首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 515 毫秒
1.
隧道穿越断层破碎带突水涌泥模糊安全评价   总被引:3,自引:0,他引:3  
为了探索隧道施工过程中断层破碎带突水涌泥的安全等级,建立了隧道穿越断层破碎带突水涌泥安全评价指标体系及其评价等级.评价过程中采用一种改进的层次分析法--乘积标度法确定安全评价指标的权重,并运用模糊综合评价法对隧道穿越断层破碎带突水涌泥安全评价指标体系中的4个单因素和整体进行评价,对评价结果确定了安全等级标准.通过对别岩槽隧道穿越F3断层破碎带突水涌泥实例验证,表明断层破碎带突水涌泥安全评价指标体系具有合理性和实用性,这对于类似隧道工程断层破碎带突水涌泥安全评价工作具有参考价值.  相似文献   

2.
《地下空间与工程学报》2021,17(z1):439-448,462
为了实现隧道穿越富水断层破碎带施工突水涌泥安全风险评估,首先总结出了一套全面的关于隧道穿越富水断层破碎带突水涌泥风险因素评价指标体系,其次运用层次分析法(AHP)与模糊数学(Fuzzy)理论,构建了隧道穿越富水断层破碎带施工突水涌泥风险发生概率和风险后果损失的定量评估模型,最后通过开展关于碧峰寺隧道穿越F7断层破碎带突水涌泥的工程实例验证,得到碧峰寺隧道风险发生概率等级为Ⅳ级,风险后果等级为Ⅱ级,综合风险等级为高度。现场施工结果表明这种基于定性与定量相结合的AHP-Fuzzy分析方法的隧道穿越富水断层破碎带风险评估模型具有一定的适用性,这对类似隧道工程施工提供了重要的参考价值和意义。  相似文献   

3.
注浆在溶蚀破碎带突水涌泥治理中的应用   总被引:1,自引:0,他引:1  
结合具体工程实例,对突水涌泥的基本情况进行了分析,提出了突水涌泥的处理方案,详细阐述了负压排水和高压劈裂注浆在溶蚀破碎带突水涌泥治理中的应用,积累了隧道工程施工经验.  相似文献   

4.
钟月建 《建筑安全》2020,35(6):57-59
隧道穿越断层破碎带常会发生突水涌泥灾害。文章以延崇高速公路(北京段)玉渡山隧道为工程背景,采用调查问卷咨询现场技术指导和专家组成员,建立各层次影响因素判断矩阵,采用AHP-Fuzzy法对隧道穿越断层破碎带突水涌泥围岩进行质量分级。研究结果表明:(1)建立了适用于隧道穿越断层破碎带突水涌泥围岩质量分级体系;(2)运用Fuzzy法得出反映各因素对围岩质量分级的影响程度的隶属度矩阵;(3)得出玉渡山隧道区间强风化破碎砾岩、泥质白云岩的质量等级分别为Ⅴ级和Ⅳ级,研究成果可为相关隧道围岩分级工作提供参考。  相似文献   

5.
周新星 《市政技术》2022,(12):19-25
隧道施工过程中遭遇断层破碎带时由于断层处水系发育完整、围岩破碎、土体松散,极易发生突水突泥灾害。针对隧道断层破碎带突水突泥问题,综合评述了隧道突水突泥致灾机理及隧道突水突泥典型案例,并对案例中突水突泥灾害注浆处治技术及其工程应用进行了总结,评价了隧道断层破碎带突水突泥注浆材料及其注浆安全防护技术。结果表明:在隧道突水突泥致灾机理的相关理论中突变理论对隧道断层破碎带突水突泥灾害的解释较为合适,突变理论认为隧道断层破碎带突水突泥主要受地层岩性、地下水赋存状态及存量的影响,地层岩性中断层破碎带致灾构造是决定性因素。钻爆开挖过程中断层破碎带处开挖扰动容易引起围岩等级恶化,通常采用预注浆进行加固;预留不少于最小安全厚度的防突岩盘是防止突水突泥灾害的关键;预留适当厚度的止浆墙和淤积体的正确清除是防止隧道二次突水突泥的关键。水泥单液浆、快硬硫铝酸盐水泥单液浆、水泥-水玻璃双液浆仍然是目前常用的隧道断层破碎带突水突泥处治材料。研究结果为隧道断层破碎带突水突泥注浆安全防护提供了指导和理论依据。  相似文献   

6.
隧道施工经过富水断层破碎带时,易发生突水突泥等地质灾害,给隧道建设带来巨大影响。本文依托江西省吉莲高速钟家山隧道F2断层突水突泥实例,详细分析了富水断层破碎带隧道突水突泥原因和机制,基于安全有效治理原则,系统提出了包括地表塌陷处理、安全挡泥墙构筑、洞内清淤防突加固、突泥口附近拱璧防突加固和突泥段周边帷幕注浆加固等综合治理技术措施。  相似文献   

7.
林福地 《建筑安全》2024,(2):38-41+47
依托梁山隧道为工程背景,以L7断层的处理为研究对象,通过对梁山隧道断层突水涌泥情况进行原因分析,提出复杂工程地质条件下洞内迂回导坑的设置方式及相关安全措施,并对断层处理过程中溃口封堵、断层地质钻探、排水降压、提供施工用水等问题提出相应的措施,通过设置左、右迂回导坑,为突水涌泥整治、正洞施工创造了条件,有效解决了施工问题并降低了施工过程中的安全风险。  相似文献   

8.
断层破碎带是隧道施工中常见的不良地质体,在含有断层破碎带的隧道中进行施工建设极易诱发岩块掉落、突水突泥等地质灾害,研究断层破碎带区隧道的开挖变形可以有效预判工程风险,提高工程质量.本文采用数值模拟方法,结合枫树下隧道穿越断层破碎带工程背景,在考虑断层破碎带这个关键因素的基础上,对断层破碎带的数值本构模型进行了选取,并对...  相似文献   

9.
在岩溶地区深埋长大隧道的施工过程中,当隧道穿越断层、岩溶发育地段和富含水区域时,容易发生涌水、突泥等事故,给施工安全带来极大威胁。龙潭隧道属于深埋特长岩溶隧道,施工期ZK72+205~ZK71+940段断层溶蚀带发生了四次涌水突泥事故,针对这四次事故,基于该段地层的岩溶发育规律,从地质学角度系统地分析了涌水突泥机理。分析得到:具有丰富补给来源的地下水、松散的岩溶洞穴堆积物给涌水突泥创造了必要条件,一经开挖扰动,事故一触即发。基于涌水突泥机理的分析结果,合理选择了超前小导管挤压劈裂注浆、负压排水、长管棚注浆、前进式分段高压注浆等治理措施,成功穿越了该段,完成了贯通,所得结论对类似工程具有一定的借鉴意义。  相似文献   

10.
隧道在断层破碎带处施工时容易诱发塌方、大变形以及突泥突水等灾害。以五道岭隧道工程为背景,利用有限元软件对五道岭隧道的不同厚度断层破碎带对隧道围岩位移产生的影响进行分析。研究结果表明:隧道围岩最大竖向位移和水平位移都发生在断层破碎带处;隧道围岩位移值均随着断层破碎带厚度的增大而增大,断层破碎带厚度越小,隧道围岩越稳定。  相似文献   

11.
蔡丰旭 《山西建筑》2011,37(30):237-238
结合目前高速公路施工项目招投标活动的实际情况,阐述了最低评标价法的概念,归纳了其优点及存在问题,对完善最低评标价法提出几点策略,以期促进招标投标市场更加规范有序。  相似文献   

12.
This article analyses state-led place-making practices in Melbourne. The two levels of government that influence planning in Melbourne make much of the city as ‘culturally vibrant’ and ‘creative’, and have incorporated creative city-inspired place-making principles into many layers of the planning system. An examination of the development of two mixed-use megaprojects in central Melbourne reveals however that ideals of culturally engaging public places, and indeed of creative landscapes for middle-class consumption, wither in the face of more basic imperatives for economic development. In these case studies the ‘creative city’, no matter how the idea is interpreted, has little traction either as a set of inclusive place-making principles or as a gentrification strategy. The article concludes that the creative city-inspired place-making objectives in the planning system at both state and local levels are ambiguous in their overall intents and completely unsupported by statutory controls. Such place-making objectives as are realised are the compromised results of the interplay of uncoordinated decisions, delivered at the pleasure of the developer.  相似文献   

13.
Septage is widely acknowledged as a major source of infectious pathogens while disposal of septage, and the operation and maintenance of septic tanks, is not regulated in many developing countries. Twenty untreated septage and septage sludge samples were taken from Can Tho City, Vietnam to examine their pathogen content, and indicator micro-organisms. Escherichia coli and Enterococcus spp. were detected in all samples, regardless of sludge storage time. Phages were detected in 80% of samples. Salmonella spp. were detected in 70% of the untreated septage and 60% of septage sludge samples. Concentrations of phages and bacteria tested in septage sludge after many years of tank storage were much higher than the expected levels. Helminth ova were present in 95% of untreated septage samples with an average of 450 ova l− 1, and were detected in all septage sludge samples with an average of 16,000 ova l− 1. Twelve varieties of helminth ova were identified. More helminth ova varieties in higher concentrations were found in septage than those reported from stool samples. The varieties' frequency ranged from 10% to 50% and Ascaris lumbricoides predominated. Results show that pathogens and indicator micro-organisms, especially helminth ova, accumulate in sludge. Thus helminth ova should be considered when septage sludge is treated and used for agriculture. Proper health protection measures must be applied for people handling septage.  相似文献   

14.
近两年来,工程公司在提高市场竞争意识、推动市场化进程中做了大量工作,其中坚持走出去的方针是我们自我加压、推行加快市场化步伐的一个重要战略步骤。  相似文献   

15.
新时期广东城市化的新特点   总被引:4,自引:0,他引:4  
吕拉昌 《规划师》2004,20(12):84-86
新时期广东城市化出现以下特点:知识源导向、城市由单体向群体化发展、产业集群推动、政府主导自上而下的集约化发展、城镇化向城市化转变、由重“数量”发展向重“质量”发展的转变。  相似文献   

16.
《Planning》2022,(5)
在市场条件下高校基建财务人员在加强日常财务管理的同时,必须树立起高度的工作责任心,抓好事前监督、事中监督、事后监督三个环节,全面理解、贯彻执行《高等学校财务制度》,管好用好各项基本建设资金,提高基建财务管理水平,更好地完成高校各项基建任务,以有限的投资,最快的建设速度,获得最大的投资效益。  相似文献   

17.
趋势一:CBD区域写字楼集中放量从各区域规划方案上看,CBD区域多数项目在03~04年处于项目的报批手续及拆阶段,预计2005年正式推向市场,因此2005年CBD区域将成为北京市场供应集中的域,区域即将供应的项目有北京财富中心(二期)、金地国际花园、万达广场、SOHO尚都、万通中心、世纪财富中心、怡禾国际中心、光华国际等。除去未知项目,2005CBD写字楼办公面积的供应量为60万平方米左右。中关村区域经过一段时间的集中供后开始逐步放缓,2005年供应的体量相对较大的项目有中关村金融中心、新中关。金街区域可能开盘的项目只有2个:英蓝国际中…  相似文献   

18.
19.
浅谈我国工程项目建设成本控制存在的问题   总被引:2,自引:0,他引:2  
郑保京 《山西建筑》2011,37(30):233-235
结合目前我国施工企业工程项目成本管理现状,对工程项目成本管理过程中存在的问题进行了较详细的分析,并提出了一些解决问题的办法,以做好项目成本控制工作,进而增强企业经济实力。  相似文献   

20.
Ozone concentrations have been measured in Jerusalem since 1977 by a chemiluminescent ozone meter. During the last five years ozone levels have increased considerably. In order to test whether this increase reflected the growth in the number of motor vehicles or was caused by atmospheric conditions, the summer data of the last five years were analyzed. Ozone levels were characterized by the daily one-hour maxima; the atmospheric factors considered were temperature, insolation and stability. A multiple regression equation was computed and a correlation coefficient r = 0.77 obtained. The yearly mean reduced ozone levels showed a definite trend, which reflected the corresponding trend in the number of motor vehicles.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号