共查询到19条相似文献,搜索用时 109 毫秒
1.
2.
3.
4.
根据多个印度电站项目的设计,在制粉系统、烟风系统等其它锅炉岛设计方面,对印度电厂与国内电厂设计要求进行了对比分析,并提出了设计方案和设计注意事项. 相似文献
5.
6.
7.
结合印度CEA火电厂设计导则和国内规范,以印度某300MW火电厂工程为例,对其汽轮机主要汽水系统和设备选型设计与国内常规火电工程进行对比分析,总结了印度火电工程的设计特点及其依据,可为同类型印度火电工程的合同谈判提供更多的经验,对这些工程的设计具有借鉴意义。 相似文献
8.
论述了影响除灰系统选择的因素,介绍了印度Sagardighi 2×300MW电站工程项目中的除灰系统主要设备组成及工艺特点,总结了其运行维护的优点及经济效益。 相似文献
9.
10.
11.
本文在职业技术教育领域引入整体情境教学理论,倡导一种“整体关联”的教学理念。作者对整体情境教学的概念、理论基础、特点、实施方法、以及整体情境教学中学生与教师的角色进行了较为详尽的阐述,希望能为我们当前的职教教学改革提供参考。 相似文献
12.
印度某电厂工程锅炉主要辅机选型探讨 总被引:1,自引:0,他引:1
简要介绍某印度电站工程锅炉主要辅机选型方案,并结合其它印度电站项目,总结出在印度电站工程设计中锅炉主要辅机选型应注意的一些共性问题及其解决方案,提出的结论和建议对印度电站工程设计具有一定的参考性。 相似文献
13.
《Education, IEEE Transactions on》1982,25(4):150-154
In this paper we describe a new graduate education program involving industry-university cooperation in the form of a partnership between Fairchild Industries, Germantown, MD, and the University of Maryland, College Park. We analyze the reasons that made such a partnership desirable to the company and to the university. We describe the nature and main features of the progam, compare it to earlier similar programs, communicate our experiences with it during its frst years of operation, and discuss the outlook for its future. 相似文献
14.
15.
通过对印度电力市场的现状 ,介绍了印度电力工业的政策、燃料及运输状况以及印度电力市场对电力设备的具体要求。表 5 相似文献
16.
本文结合印度某发电工程EPC总承包项目,就项目管理模式的选择,对印度分包商的管理,对合同与索赔的管理,对项目风险的管理,谈谈体会。 相似文献
17.
S. R. Samantaray 《电力部件与系统》2014,42(3-4):262-266
Abstract The Indian power industry is one of the fastest growing sectors and needs a paradigm shift through next-generation automation to handle the operational challenges. Presently, the Indian power sector possesses a number of issues, such as minimizing transmission and distribution losses, power theft, inadequate grid infrastructure, low metering efficiency, and lack of awareness etc. This gap can only be bridged by bringing smart grid initiatives into the Indian power industry. 相似文献
18.
Naveen Upreti Raju Ganesh Sunder Narendra Dalei Sandeep Garg 《The Electricity Journal》2019,32(10):106671
The challenges to Indian Power Transmission System identified in the literature must be given timely-focus to reach an “Uninterrupted Power Supply” status in the near future. This study, thus, investigates inter-relationships among the challenges along with their criticality using Total Interpretive Structural Modelling and Analytic Hierarchy Process. Critical challenges with the highest driving power require an immediate policy level intervention to strengthen the Indian Power Transmission System. 相似文献
19.
《The Electricity Journal》2004,17(1):11-15
It is unlikely that any proposed solution to the country’s power woes will be universally popular. Even a workable consensus depends on public-private partnership, federal-state cooperative federalism, and the ability to find effective solutions among the interlocking alternatives proposed by engineers and economists. 相似文献