并分析了目前在国际工程纠纷争议中得到广泛应用的DAB争议解决方式具有的独特的DAB协议的法律效力;DAB程序的法律效力;DAB决定的法律效力和DAB决定的执行效力.  相似文献   

19.
常乐  陆惠民 《山西建筑》2005,31(5):145-146
基于FIDIC99施工合同条件所起草的固定单价合同,结合一住宅楼工程实例,从工期、费用和利润方面,探讨了工程实施中产生的一系列索赔问题,以供参考。  相似文献   

20.
在工程项目实际进行过程中,工程变更是经常碰到的问题,它也是造价变化的主要根源。本文探讨了在工程合同条件下(包括FIDIC条款)工程变更对工程造价控制的影响。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号