In order to raise the reliability of operation of the system of end glands of K-300-240 turbines at the Konakovo State Regional Power Plant (Konakovskaya GRÉS), the system for feeding steam to the end glands of high-pressure and intermediate-pressure cylinders has been updated. The updating included reconstruction of chimneys at the suggestion of the Komtek-Énergoservis Co. and feeding of cooling steam to the zone of the third compartment of the front end gland of the intermediate-pressure cylinder. The measures taken increased the reliability of operation of the system of turbine glands, eliminated oil watering due to steaming, and reduced the temperature deformations of chimney gland yokes.  相似文献   

3.
The monitoring and control systems at the 500 MW coal-dust power generating units No. 7, 8, and 9 at the Reftinskaya GRéS have been modernized using information-regulator systems. Layouts for instrumental construction of these systems and expanded algorithmic schemes for the automatic frequency and power control system and for the boiler supply and fuelling are discussed. Results from tests and normal operation of the automatic frequency and power control system are presented. Translated from élektricheskie Stantsii, February 2009, No. 2, pp. 47–53.  相似文献   

4.
This is an analysis of computational and analytical studies of the suitability of a wide range of Russian coals, and of industrial-scale combustion tests of several Kuznetsk coals, including a mixture of Krasnobrodskii and ékibastuz coals in a 1:1 proportion, for use in the 500 MWunits of the Reftinskaya GRéS (State regional electric power plant), where ékibastuz coal is traditionally used.  相似文献   

5.
6.
Work done by JSC “Interavtomatika” and the Iriklinskaya GRéS (State Regional Electric Power Plant) to create automatic frequency and power control systems is reported. This involved reconstructing the turbine regulator systems and modernizing all the regulators for the power generator unit (those coupled to and those not coupled to the automatic frequency and power control systems) and the automatic burner control systems on the basis of a unified Simatic PCS7 PS controller system for the four 300 MW power generation units at the Iriklinskaya GRéS.  相似文献   

7.
8.
9.
Methods of normalizing the thermal expansions that occur in turbo units of different powers are considered. A modern solution for the assembly of sleeve joints using a hydraulic instrument to increase the vibration reliability is proposed. The measures described for repairing turbo units enable the amount of effort and time of subsequent capital repairs to be reduced considerably for relatively low initial costs.  相似文献   

10.
The status of water-development works at the Sayano-Shushenskaya HPP during operation in the winter of 2009 – 2010 is described.  相似文献   

11.
12.
Results of the use of automatic hydrogen-content meter for controlling the parameter of hydrogen in the primary coolant circuit of the Kola nuclear power plant are presented. It is shown that the correlation between the hydrogen parameter in the coolant and the hydrazine parameter in the makeup water can be used for controlling the water chemistry of the primary coolant system, which should make it possible to optimize the water chemistry at different power levelsTranslated from Élektricheskie Stantsii, No. 12, December 2004, pp. 31 – 33.  相似文献   

13.
1.  Alteration of the follow-up circuit of the SC in the type ÉGR-M SG during operation of the units in a group control system provides the possibility of smooth transfer of the unit out of the APGC system, which increases the operating reliability of the APGC system in an overcurrent control regime and in eliminating emergency situations.
2.  After an additional check, the alteration of the follow-up circuit of the SC can be used for a second modification of the type ÉGR-2M governors of turbines.
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 33–35, January, 1989.  相似文献   

14.
15.
The effects of optimized operation principles implemented at reservoirs on the Wujiang River in southwest China between September 2009 and April 2010 under drought conditions were analyzed based on operational data collected from the Guizhou Wujiang Hydropower Development Co., Ltd. A set of linear regression equations was developed to identify the key factors impacting the electric power generation at reservoirs. A 59% reduction in the inflow discharge at the Hongjiadu Reservoir led to a decrease of only 38% in the total electric power generation at the Hongjiadu, Dongfeng, Suofengying, and Wujiangdu reservoirs on the Wujiang River, indicating that optimized operation can play an important role in drought management. The water level and the amount of other water inputs at the Hongjiadu Reservoir and the outflow discharge at all of the reservoirs except the Wujiangdu Reservoir were key factors affecting the total electric power generation at reservoirs on the Wujiang River under optimized operation.  相似文献   

16.
17.
Conclusions  
1.  The off-design operating regime of the Chirkey hydrostation with difficulties in producing electricity and with long periods of high upper pool levels under conditions of seismic activity negatively affects the reliability of the surrounding rock mass and should be brought into correspondence with the design.
2.  Long and nonuniform operation of the Chirkey hydrostation outlet in 1997 showed sufficient reliability and efficiency of the structures, but activated negative processes in the surrounding rocks masses. The rupture of two rock bolts supporting the unstable mass on the left bank and increase of the rate of settlement of the left wall of the canyon are a warning signal. This requires a thorough examination of all support members and development of outlet operating rules.
3.  The consequences of the operation of the outlet for the reliability and stress-strain state of the dam sould be specially and comprehensively studied and analyzed. It is urgently required to determine the forces in the rock bolts supporting the unstable mass, to determine the magnitude and places of maximum stresses in the dam, and to monitor the rate of movement of the left-bank slope.
4.  It is urgently necessary to organize appropriate seismometric monitoring on the dam and to obtain daily (weekly) bulletins of the Dubka seismic station and periodic reports of the OMP DNTs on the seismological situation in the region.
5.  Before organizing seismometric monitoring on the dam or geodynamic test area of the Center of the Geodynamic Observation Service in the Electric Power Industry, it is necessary to use the earthquake prediction method of the Joint Institute of Physics of the Earth with the help of the dam's existing measuring systems. For this purpose it is advisable to automate the reversed plump lines by the “Sibgeoinform” or DIGéS (Diagnosis of Hydraulic, Power, and Other Essential Structures) method and to increase the accuracy and frequency of seepage observation.
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 7, pp. 6–10, July, 1998.  相似文献   

18.
19.
20.
Power Technology and Engineering - The variation of the velocity of P-waves in the base and abutments of the dam and in the foundation of the powerhouse is analyzed. The zones of man-induced impact...  相似文献   