首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
《Soils and Foundations》2021,61(5):1319-1342
Geosynthetic-reinforced and pile-supported (GRPS) systems provide an economic and effective solution for embankments. The load transfer mechanisms are tridimensional ones and depend on the interaction between linked elements, such as piles, soil, and geosynthetics. This paper presents an extensive parametric study using three-dimensional numerical calculations for geosynthetic-reinforced and pile-supported embankments. The numerical analysis is conducted for both cohesive and non-cohesive embankment soils to emphasize the fill soil cohesion effect on the load and settlement efficacy of GRPS embankments. The influence of the embankment height, soft ground elastic modulus, improvement area ratio, geosynthetic tensile stiffness and fill soil properties are also investigated on the arching efficacy, GR membrane efficacy, differential settlement, geosynthetic tension, and settlement reduction performance. The numerical results indicated that the GRPS system shows a good performance for reducing the embankment settlements. The ratio of the embankment height to the pile spacing, subsoil stiffness, and fill soil properties are the most important design parameters to be considered in a GRPS design. The results also suggested that the fill soil cohesion strengthens the soil arching effect, and increases the loading efficacy. However, the soil arching mobilization is not necessarily at the peak state but could be reached at the critical state. Finally, the geosynthetic strains are not uniform along the geosynthetic, and the maximum geosynthetic strain occurs at the pile edge. The geosynthetic deformed shape is a curve that is closer to a circular shape than a parabolic one.  相似文献   

2.
The stress conditions of geosynthetic reinforcements (GRs) are crucial in achieving the accurate serviceability design of geosynthetic-reinforced pile-supported (GRPS) embankments. However, the sensitivity of load distribution to the settlement process has been reported in geosynthetic-reinforced embankment overlying cavities. In this study, a three-dimensional model embankment was used to perform experiments and evaluate the load acting on the GR. A flexible pressure-mapping sensor was introduced to investigate the pressure distribution for two types of supporting conditions: partitioned displacement by multiple movable trapdoors and even trapdoor settlement underneath different subsoil materials. The results showed that the load on the GR was concentrated on the strip areas between adjacent pile heads along with the settlement. The measured load on the GR strip area was related to the settlement process and finally exhibited a U-shaped distribution after detachment from the support underneath. The soil arch height in the subgrade continuously increased with the settlement; meanwhile, the pile head load increased rapidly at first and then decreased slightly or remained stable depending on the foundation support stiffness. For both types of settlement behaviours, soil arching exhibited stress history-related characteristics that influence the load transfer in GRPS embankments.  相似文献   

3.
Given the limit studies on the behavior of GRPS embankments with different numbers of geosynthetic layers and pile caps in a triangular pattern, this paper conducted a series of three-dimensional (3-D) numerical analyses. The numerical model was verified based on a well-instrumented large-scale test. A 3-D soil arch model was proposed for pile caps in a triangular pattern, in which the crown of the upper boundary was approximately 1.4 times the clear spacing of pile caps. Inclusion of geosynthetic reinforcement reduced the soil arching effect but increased the total load carried by the piles. For the case with three geosynthetic layers, the lower layer had a significant effect on load transfer than the middle and upper layers, but each layer had an almost proportional effect on mitigating the differential settlement on the top of the gravel cushion. The maximum strains in the reinforcement concentrated on the geosynthetic strips bridging over two adjacent square cap corners.  相似文献   

4.
Three centrifuge model tests were conducted to investigate the influence of the number of geosynthetic layers and the pile clear spacing on the global performance of Geosynthetic-Reinforced Pile-Supported (GRPS) embankments with side slopes constructed on soft soil foundations. This study found that the change of the geogrid number from one to two did not significantly affect the foundation settlement, the geogrid deflection, and the vertical stress at the embankment base. For the GRPS embankment with a single geogrid layer, the geogrid strain distribution at the embankment base showed an “M” shape along the transverse direction with the maximum strain near the embankment shoulder. When two geogrid layers with sand in between were used, the upper and lower layers showed different strain distributions with the maximum strains happening near the embankment shoulder and at the center of the embankment for the upper and lower layers respectively. The strains of the upper geogrid were smaller than those of the lower geogrid. Smaller pile clear spacing reduced the geogrid deflection and the foundation settlement. Despite the change of the pile clear spacing, the progressive development of soil arching with the normalized displacement at the embankment base followed a similar trend without an obvious stress recovery stage.  相似文献   

5.
路桥过渡段桩承式加筋路堤现场试验研究   总被引:6,自引:0,他引:6  
桩承式加筋路堤与路堤填土加筋技术联合应用于黄土地区路桥过渡段,减小路桥过渡段差异沉降和桥头跳车现象。通过 现场试验 对桩承式加筋路堤中心轴和路肩对应位置处格栅上、下表面桩顶和桩间土土压力、桩间格栅变形以及加筋路堤各断面格栅上、下表面土压力和格栅变形进行监测分析,研究结果表明:桩承式加筋 路堤通过土拱效应和张拉膜效应将路堤荷载向桩顶转移,从而可有效减小桩间土荷载;桩承式加筋路堤中心轴处路堤荷载转移主要以土拱效应为主,以张拉膜效应为辅,而路肩处格栅张拉膜效应较显著,路堤荷载传递由土拱效应和张拉膜效应共同完成,格栅在路肩处发挥作用效果大于路堤中心轴处;路堤加筋技术在桥台附近减载作用明显,随着距桥台距离的增加,减载作用逐渐减弱。  相似文献   

6.
For design of a geosynthetic-reinforced pile-supported (GRPS) embankment over soft soil, the methods used to calculate strains in geosynthetic reinforcement at a vertical stress were mostly developed based on a plane-strain or two-dimensional (2-D) condition or a strip between two pile caps. These 2-D-based methods cannot accurately predict the strain of geosynthetic reinforcement under a three-dimensional (3-D) condition. In this paper, a series of numerical models were established to compare the maximum strains and vertical deflections (also called sags) of geosynthetic reinforcement under the 2-D and 3-D conditions, considering the following influence factors: soil support, cap shape and pattern, and a cushion layer between cap and reinforcement. The numerical results show that the maximum strain in the geosynthetic reinforcement decreased with an increase of the modulus of subgrade reaction. The 2-D model underestimated the maximum strain and sag in the geosynthetic reinforcement as compared with the 3-D model. The cap shape and pattern had significant influences on the maximum strains in the geosynthetic reinforcements. An empirical method involving the geometric factors of cap shape and pattern, and the soil support was developed to convert the calculated strains of geosynthetic reinforcement in piled embankments under the 2-D condition to those under the 3-D condition and verified through a comparison with the results in the literature.  相似文献   

7.
An analytical model is presented for the design of geosynthetic-reinforced and pile-supported (GRPS) embankments in this paper. The originality of the proposed solution lies in the fact that it allows considering the influence of the subsoil consolidation on the soil arching and geosynthetic strain. A nonlinear function is implemented to describe the subsoil behavior with the consolidation process in a closed-form solution. A simplified approach is then presented to link the arching development with the subsoil consolidation. The arching theory is combined with the tensioned membrane theory and the soil-structure interaction mechanisms to provide a simple and suitable design approach that enables a realistic approximation for designing soil–geosynthetic systems. The analytical model is capable of performing an ultimate and serviceability limit state design of GRPS embankments. While current methods cannot fully address the important effects of the subsoil consolidation, the analytical results suggested that arching and differential settlements increase with an increase of the subsoil consolidation degree. The analytical model is compared to field measurements and five other design standards for several full-scale field tests to study its validity. The results showed a satisfactory agreement between the proposed model and measured data, and generally better results are obtained as compared with other design methods.  相似文献   

8.
Soil arching effect results from the non-uniform stiffness in a geosynthetic-reinforced and column-supported embankment system. However, most theoretical models ignore the impact of modulus difference on the calculation of load transfer. In this study, a generalized mathematical model is presented to investigate the soil arching effect, with consideration given to the modulus ratio between columns and the surrounding soil. For simplification, a cylindrical unit cell is drawn to study the deformation compatibility among embankment fills, geosynthetics, columns, and subsoils. A deformed shape function is introduced to describe the relationship between the column and the adjacent soil. The measured data gained from a full-scale test are applied to demonstrate the application of this model. In the parametric study, certain influencing factors, such as column spacing, column length, embankment height, modulus ratio, and tensile strength of geosynthetic reinforcement, are analyzed to investigate the performance of the embankment system. This demonstrates that the inclusion of a geosynthetic reinforcement or enlargement of the modulus ratio can increase the load transfer efficiency. When enhancing the embankment height or applying an additional loading, the height of the load transfer platform tends to be reduced. However, a relatively long column has little impact on the load transfer platform.  相似文献   

9.
Piled embankments provide an economic solution to the problem of constructing embankments over soft soils. The piles and geosynthetic combination can alleviate the uneven surface settlements that sometimes occur in embankments supported by piles without reinforcement. The main focus of this paper is to present a new method for analysis of an embankment of granular fill on soft ground supported by a rectangular grid of piles and geosynthetic. This method is based on consideration of the arching effect in granular soil and similar to the method proposed by Low, B.K., Tang, S.K., Choa, V. [1994. Arching in piled embankments. Journal of Geotechnical Engineering 120 (11), 1917–1938]. The main refinements are: inclusion of a uniform surcharge load on the embankment fill, individual square caps were used, and taking into account the skin friction mechanism, which contributes to soil–geosynthetic interface resistance. Using this method, the influence of embankment height, soft ground depth, soft ground elastic modulus, and geosynthetic tensile stiffness on efficiency, stress concentration ratio, settlement ratio, tension of geosynthetic, and axial strain of geosynthetic are investigated. The results show that inclusion of a geosynthetic membrane can increase the fill load carried by piles. As a result, both the total and differential settlements of the embankment can be reduced. The new design method was verified against several current design methods. Theoretical solution showed that BS8006 [1995. Code of Practice for Strengthened/Reinforced Soils and other Fills. British Standards Institution, London, p. 162] and Guido, V.A., Kneuppel, J.D., Sweeny, M.A. [1987. Plate loading tests on geogrid-reinforced earth slabs. In: Proceedings of the Geosynthetics '87, New Orleans, USA, IFAI, pp. 216–225] methods overpredict the vertical stress acting on the geosynthetic due to that the reaction of the soft ground on the geosynthetic is not considered in their methods. It also showed that the present method is in good agreement with Low, B.K., Tang, S.K., Choa, V. [1994. Arching in piled embankments. Journal of Geotechnical Engineering 120 (11), 1917–1938] method.  相似文献   

10.
为了研究桩承式加筋路堤在移动荷载作用下的特性,采用FLAC 3D软件建立了移动荷载作用下道路的三维动力流固耦合分析模型,对桩承式加筋路堤和天然路堤在移动荷载作用下的竖向变形、桩土应力比、超孔隙水压力、加速度等进行了对比分析,并研究了不同轴载对路堤竖向变形的影响。分析结果表明:移动荷载作用下,桩承式加筋路堤通过桩体土拱效应和格栅张拉膜效应的联合作用,其路面竖向变形、桩土应力比、超孔隙水压力、加速度均比天然路堤的结果明显减小;随着轴载的增加,桩承式加筋路堤路面竖向变形不断增大。  相似文献   

11.
This study developed a large-scale laboratory apparatus to evaluate the load transfer behavior of basal reinforced embankment fill because of soil arching and geogrid tensile force. A 3D trapdoor-like test system performed five scaled model tests using analogical soil. The instrumentation system involved multiple earth pressure cells, dial gauges, multipoint settlement gauges, and geogrid strainmeters. Comprehensive measurements were performed to investigate the evolution of soil stress and displacement at specific fill elevations with variations in the area replacement ratio and geogrid stiffness. The critical height of the soil arching was determined to be ~1.1–1.94 times the clear pile spacing based on the soil stress and displacement profiles. The distribution of the geogrid tensile strain between and above the adjacent caps demonstrated that the maximum geogrid strains occur on top of the caps, and the tensioned geogrid effect on the load transfer efficiency was evaluated. The cap size and center-to-center pile spacing affect the pile efficacy more significantly than the stiffness of the geogrid. The measured critical heights of arching, stress concentration ratios, and geogrid strain matched those calculated by several well-recognized analytical methods. This experimental program facilitates the development of arching models that account for differential settlement impact.  相似文献   

12.
Understanding the load transfer mechanism can support engineers having more economical design of geosynthetic reinforced piled embankments. This study aims to investigate the load transfer mechanisms by two different numerical methods including the Discrete Element Method (DEM) and the Finite Difference Method (FDM). The DEM model adopts (a) discrete particles to simulate the micro-structure of the granular materials and (b) coupled discrete element – finite element method (DEM-FEM) to capture the interaction between granular materials and geotextiles. On the other hand, the FDM model uses an advanced constitutive soil model considering the hardening and softening behaviour of the granular materials. The numerical results show that the geotextiles can only contribute to the vertical loading resistance in cases where the soils between piles are soft enough. In terms of design, an optimum value of the geotextile tensile stiffness can be found considering the load, the soft soil stiffness and the thickness of the embankment. Both the DEM and the FDM show that a high geotextile tensile stiffness is not required since an extra stiffness will slightly contribute to the efficiency of the geosynthetic reinforced piled embankments. Nevertheless, both models are useful to optimize the design of geosynthetic reinforced piled embankments.  相似文献   

13.
介绍了桩承式加筋路堤足尺模型实验装置,该实验装置利用PVC材料水袋模拟桩间软土,从而在一定程度上能够控制桩土差异沉降。路堤填筑过程中测试了路堤内部土压力以及格栅拉力,并且重点分析了桩帽和桩间不同位置处土压力以及格栅拉力随填筑高度的变化规律。实验结果表明,路堤在填筑过程中发生了明显的土拱效应,路堤填筑完成后桩土应力比约为8.46,土拱高度约为1.125倍桩间净距;单向土工格栅能够进一步将桩间上方土压力传递到桩顶上方;随着路堤填筑高度的增加,格栅拉力增长并不大,路堤横向滑移引起的格栅拉力可以忽略不计。  相似文献   

14.
为了从更深层次理解土拱效应的工作性状,在总结桩承式路堤土拱效应中等沉面、桩体荷载分担比等问题的基础上,比较了几种桩体荷载分担比的计算方法,阐述了动荷载在桩承式路堤中的传递机理,分析了土拱效应发挥程度对动应力的影响,最后给出桩承式路堤中动应力的计算方法。研究结果表明:等沉面与土拱高度可用临界填土高度进行归一化描述,临界填土高度与桩间净距呈线性关系;桩体荷载分担比的大小与工况有关,几种计算方法有各自的适用条件;陈云敏的计算方法与实测值拟合度较高;动荷载的传递也受土拱效应的影响,随着动荷载循环次数的增加,土拱效应存在先强化后弱化的现象。  相似文献   

15.
A numerical study of the behavior of geosynthetic-reinforced embankments constructed on soft rate-sensitive soil with and without prefabricated vertical drains (PVDs) is described. The time-dependent stress–strain-strength characteristic of rate-sensitive soil is taken into account using an elasto-viscoplastic constitutive model. The effects of reinforcement stiffness, construction rate, soil viscosity as well as PVD spacing are examined both during and following construction. A sensitivity analysis shows the effect of construction rate and PVD spacing on the short-term and long-term stability of reinforced embankments and the mobilized reinforcement strain. For rate-sensitive soils, the critical period with respect to the stability of the embankment occurs after the end of the construction due to a delayed, creep-induced, build-up of excess pore pressure in the viscous foundation soil. PVDs substantially reduce the effect of creep-induced excess pore pressure, and hence not only allow a faster rate of consolidation but also improve the long-term stability of the reinforced embankment. Furthermore, PVDs work together with geosynthetic reinforcement to minimize the differential settlement and lateral deformation of the foundation. The combined use of the geosynthetic reinforcement and PVDs enhances embankment performance substantially more than the use of either method of soil improvement alone.  相似文献   

16.
There is not one generally accepted approach for the design of geogrid-reinforced pile-supported (GRPS) embankments. Relevant mechanisms include arching of the embankment material, but also the effect of geogrid reinforcement and potentially a contribution from the underlying subsoil. This paper presents a simple design approach to identify the contribution of all three mechanisms, in which the contribution of multi-layered geogrid reinforcement is also presented. To validate the theoretical predictions for the effect of geogrid reinforcement and the potential contribution of underlying subsoil, a series of three-dimensional finite element analyses are conducted. It is found that a point of ‘maximum arching’ is increased with the height of embankment. This study also presents that the reinforcement could reduce the ultimate stress on the subsoil. However, this requires significant sag of the reinforcement. It is found that the sag of reinforcement is very sensitive to the span of the reinforcement between piles, but relatively insensitive to the stiffness of the reinforcement. For a case with three layers of geogrid, the upper two grids carry relatively little tension compared to the bottom layer. This in turn leads to an approximate but simple equation of vertical equilibrium which may be of use in design.  相似文献   

17.
The performance of the floating geosynthetic-encased stone column–(GESC)-supported embankments with basal reinforcement was examined using a 3-dimensional (3D) hydro-mechanical coupling finite element model. Comprehensive parametric analyses were performed on the governing factors such as consistency of substratum soil, tensile stiffness of basal reinforcement and encasement, and embankment height. The results indicated that a higher embankment load is transferred to the surrounding soil when a GESC was constructed on a weaker substratum. This causes larger increases in the settlement and lateral displacement of the GESC on the weaker substratum. The tensile strain of the basal reinforcement and hoop strain in the encasement also increases. In addition, high tensile stiffness in basal reinforcement and encasement is necessary to ensure feasible settlement reduction in a floating GESC-supported embankment with basal reinforcement.  相似文献   

18.
加筋形式对桩承式路堤工作性状影响的试验研究   总被引:1,自引:0,他引:1  
费康  陈毅  王军军 《岩土工程学报》2012,34(12):2312-2317
对无加筋和采用不同加筋材料、加筋层数下桩承式路堤的工作性状进行了三维模型试验研究,侧重分析了桩土应力比、应力折减系数、填土中竖向应力分布、地基沉降等内容。结果表明加筋材料的设置有利于荷载向桩顶的转移,可有效减小沉降,但不同加筋形式下桩承式路堤的工作性状有所不同。使用单层或双层土工布时,路堤的荷载传递机理主要是填土的土拱效应和加筋材料的拉膜效应,但拉膜效应发挥相对较晚。使用双层格栅时,加筋材料与周围砂土形成半刚性平台。单层格栅的作用介于两者之间。试验结果与常规拉膜效应设计方法的对比表明,若假设荷载只由相邻桩间的加筋材料条带承担,计算的拉力将偏大,过于保守。  相似文献   

19.
Soil arching often occurs in geosynthetic-reinforced structures, where the underlying soil has voids, resulting in load transmission from the subsided area to surrounding less deformed area. A new method is proposed to predict load acting on gensynthetic overlying voids. The shape of soil arch and stress states of all the points at the soil arch can be obtained by combining nonlinear M-C yielding criterion, non-associated flow rule with static equilibrium of segmental arch through a dilatancy coefficient. The load applied to the geosynthetic can be determined by load transmission from the overlying soil, to the soil arch, and onto the collapsed soil. The model is verified using a model test conducted by Zhu et al. (2012), the soil pressure acting on the deflected geosynthetic is reasonably predicted. Due to the inherent nonlinear behaviour of soil, nonlinear failure criterion can better describe the stresses and deformations of the soil and geosynthetic. Soil nonlinearity has significant influence on the evaluation of arching effect. Ignoring the nonlinear behaviour of soil tends to underestimate the soil pressure acting on the geosynthetic. There exists an optimal subsidence width for which the soil pressure acting on the geosynthetic is minimal. The method used in this study is more appropriate where a large deflection occurs in the geosynthetic and provides a novel approach to evaluating soil arching under these conditions.  相似文献   

20.
陈福全  李阿池 《岩土工程学报》2007,29(12):1804-1808
具有深厚软土层的路堤若采用桩承加筋式复合地基,可提高地基承载力,减少路堤不均匀沉降,也可布置成疏桩,降低工程成本,在国内外得到越来越广泛的应用,但还没有可靠实用的设计计算方法,且现有的设计均忽略了桩间土的承载作用,这与工程实际有很大差别。基于三维土拱效应,改进Hewlett土拱效应算法,得到桩承式路堤的桩土荷载分担比,进而考虑加筋体影响以及桩间土承载作用,推导桩土应力比计算式,并将此式应用于路堤的设计。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号