共查询到20条相似文献,搜索用时 15 毫秒
1.
通过调查和分析研究,从企业领导的务实创新、提高创新能力、创建学习型企业、建立独具特色的企业文化等方面提出了国有煤炭企业实现可持续发展的若干途径,从而加快企业的发展步伐。 相似文献
2.
3.
《International Journal of Project Management》2019,37(5):784-801
Accelerating time to impact is a serious and important challenge for today's organizations. This paper combines the literatures of project acceleration and benefit management to inquire into the possibilities of accelerating time to impact. Specifically, it explores a practitioner-driven Danish initiative targeted at increasing the speed at which project benefits are attained, and it analyzes why some projects were able to achieve benefits faster than others. The initiative functions as a major social experiment, where the same project methodology was implemented in several Danish project-based organizations. We analyze five of these organizations. We identified reasons for the differences and grouped them in a conceptual model: the ‘house of time to impact’ with three areas: valuing speed, owning speed and entraining speed in the organization. The paper's contribution is the bridge between the literatures on benefit and time management, bringing two pressing issues together. The contribution to practice lies in the considerations and stories of other organizations attempting to reconcile the increasing need for effectiveness. 相似文献
4.
从投资方的角度出发,对建设项目投资决策阶段、设计阶段、施工阶段、竣工结算和决算阶段如何有效控制工程造价进行了论述,以保证项目投资控制目标的实现,从而取得较好的投资效益和社会效益。 相似文献
5.
结合冬季施工项目特点及施工进度的要求,分析了冬季施工项目的主要内容及施工前的技术准备工作,并依据冬季施工混凝土工程的基本原理,对混凝土施工质量的控制措施及方法进行了研究说明,以供参考。 相似文献
6.
7.
《Automation in Construction》2006,15(1):84-97
This paper introduces the system's perspective of the dynamic planning and control methodology (DPM), aimed to support both the strategic and the operational aspects of project management. For this objective, a new modeling framework that integrates system dynamics and network-based tools is presented in this paper. The proposed framework adopts system dynamics as a core simulation engine for strategic project management and network-based tools as a wrap layer for operational project management. To implement the DPM framework, a web-based system has been developed within a collaborative environment. The developed system provides great support to both the strategic and operational aspects of project management by integrating familiar network concepts with system dynamics to analyze the overall strategic and operational project performance. 相似文献
8.
A new system has been developed for dynamic project management and control known as Planning Orientated Evaluation Methods (POEM) which has been considered as a core project evaluation system incorporating cost and time analysts. The performance control gives the manager a direct influence on the project completion date and rate of spend. 相似文献
9.
实现楼宇群整体节能控制管理——博瑞建筑节能管理中心系统解决方案 总被引:1,自引:0,他引:1
博瑞公司作为国内建筑领域专业化的节能服务机构,积极响应国家低碳经济的发展战略,致力于为公共机构和大型公建提供全方位的节能服务,以节能技术创新促进建筑节能事业,针对大型公建能耗高、管理难度大等问题,成功推出博瑞建筑节能管理中心,率先打破国内楼宇自控只监不控、无法高效节能运行管理的技术瓶颈,实现大区域内楼宇群用能系统的远程集中监控与科学节能管理,达到楼宇群用能系统的整体能量匹配与节能。 相似文献
10.
《International Journal of Project Management》2020,38(8):534-547
International development projects face uncertainty challenges more often than other projects. The strategic prospective approach is based on understanding the future and accepting uncertainties. This theory is presented as an appropriate methodology for this type of projects. This study presents the case study of a development project designed and executed according to this discipline. The project involved implementing an innovative model of higher technical education and employability for low-income young people in the Department of Cauca (Colombia). The results show that despite the region's circumstances and the overall context, future problems were identified in advance, and this had a positive impact on the project. From international development, project management can learn flexibility to deal with the uncertainty and participative processes required for managing stakeholders, and the strategic prospective approach can be a good alliance in this challenge. 相似文献
11.
控制工程造价的有效途径 总被引:1,自引:1,他引:1
从工程项目决策阶段、设计阶段、招投标阶段、施工实施阶段和竣工结算阶段等方面分析了工程项目管理对工程造价的影响,提出了有效控制工程造价的途径,以避免三超现象的发生。 相似文献
12.
针对工程造价控制的重要性,对招标准备阶段、投标报价及评标阶段、工程竣工决算阶段的造价控制进行了深入探讨,强调了审查隐蔽验收记录的重要性,以有效控制工程造价,更好地维护建设单位和施工单位的经济利益。 相似文献
13.
从设计、招投标、项目实施和竣工结算四个阶段探讨了工程建设中工程造价的控制,主要分析了项目实施阶段控制造价存在的问题,并提出了相应的解决措施,从而有效控制工程造价。 相似文献
14.
15.
就当前施工企业利润回收率较低问题,概括出了项目工程成本的含义。着重论述了进行项目工程成本控制的原因及几个主要途径,诸如理顺企业与项目部的关系,实行工点技术干部综合责任承包制,把好物资设备进出关,加强合同计价管理,合理筹措与运用资金以及促进廉政建设等等。同时还对如何进行成本控制提出了几点看法。 相似文献
16.
阐述了建设项目工程造价控制的重要意义,探讨了建设项目决策阶段、设计阶段和实施阶段的工程造价控制措施,以期最大限度地控制工程造价,实现较为理想的投资效益。 相似文献
17.
结合自身工作实践,从项目成本控制的角度探讨了工程项目管理办法,具体阐述了人工费、材料费、机械使用费及间接费的控制措施,提出了项目经理部对项目进行成本控制时应遵循的基本原则,以期合理有效控制项目成本。 相似文献
18.
论述了建筑工程造价超预算的原因,针对原因提出了提高预算编制质量、强化编制人员能力与素质、重视项目实施阶段的预算执行、控制工程造价的调整等具体的超预算控制方法,从而保障造价波动处于合理范围内,实现建筑工程建设的经济目标。 相似文献
19.
介绍了建筑工程造价超预算的原因,在此基础上分析了建筑工程造价超预算控制的意义,并且提出对超预算控制的一些可行性对策,旨在对建筑工程造价超预算进行有效控制。 相似文献