共查询到20条相似文献,搜索用时 15 毫秒
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Gerhard Stenzel 《Beton- und Stahlbetonbau》2005,100(4):277-288
Concrete Floor Slabs for Indoor and Outdoor Areas – Design and Construction Concrete floor slabs for industrial buildings are used as driveways, stock areas and foundations, e. g. for high rack warehouses. It is very exacting to serve the customer's demands as for slippery safety, evenness, wear and chemical resistance, durability and stability. Especially for concrete floor slabs it is particularly important to have an entire view on the construction and building requirements to fix an economic solution in cooperation with the client. The aim of this article is to summarize the substantial design and construction rules for concrete floor slabs in order to facilitate the finding of an ideal solution. 相似文献
13.
14.
15.
Fast alle Schulräume werden in Deutschland ausschließlich über Fenster mit Außenluft versorgt. Messungen haben gezeigt, dass die Belüftung der Schulräume vor allem in der kalten Jahreszeit unzureichend ist. Hybride Lüftungssysteme mit einer automatischen Unterstützung der Fensterlüftung könnten eine Möglichkeit bieten, die Häufigkeit schlechter Innenluftqualität in Schulen zu minimieren. Hierbei ist die Anordnung der dezentralen Zuluftöffnungen in den Fassaden eine der kritischsten Systemkomponenten, und es besteht gerade bei Schulgebäuden weiterer Untersuchungs‐ und Optimierungsbedarf. Im Rahmen des vom Bundesministerium für Wirtschaft und Technologie geförderten Verbund‐ projektes “Heizenergieeinsparung, thermische Behaglichkeit und gute Luftqualität in Schulgebäuden durch hybride Lüftungstechnik” werden die Eigenschaften von Klassenräumen im Landkreis Miesbach bezüglich der Temperierung, Belüftung und Belichtung aufgenommen. Die Begehung von 22 Schulen im Landkreis Miesbach ermöglicht für einen gesamten Landkreis die Bewertung der baulichen Gegebenheiten, welche die raumklimatischen Verhältnisse entscheidend beeinflussen. Die Belegungsdichte der Klassenräume im Landkreis Miesbach ist eher als normal bis gering einzustufen, da in ca. 80 % der Räume der Mindestwert von 2 m2 je Schüler eingehalten wird. 88 % der untersuchten Räume weisen eine mittlere bis hohe thermische Masse auf. Die meisten Klassenräume im Landkreis haben einen Fensterflächenanteil von 30 bis 60 %. Etwa 50 % der Räume besitzen keinen Sonnenschutz. Der bauliche sommerliche Wärmeschutz muss überwiegend als unzureichend bewertet werden. Etwa zwei Drittel der Klassenräume weisen eine gute bis mittlere Tageslichtversorgung auf. Die Klassenräume werden über Fenster belüftet. Die Fassaden besitzen vielfältige Öffnungsmöglichkeiten, wobei Drehkippflügel und Schwingflügel am häufigsten angetroffen werden. Equipment of classrooms with systems for maintaining temperature, for ventilation and for illumination. Most German classrooms are not equipped with mechanical ventilation systems. Natural ventilation controlled by the occupants opening the windows is the main way to provide fresh air. Measurements in real classrooms showed that the ventilation especially in cold season is insufficient. Hydrid ventilation systems with automatically controlled windows might reduce the prevalence of high carbon dioxide concentration inside the classrooms. The position of the air supply opening in the façade is the most sensible design task. There is still a big potential for optimization. In the frame of the project “Energy saving, thermal comfort and good indoor air quality in schools using hybrid ventilation” supported by the German Federal Ministry for Economic Affairs and Technology the properties of classrooms in the county Miesbach/Germany regarding thermal comfort, ventilation and illumination were collected. In sum data of 106 classrooms in 22 schools were collected. The density of persons is normal to low. Approximately 80% of the rooms offer at least 2 or more square meter per pupil. 88% of the investigated classrooms are built with medium or high thermal mass. The glazed facade area is between 30 and 60% for most of the classrooms. 50% of the classrooms do not have any sun shading device. The summer overheating protection by passive means is insufficient. Two thirds of the classrooms offer a good to acceptable daylight condition. The classrooms are ventilated by opening the windows. There are different opening types of the windows and several combinations of the types in the façades. Tilt and turn windows and the horizontally pivot‐hung type are the most prevalent types. 相似文献
16.
17.
18.
19.
20.
The second Stelasund crossty – Structural design and erction of the composite and cable‐stayed bridge. Together with the construction of the new Baltic autobahn A 20 Lübeck – Stettin the Rügen feeder “B 96 n Stralsund/Rügen”, approx 55 km long, between the A 20 in the region of Grimmen and the town of Bergen on Rügen is also being realised. With the construction of the new “B 96 n Stralsund/Rügen” Rügen feeder an effective transport link between the largest German island, Rügen, and the German and European long‐distance road network is being implemented. An essential component of the whole building project is the second Strelasund crossing between the town of Stralsund and the island of Rügen. The main structure of the 2.8 km long bridge design is configured as a stayed cable bridge. 相似文献