首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 46 毫秒
1.
The effects of increasing nitrobenzene (NB) concentrations and hydraulic retention time (HRT) on the performance of anaerobic baffled reactor (ABR) and aerobic completely stirred tank reactor (CSTR) were studied. In the first step the NB concentration was increased from 30 to 700 mg/L at constant COD and flowrates. Maximum COD removal efficiencies in ABR varied between 88-92% as NB concentrations increased from 30 to 210 mg/L. After this dose, COD removal efficiency decreased to 85 and 79% at NB concentrations of 550 and 700 mg/L, respectively. Removal efficiencies of NB were nearly 100% for all NB concentrations in ABR reactor effluent. In the second step, COD and NB concentrations were kept constant while HRT decreased from 10.38 days to 1 day. As HRT decreased from 10.38 to 2.5 days the COD removal efficiencies in the anaerobic and anaerobic/aerobic reactor effluents were 92-94% and 97-98%, respectively. As HRT decreased from 2.5 days to 1 day COD removal efficiencies in the anaerobic and anaerobic/aerobic reactor effluents decreased to 83 and 95%, respectively. This study showed that HRT is a more important operation parameter than increasing NB concentration in ABR/CSTR sequential reactor system. Although ABR/CSTR system exhibited good COD and NB removal efficiencies, the lower HRTs slightly decreased the removal efficiencies compared to increasing NB concentration.  相似文献   

2.
An Imhoff tank was reconstructed into a 250 m3 UASB reactor in order to treat a malting plant wastewater. The UASB was inoculated with sludge from an anaerobic lagoon used for slaughterhouse wastewater treatment. After two months of operation the reactor achieved full load with an HRT of 17 h, a COD removal higher than 80% and a biogas production of 300 m3/day (77% average methane content), with an organic loading rate of 3.6 kgCOD/m3.d (0.24 kgCOD/kgVSS.d). A yield coefficient of 0.09 gVSS/gCODrem was found from a mass balance. The fat present in the inoculated sludge (48 mg/gSSV) did not affect the start up performance. Sludge from the inoculum with high content of fat (270 mg/gSSV), was separated by flotation in the first week of operation. The COD removal efficiency was scarcely influenced by the reactor operation temperature (17-25 degrees C).  相似文献   

3.
林可霉素高浓度有机废水处理技术   总被引:1,自引:0,他引:1  
王冰 《水资源保护》2008,24(4):53-57
采用厌氧颗粒和好氧活性污泥分别对内循环厌氧反应器(IC)和间歇式活性污泥法(SBR)进行污泥接种培养,研究水解酸化-IC-SBR工艺在林可霉素生产废水处理方面的运行效果。结果表明:在进水COD的质量浓度为6 000~9 000 mg/L,IC和SBR反应器中有机负荷分别为0.82 kg/(kg.d)和0.26 kg/(kg.d)左右的情况下,IC和SBR反应器分别运行60 d和7 d,COD平均去除率分别达到91%和61%,出水COD的质量浓度在300 mg/L以下,达到GB 8978—1996《污水综合排放标准》二级标准。  相似文献   

4.
This paper presents the behaviour of a full-scale expanded bed reactor (160 m3) with overlaid anaerobic and aerobic zones used for municipal wastewater treatment. The research was carried out in two experimental steps: anaerobic and anaerobic-aerobic conditions, and the experimental results presented in this paper refer to four months of reactor operation. In the anaerobic condition, after inoculation and 60 days of operation, the reactor treating 3.40 kg CODm(-3)d(-1) for thetaH of 2.69 h, reached mean removal efficiencies of 76% for BOD, 72% for COD, and 80% for TSS, when the effluent presented mean values of 225 mg.L(-1) of COD, 98 mg.L(-1) of BOD and 35 mg.L(-1) of TSS. Under these conditions, for nitrogen loading of 0.27 kgN.m(-3)d(-1), the reactor generated an effluent with mean N-org. of 8 mg.L(-1) and N-ammon. of 37 mg.L(-1), demonstrating high potential of ammonification. For the anaerobic-aerobic condition (118th day) the system was operated with thetaH of 5.38 h presented mean removal efficiencies of 84% for BOD, 79% for COD, 76% for TSS, and 30% for TKN. The reactor's operation time was less than two months, which was not long enough to reach nitrification. Regarding the obtained results, this research confirmed that this reactor is configured as a flexible and adequate alternative for the treatment of sewage, requiring relatively small area and only thetaH of 10 h that can be adjusted to the local circumstances.  相似文献   

5.
The effect of low operating temperature and pollutant concentration on the performance of five anaerobic hybrid reactors was investigated. Stable and efficient long-term (>400 days) treatment of a cold (6-13 degrees C), volatile fatty acid (VFA)-based, wastewater was achieved at applied organic loading rates (OLRs) of 5 kg chemical oxygen demand (COD) m(-3) d(-1) with COD removal efficiencies c. 84% at 6 degrees C (sludge loading rate (SLR) 1.04-1.46 kg COD kg [VSS](-1) d(-1)). VFA-based wastewaters, containing up to 14 g pentachlorophenol (PCP) m(-3) d(-1) or 155 g toluene m(-3) d(-1) were successfully treated at applied OLRs of 5-7 kg COD m(-3) d(-1). Despite transient declines in reactor performance in response to increasing toxicant loading rates, stable operation (COD removal efficiencies > 90%) and satisfactory toxicant removal efficiencies (>88%) were demonstrated by the systems.  相似文献   

6.
Aerobic granular sludge grown in a sequential batch reactor was proposed as an alternative to anaerobic processes for organic matter and nitrogen removal from swine slurry. Aerobic granulation was achieved with this wastewater after few days from start-up. On day 140 of operation, the granular properties were: 5 mm of average diameter, SVI of 32 mL (g VSS)(-1) and density around 55 g VSS (L(granule))(-1). Organic matter removal efficiencies up to 87% and nitrogen removal efficiencies up to 70% were achieved during the treatment of organic and nitrogen loading rates (OLR and NLR) of 4.4 kg COD m(-3) d(-1) and of 0.83 kg N m(-3) d(-1), respectively. However, nitrogen removal processes were negatively affected when applied OLR was 7.0 kg COD m(-3) d(-1) and NLR was 1.26 kg N m(-3) d(-1). The operational cycle of the reactor was modified by reducing the volumetric exchange ratio from 50 to 6% in order to be able to treat the raw slurry without dilution.  相似文献   

7.
High rate anaerobic technologies offer cost-effective solutions for "sewage" treatment in the temperate climate of Palestine and Jordan. However, local sewage characteristics demand amendments to the conventional UASB reactor design. A solution is found in a parallel operating digester unit that stabilises incoming solids and enriches the UASB sludge bed with methanogenic activity. The digester operational conditions were assessed by operating eight CSTRs fed with primary sludge. The results showed a high degree of sludge stabilization in the parallel digesters at SRTs>or=10 and 15 days at process temperatures of 35 and 25 degrees C, respectively. The technical feasibility of the UASB-digester combination was demonstrated by continuous flow pilot-scale experiments. A pilot UASB reactor was operated for 81 days at 6 hours HRT and 15 degrees C and was fed with raw domestic sewage. This period was subsequently followed by an 83 day operation period incorporating a parallel digester unit, which was operated at 35 degrees C. The UASB-digester combination achieved removal efficiencies of total, suspended, colloidal and dissolved CODs of respectively 66, 87, 44 and 30%. Preliminary model calculations indicated that a total reactor volume of the UASB-digester system corresponding to 8.6 hours HRT might suffice for sewage treatment in Palestine.  相似文献   

8.
The treatment of grey water in two upflow anaerobic sludge blanket (UASB) reactors, operated at different hydraulic retention times (HRTs) and temperatures, was investigated. The first reactor (UASB-A) was operated at ambient temperature (14-25 degrees C) and HRT of 20, 12 and 8 h, while the second reactor (UASB-30) was operated at controlled temperature of 30 degrees C and HRT of 16, 10 and 6 h. The two reactors were fed with grey water from 'Flintenbreite' settlement in Luebeck, Germany. When the grey water was treated in the UASB reactor at 30 degrees C, total chemical oxygen demand (CODt) removal of 52-64% was achieved at HRT between 6 and 16 h, while at lower temperature lower removal (31-41%) was obtained at HRT between 8 and 20 h. Total nitrogen and phosphorous removal in the UASB reactors were limited (22-36 and 10-24%, respectively) at all operational conditions. The results showed that at increasing temperature or decreasing HRT of the reactors, maximum specific methanogenic activity of the sludge in the reactors improved. As the UASB reactor showed a significantly higher COD removal (31-64%) than the septic tank (11-14%) even at low temperature, it is recommended to use UASB reactor instead of septic tank (the most common system) for grey water pre-treatment. Based on the achieved results and due to high peak flow factor, a HRT between 8 and 12 h can be considered the suitable HRT for the UASB reactor treating grey water at temperature 20-30 degrees C, while a HRT of 12-24 h can be applied at temperature lower than 20 degrees C.  相似文献   

9.
An expanded granular sludge bed (EGSB) reactor was adopted to incubate the sludge biogranule that could simultaneously achieve sulfate reduction and sulfide reoxidization to elemental sulfur for treating molasses distillery wastewater. The EGSB reactor was operated for 175 days at 35 °C with a pH value of 7.0, chemical oxygen demand (COD) loading rate of 4.8 kg COD/(m3 d), and sulfate loading rate of 0.384 kg SO(4)(2-)/(m3 d). The optimal operation parameters, including the oxidation reduction potential (ORP), recycling rate, and hydraulic retention time (HRT), were established to obtain stable and acceptable removal efficiencies of COD, sulfate, and higher elemental sulfur production. With an ORP of -440 mV, a recycling rate of 300%, and HRT of 15 h, the COD and sulfate removal efficiencies were 73.4 and 61.3%, respectively. The elemental sulfur production ratio reached 30.1% when the elemental sulfur concentration in the effluent was 48.1 mg/L. The performance results were also confirmed by the mass balance calculation of sulfate, sulfide, and elemental sulfur over the EGSB reactor.  相似文献   

10.
This paper describes the performance, sludge production and biofilm characteristics of a full scale fluidized bed anaerobic reactor (32 m3) for domestic wastewater treatment. The reactor was operated with 10.5 m x h(-1) upflow velocity, 3.2 h hydraulic retention time, and recirculation ratio of 0.85 and it presented removal efficiencies of 71+/-8% of COD and 77+/-14% of TSS. During the apparent steady-state period, specific sludge production and sludge age in the reactor were (0.116+/-0.033) kgVSS. kgCOD(-1) and (12+/-5)d, respectively. Biofilm formed in the reactor presented two different patterns: one of them at the beginning of the colonization and the other of mature biofilm. These different colonization patterns are due to bed stratification in the reactor, caused by the difference in local-energy dissipation rates along the reactor's height, and density, shape, etc. of the bioparticles. The biofilm population is formed mainly of syntrophic consortia among sulfate reducing bacteria, methanogenic archaea such as Methanobacterium and Methanosaeta-like cells.  相似文献   

11.
This study was conducted to evaluate the treatability of OMW (olive mill wastewater) with sewage and sewage sludge, which could supplement nutrients and microbes required for OMW treatment and reduce its possible toxicity. The amount of OMW added to an aeration tank was based on the loading difference between the designed and actual COD loads, while the amount added to anaerobic digestion for energy recovery was determined by CH4 production. The COD removal efficiencies were 70-85% for both systems. Compost of OMW with dried sewage sludge also showed a similar temperature profile without OMW addition. This strongly suggested that OMW can be treated at a sewage plant without pretreatment and the treated effluent can be reused in irrigation for an arid region.  相似文献   

12.
In recent years a completely autotrophic nitrogen removal process based on Anammox biomass has been tested in a few European countries in order to treat anaerobic supernatant and to increase the COD/N ratio in municipal wastewater. This work reports experimental results on a possible technical solution to upgrade the S. Colombano treatment plant which treats wastewater from the Florentine urban area. The idea is to use 50% of the volume of the anaerobic digester in order to treat external sewage sludge (as septic tank sludge) together with waste activated sludge and to treat the resulting effluent on a SHARON-ANAMMOX process in order to remove nitrogen from the anaerobic supernatant. Anaerobic co-digestion, tested in a 200 L pilot plant, enables low cost treatment of septic tank sludge and increases biogas production; however, it also increases the nitrogen load re-circulated to the WWTP, where nitrogen removal efficiency is already low (<50%), due to the low COD/N ratio, which limits predenitrification efficiency. Experimental results from a SHARON process tested in a lab-scale pilot plant show that nitrite oxidising bacteria are washed-out and steady nitrite production can be achieved at retention times in the range 1 - 1.5 days, at 35 degrees C. In a lab-scale SBR reactor, coupled with a nitration bioreactor, maximum specific nitrogen removal rate under nitrite-limiting conditions (with doubling time equal to about 26 days at 35 degrees C) was equal to 0.22 kgN/kgSSV/d, about 44 times the rate measured in inoculum Anammox sludge. Finally, a cost analysis of the proposed upgrade is reported.  相似文献   

13.
Aerobic biological treatment of digested sludge was studied in a continuously operated laboratory set-up. An aerated reactor was filled with thermophilically digested sludge from the Moscow wastewater treatment plant and inoculated with special activated sludge. It was then operated at the chemostat mode at different flow rates. Processes of nitrification and denitrification, as well as dephosphatation, occurred simultaneously during biological aerobic treatment of thermophilically digested sludge. Under optimal conditions, organic matter degradation was 9.6%, the concentrations of ammonium nitrogen and phosphate decreased by 89 and 83%, respectively, while COD decreased by 12%. Dewaterability of digested sludge improved significantly. The processes were found to depend on hydraulic retention time, oxygen regime, and temperature. The optimal conditions were as follows: hydraulic retention time 3-4 days, temperature 30-35 degrees C, dissolved oxygen levels 0.2-0.5 mg/L at continuous aeration or 0.7-1 mg/L at intermittent aeration. Based on these findings, we propose a new combined technology of wastewater sludge treatment. The technology combines two stages: anaerobic digestion followed by aerobic biological treatment of digested sludge. The proposed technology makes it possible to degrade the sludge with conversion of approximately 45% volatile suspended solids to biogas, to improve nitrogen and phosphorus removal in reject water from sludge treatment units, and to achieve removal of malodorous substances after 8-9 days of anaerobic-aerobic sludge treatment.  相似文献   

14.
对上流式厌氧反应器(UASB)和折流式厌氧反应器(ABR)处理难降解印染废水进行中试研究。结果表明:在厌氧反应器最佳水力停留时间为24 h条件下,UASB和ABR稳定运行2个多月,在进水COD质量浓度波动较大的情况下(ρmax=1 020.0 mg/L,ρmin=593.6 mg/L,ρ均=755.4 mg/L),UASB和ABR出水平均COD质量浓度分别为409.3 mg/L和420.9 mg/L,平均去除率分别为45.5%和43.9%。两种厌氧反应器对色度去除效果较佳,进水平均色度342倍,出水平均色度分别78倍和80倍,平均去除率分别为77.2%和76.6%。印染废水B/C由0.29分别提高到0.46和0.43,废水可生化性明显改善,UASB较ABR效果好。  相似文献   

15.
Anaerobic digestion of concentrated domestic wastewater streams--black or brown water, and solid fraction of kitchen waste is considered as a core technology in a source separation based sanitation concept (DESAR--decentralised sanitation and reuse). A simple anaerobic digester can be implemented for an enhanced primary treatment or, in some situations, as a main treatment. Two reactor configurations were extensively studied; accumulation system (AC) and UASB septic tank at 15, 20 and 25 degrees C. Due to long retention times in an AC reactor, far stabilisation of treated medium can be accomplished with methanisation up to 60%. The AC systems are the most suitable to apply when the volume of waste to be treated is minimal and when a direct reuse of a treated medium in agriculture is possible. Digested effluent contains both liquid and solids. In a UASB septic tank, efficient separation of solids and liquid is accomplished. The total COD removal was above 80% at 25 degrees C. The effluent contains COD and nutrients, mainly in a soluble form. The frequency of excess sludge removal is low and sludge is well stabilised due to a long accumulation time.  相似文献   

16.
The objective of this study was to investigate the performance of the upflow anaerobic sludge blanket (UASB) reactor as the pretreatment system for silk-dyeing wastewater. Two laboratory-scale UASB reactors, with working volume of 15.59 I, were used during May 1998 to June 1999. The actual wastewater was diluted to reduce ammonium ion toxicity on anaerobic bacteria. The experiments were conducted at the organic loading rates (OLRs) of 0.52, 1.01, 1.04, 1.54 and 2.56 kgCOD/(m3 x d), treating only wastewater generated from the acid-dye process of mixed-species raw silk. It took approximately 4 1/2 months to reach the steady-state conditions. It was found that the COD removal was in the ranges of 74.1-85.3%, except at OLR 2.56 kgCOD/(m3 x d) where efficiency significantly dropped to 55.2%. The apparent color removal was in the similar trend as COD. During the study periods, wastewater input had various color shades while the effluent generally looked pale yellowish. The methane generation rates ranged from 0.18-0.31 m3/kg COD removed, with methane composition 81.0-88.1% in biogas. The average granule size in the sludge bed had slowly increased to 0.73 mm in the last experiment. It can be concluded that the UASB reactor is suitable as a pretreatment system for silk-dyeing wastewater. An OLR of 1 kgCOD/(m3 x d) and an influent concentration diluted to 2,600 mgCOD/l are suggested while COD and apparent color removal efficiency of 80% and 70%, respectively, can be expected.  相似文献   

17.
An unusual phenomenon of anaerobic phosphate uptake under alternating anaerobic/aerobic condition was observed in a granular sludge sequencing batch reactor, fed with acetate as sole organic substrate. Anaerobic phosphate uptake efficiencies remained at 50-70% as the influent P/COD was increased from 2/100 to 4/100, and results showed that anaerobic uptake of phosphate was correlated with anaerobic absorption of acetate. Excluding the main possibility of chemical phosphate removal, it appeared that phosphate uptake during the anaerobic phase was associated with organisms enriched in the reactor. Moreover, results indicated that intracellular glycogen was used as the main energy source of organics anaerobic absorption and intracellular polymers storage. Measuring and analysing the variation of phosphate, organic substrate, intracellular glycogen and pH in the anaerobic phase, a preliminary explanation was developed that anaerobic uptake of phosphate was the demand of intracellular glycogen degradation, and extracellular phosphate was transported to intracellular by pH gradient-sensitive phosphate carrier protein.  相似文献   

18.
In this paper, the feasibility of grey water treatment in a UASB reactor was investigated. The batch recirculation experiments showed that a maximum total-COD removal of 79% can be obtained in grey-water treatment in the UASB reactor. The continuous operational results of a UASB reactor treating grey water at different hydraulic retention time (HRT) of 20, 12 and 8 hours at ambient temperature (14-24 degrees C) showed that 31-41% of total COD was removed. These results were significantly higher than that achieved by a septic tank (11-14%), the most common system for grey water pre-treatment, at HRT of 2-3 days. The relatively lower removal of total COD in the UASB reactor was mainly due to a higher amount of colloidal COD in the grey water, as compared to that reported in domestic wastewater. The grey water had a limited amount of nitrogen, which was mainly in particulate form (80-90%). The UASB reactor removed 24-36% and 10-24% of total nitrogen and total phosphorus, respectively, in the grey water, due to particulate nutrients removal by physical entrapment and sedimentation. The sludge characteristics of the UASB reactor showed that the system had stable performance and the recommended HRT for the reactor is 12 hours.  相似文献   

19.
Anaerobic on-site treatment of black water (BW) and a mixture of black water and kitchen waste (BWKW) was studied in a two-phased upflow anaerobic sludge blanket septic tank (UASBst) at 10-20 degrees C. The processes were fed either continuously or discontinuously (twice per weekday). Moreover, BWKW was post-treated for nitrogen removal in an intermittently aerated moving bed biofilm reactor (MBBR) at 20 degrees C. Removal of total chemical oxygen demand (COD1) was efficient at minimum 90% with all three UASBst at all temperatures. Removal of dissolved COD (CODdis) was also high at approx. 70% with continuously fed BW and discontinuously fed BWKW, while with discontinuous BW feeding it was 20%. Temperature decrease had little effect on COD removals, though the need for phase 2 increased with decreasing temperature, especially with BWKW. Post-treatment of BWKW in MBBR resulted in approx. 50% nitrogen removal, but suffered from lack of carbon for denitrification. With carbon addition, removal of ca. 83% was achieved.  相似文献   

20.
Anaerobic biodegradation of estrogens--hard to digest.   总被引:1,自引:0,他引:1  
Although many publications are available on the fate of estrone (E1), 17beta-estradiol (E2) and 17alpha-ethynylestradiol (EE2) during aerobic wastewater treatment, little is published on their fate under strictly anaerobic conditions. Present research investigated the digestibility of E1 and EE2, using digested pig manure, granular UASB sludge, UASB-septic tank sludge and activated sludge as inocula. Besides, actual concentrations were measured in a UASB septic tank treating black water. Under anaerobic conditions E1 is reduced to E2 but the extent of this reduction depends on type of inoculum. No significant loss of the sum of E1 and E2 and of EE2 was observed. Adsorption was responsible for a 32-35% loss of E1 and E2 from the liquid phase in the UASB septic tank and the effluent still contained considerable concentrations of respectively 4.02 microg/l and 18.79 microg/l for E1 and E2 with a large fraction present in conjugated form. No EE2 was detected in the UASB effluent.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号