首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
Workload control (WLC) is a production planning and control concept developed to meet the needs of small- and medium-sized make-to-order companies, where a job shop configuration is common. Although simulation has shown WLC can improve job shop performance, field researchers have encountered significant implementation challenges. One of the most notable challenges is the presence of ‘assembly job shops’ where product structures are more complex than typically modelled in simulation and where the final product consists of several sub-assemblies (or work orders) which have to be co-ordinated. WLC theory has not been developed sufficiently to handle such contexts, and the available literature on assembly job shops is limited. In response, this paper extends the applicability of WLC to assembly job shops by determining the best combination of: (i) WLC due date (DD) setting policy, (ii) release method and (iii) policy for coordinating the progress of work orders. When DDs are predominantly set by the company, the DD setting policy should play the leading role while the role of order release should be limited and the progress of work orders should not be co-ordinated in accordance with the DD of the final product. But when DDs are predominantly specified by customers, the importance of order release as a second workload balancing mechanism increases and work orders should be coordinated by backward scheduling from the DD of the final product. Results indicate that WLC can improve performance in assembly job shops and outperform alternative control policies. Future research should implement these findings in practice.  相似文献   

2.
Workload Control (WLC) seeks to align capacity with demand, where capacity is typically assumed to be restricted by a single constraint – machine capacity. In practice, however, shops are often restricted by dual resource constraints: labour and machines. This study, therefore, uses simulation to investigate the performance of WLC in Dual Resource Constrained (DRC) high-variety shops with fully interchangeable labour. By considering several environmental factors and different labour assignment and dispatching rules, it is demonstrated that the order release function of WLC maintains its positive impact on performance in a DRC shop under different staffing levels. The positive effect of considering labour availability at release, as proposed in previous research, could not, however, be confirmed. Thus, the original release method can be applied if labour is fully interchangeable. In terms of labour assignment, we show that a distinct assignment pattern that differs between upstream and downstream stations improves performance if the routing is directed. Meanwhile, dispatching plays a less important role but creates important interaction effects with the assignment rule. Finally, the results suggest that increasing the service rate is a better response to the reduction in capacity that results from labour absenteeism than lowering the input frequency of work.  相似文献   

3.
Workload control (WLC) has been developed as a production planning and control approach for job shop manufacturing. By balancing loads across work centres, WLC anticipates the fact that multiple work centres may become potential bottlenecks in the short term. This approach is generally tested in job shop models that assume equal utilisation levels for all work centres, which will create maximum bottleneck shiftiness. However, job shop practice clearly shows differences in utilisation levels, which means that some work centres can be seen as non-bottlenecks, having protective capacity. This study investigates the effect of different levels of protective capacity on the performance of state-of-the-art WLC release methods. More in detail, it shows how the level of protective capacity interacts with the influence of workload norms at work centres. Despite the fact that WLC has been developed for highly balanced utilisations, results indicate that WLC could also be effective in unbalanced situations. However, norm setting requires careful attention. Disregarding the norms of non-bottleneck work centres, a common sense approach, might strongly deteriorate performance when the level of protective capacity is not sufficiently high. Contrarily, tighter norms for non-bottleneck work centres are shown to perform better in this situation.  相似文献   

4.
An important scheduling function of manufacturing systems is controlled order release. While there exists a broad literature on order release, reported release procedures typically use simple sequencing rules and greedy heuristics to determine which jobs to select for release. While this is appealing due to its simplicity, its adequateness has recently been questioned. In response, this study uses an integer linear programming model to select orders for release to the shop floor. Using simulation, we show that optimisation has the potential to improve performance compared to ‘classical’ release based on pool sequencing rules. However, in order to also outperform more powerful pool sequencing rules, load balancing and timing must be considered at release. Existing optimisation-based release methods emphasise load balancing in periods when jobs are on time. In line with recent advances in Workload Control theory, we show that a better percentage tardy performance can be achieved by only emphasising load balancing when many jobs are urgent. However, counterintuitively, emphasising urgency in underload periods leads to higher mean tardiness. Compared to previous literature we further highlight that continuous optimisation-based release outperforms periodic optimisation-based release. This has important implications on how optimised-based release should be designed.  相似文献   

5.
Order release is a key component of the Workload Control concept. Jobs do not enter the shop floor directly – they are retained in a pre-shop pool and released in time to meet due dates while keeping work-in-process within limits or norms. There are two important groups of release methods: continuous methods, for which the workload falling to a specified level can trigger a release at any moment in time; and, periodic release methods, for which releases take place at fixed intervals. Continuous release methods in general have been shown to outperform periodic release methods. Yet, there is incongruence in the results presented in the literature on the relative performance of the various continuous release methods. We use a job shop simulation model to examine the performance of continuous release methods from the literature and find that the contradictory results are explained by the different rules applied to sequence jobs in the pool – a factor neglected in previous work. Finally, a new breed of continuous release methods has recently emerged, but these have not been compared with prior approaches. Therefore, we also examine these methods and show that they significantly improve overall performance, although this is to the detriment of jobs with large processing times.  相似文献   

6.
Recent research has highlighted the potential impact of pool sequencing on order release performance but it suffered from two shortcomings. First, arguably the best release solution for workload control in practice combines periodic with continuous release. Although the two types of releases serve different functions, recent work assumed the same sequencing rule should be used for both. Here, the use of different sequencing rules for periodic and continuous releases is evaluated. Using a job-shop simulation, we demonstrate that the rule applied during continuous releases has only a negligible impact on performance. Therefore, jobs can be pulled intermediately from the pool by workers using a more straightforward sequencing rule than the one applied for periodic release. Second, it was assumed that all jobs in the pool are sequenced and then a subset is selected for release. But for some load-oriented sequencing rules, the priority value used for sequencing jobs should be updated after each job selection from the pool. Our simulation results show that although this may improve load balancing at release, it does not in fact improve overall shop performance. Therefore, the greedy heuristic of first sequencing and then selecting jobs can be maintained, which allows the release decision-making process to retain its simplicity. The work has important implications for the use of sequencing rules in practice.  相似文献   

7.
The workload control literature highlights the importance of balancing the shop floor workload, but also acknowledges that this can conflict with processing the most urgent orders – hence, there is a trade-off. In practice, shops contain many complexities, e.g. simultaneous batching and sequence-dependent set-up times that may conflict with processing the most urgent orders and require other solutions than workload balancing to avoid capacity losses. This adds to the trade-off dilemma, which traditionally only considers timing and balancing. This paper develops a framework that determines whether to address a complexity through order release or dispatching. It comprises two dimensions: (i) the typical position of a complexity in the routing of an order and (ii) the criticality of the complexity. A case study is presented, which demonstrates the framework’s utility and illustrates the development of specific solutions designed to handle the complexities. Most complexities present in the case require handling at the order release stage. The challenges of handling multiple complexities at this decision level are evaluated. Finally, the implications for managers and future research are outlined.  相似文献   

8.
Although there is a broad literature on capacity management, there has been only limited attention on how to support short-term capacity control decisions, especially in high-variety make-to-order shops. While finite loading has been identified as a potential means of guiding capacity adjustments, the actual performance impact of this solution has not been adequately assessed. Using a simulation model of a make-to-order job shop, we compare the performance impact of four different forward and backward finite loading methods and a load trigger method recently presented in the literature. Results confirm the potential of finite loading to improve performance when compared to a general capacity increase. Yet all four methods are outperformed by the load trigger method. The capacity adjustments made under finite loading methods are determined by individual jobs and their properties. This may lead to no adjustments despite an overload period (e.g. if a job has a long due date but only one overload station in its routing) or to unnecessary adjustments when there is no overload (e.g. if a large job has a tight due date). This finding draws into question the use of finite loading altogether and reinforces the importance of the load trigger method.  相似文献   

9.
Setting short yet reliable Due Dates (DDs) is an important early production planning and control task. The majority of job-shop research on DD setting assumes simple product structures without assembly operations. However, in practice, product structures are often complex, and multiple final assembly operations may be required. This paper evaluates the performance of DD setting rules in the context of complex product structures, considering two scenarios: two-level assembly job shops, where orders converge on one final assembly operation; and two-level multi-stage job shops, where a series of assembly operations are undertaken. New rules are proposed which are substantially simpler and more suitable for practical use than those in the literature. These rules are only outperformed by a more sophisticated rule from the wider literature, newly introduced into the context of assembly and multi-stage job shops. Which rule to apply in practice depends on whether a manager considers the improvement in performance more important than the loss of simplicity. Future research should investigate how jobs can be planned and controlled effectively when some or all DDs are set externally by customers rather than internally using a DD setting rule.  相似文献   

10.
Simulation has demonstrated that the workload control (WLC) concept can improve performance in job shops, but positive empirical results are scarce. A key reason for this is that the concept has not been developed to handle a number of practical considerations, including sequence-dependent set-up times. This paper investigates the influence of sequence-dependent set-up times on the performance of a workload-controlled job shop. It introduces new set-up-oriented dispatching rules and assesses the performance impact of controlled order release. Simulation results demonstrate that combining an effective WLC order release rule with an appropriate dispatching rule improves performance over use of a dispatching rule in isolation when set-up times are sequence dependent. The findings improve our understanding of how this key implementation challenge can be overcome. Future research should investigate whether the results hold if set-up time parameters are dynamic and set-up times are not evenly distributed across resources.  相似文献   

11.
Kanban systems are simple yet effective means of controlling production. Production control is decentralised or exercised locally on the shop floor, i.e. a downstream station signals to an upstream station that an item is needed. If items are always the same and known, then demands can be satisfied instantaneously from stock; but if items differ and are unknown, demands must first be propagated backwards from station to station before being satisfied. The former is defined as an inventory control problem and the latter as an order control problem. Handling the order control problem via kanban involves a decentralised card acquisition process (during which information is propagated from station to station) that is separated from the actual production process. COBACABANA (control of balance by card-based navigation), an alternative card-based solution, shares kanban’s control structure but centralises the card acquisition process. Evaluating the two systems therefore provides a unique opportunity to compare decentralised and centralised control. Using simulation, we demonstrate that it is specifically the centralised card acquisition process that allows COBACABANA to balance the workload across resources and thus to outperform kanban in an order control problem. This has major implications for research and practice.  相似文献   

12.
An important goal of Production Planning and Control systems is to achieve short and predictable flow times, especially where high flexibility in meeting customer demand is required, while maintaining high output and due-date performance. One approach to this problem is the workload control (WLC) concept. Within WLC research two directions have been developed, largely separately, over time: Rule based and optimisation-based models. If a company intends to introduce an order release concept based on WLC it first has to decide which of these two approaches should be applied. Therefore, this paper compares two of the most widely used and considered best performing periodic order release models out of both streams: the LUMS (rule based) and the clearing function model (optimisation based). The parameters of both approaches are set using simulation optimisation. The performance is compared using a simulation study of a hypothetical job shop in a rolling horizon setting. The results show that the optimisation model outperforms the rule-based mechanism in all instances with stochastic demand (exponential inter-arrival times), but is outperformed in aggregate cost of backorders and inventory holding and balancing measures by the LUMS approach for scenarios with high utilisation and seasonal demand.  相似文献   

13.
A mixed-integer linear programming model is presented for the scheduling of flexible job shops, a production mode characteristic of make-to-order industries. Re-entrant process (multiple visits to the same machine group) and a final assembly stage are simultaneously considered in the model. The formulation uses a continuous time representation and optimises an objective function that is a weighted sum of order earliness, order tardiness and in-process inventory. An algorithm for predictive-reactive scheduling is derived from the proposed model to deal with the arrival of new orders. This is illustrated with a realistic example based on data from the mould making industry. Different reactive scheduling scenarios, ranging from unchanged schedule to full re-scheduling, are optimally generated for order insertion in a predictive schedule. Since choosing the most suitable scenario requires balancing criteria of scheduling efficiency and stability, measures of schedule changes were computed for each re-scheduling solution. The short computational times obtained are promising regarding future application of this approach in the manufacturing environment studied.  相似文献   

14.
Workload Control is a production control concept for high-variety shops built on the principle of input/output control. The literature, however, has argued that input/output control overemphasises throughput improvements to the detriment of the timing of individual orders and, consequently, that it needs to be supplemented by a preceding customer enquiry stage where due dates are set. Yet, although there are broad separate literature streams on due date setting, order release, and output control, there is a lack of research on the three functions together. In response, this study uses simulation to assess the combined performance effect of all three functions. Results show that each control function can be related to a specific performance objective. The degree of emphasis that should be placed on each function, therefore, depends on a company’s specific performance needs. Due date setting and capacity adjustments (output control) are shown to support each other as they address different performance objectives. Meanwhile, order release (input control) is effective in reducing work-in-process and can play a role in making throughput improvements when capacity adjustments are not possible. Findings enhance existing literature on the diagnosis of delivery reliability performance in high-variety shops, with important implications for research and practice.  相似文献   

15.
Workload control concepts are advocated as one of the new production planning and control methods. In its elaborated form, workload control includes three major decision levels: job entry, job release and priority dispatching. In each decision level, several decision points which have significant impact on the effectiveness of the production planning and control are defined (i.e., acceptance/rejection, due date assignment, etc.). Workload control systems should consider all of these decision points simultaneously in order to improve the effectiveness of production planning and control. In addition to these decision levels, flexibility of the shop can also be included as the fourth decision level which allows the shop capacity to be adjusted as new orders enter the system and as they are released to the shop floor. In this study, simulation models which enable the effect of each decision level within a workload control concept to be explored are developed and tested. The results reveal that simultaneous consideration of decision levels is critical and can improve the effectiveness of production planning and control.  相似文献   

16.
Workload control (WLC) is a well-established production control concept for job shops that put primary emphasis on load-based order release. Recent advances in load-based order release research have led to an improved delivery performance at reduced shop floor workloads. But although order release is the primary focus of WLC research, it must be coupled with priority dispatching on the shop floor if order progress is to be regulated. Prior simulation research suggests that load-based order release methods should only be coupled with simple dispatching rules because other, more powerful rules can conflict with the functioning of the release method. Yet, recent empirical research suggests that powerful priority dispatching rules – such as due date-oriented dispatching rules – are in fact needed for a high level of delivery performance to be obtained in practice. This paper focuses on overcoming the conflict between order release and dispatching, so load-based order release can be combined with due date-oriented dispatching. Preliminary analysis reveals that part of the conflict is because existing due date-oriented dispatching rules overcompensate for schedule deviations that occur when orders are either released earlier or later than planned. Two alternative new dispatching rules based on an improved method of determining operation due dates are then developed to better account for schedule deviations and overcome the conflict with load-based order release. Further improvements in delivery performance are obtained, while the large workload reductions achieved by recently developed load-based order release methods are retained.  相似文献   

17.
This paper considers the job shop scheduling problem with alternative operations and machines, called the flexible job shop scheduling problem. As an extension of previous studies, operation and routing flexibilities are considered at the same time in the form of multiple process plans, i.e. each job can be processed through alternative operations, each of which can be processed on alternative machines. The main decisions are: (a) selecting operation/machine pair; and (b) sequencing the jobs assigned to each machine. Since the problem is highly complicated, we suggest a practical priority scheduling approach in which the two decisions are done at the same time using a combination of operation/machine selection and job sequencing rules. The performance measures used are minimising makespan, total flow time, mean tardiness, the number of tardy jobs, and the maximum tardiness. To compare the performances of various rule combinations, simulation experiments were done on the data for hybrid systems with an advanced reconfigurable manufacturing system and a conventional legacy system, and the results are reported.  相似文献   

18.
Capacity flexibility is becoming increasingly important as a means for reducing inventory while maintaining customer service levels. We examine two means to increase capacity flexibility. In particular, we examine an environment where both cross training and flexible workdays are available to respond to workload variability. Flexible workdays are under consideration in the US Legislature. This proposed legislation provides the opportunity for workers to exchange overtime for time off. From a managerial perspective, flexible workdays allow management to shift capacity from periods of light load to periods of heavy load. We simulate the operation of a job shop with both cross training and flexible workdays. Our results indicate that cross training is a far more effective tool for improving performance as compared to flexible workdays. Flexible workdays can be valuable particularly in volatile conditions. However, our results indicate that the degree of cross training is a critical consideration in determining the impact of flexible workdays.  相似文献   

19.
This paper considers the job scheduling problem in which jobs are grouped into job families, but they are processed individually. The decision variable is the sequence of the jobs assigned to each machine. This type of job shop scheduling can be found in various production systems, especially in remanufacturing systems with disassembly, reprocessing and reassembly shops. In other words, the reprocessing shop can be regarded as the job shop with job families since it performs the operations required to bring parts or sub-assemblies disassembled back to like-new condition before reassembling them. To minimise the deviations of the job completion times within each job family, we consider the objective of minimising the total family flow time. Here, the family flow time implies the maximum among the completion times of the jobs within a job family. To describe the problem clearly, a mixed integer programming model is suggested and then, due to the complexity of the problem, two types of heuristics are suggested. They are: (a) priority rule based heuristics; and (b) meta-heuristics. Computational experiments were performed on a number of test instances and the results show that some priority rule based heuristics are better than the existing ones. Also, the meta-heuristics improve the priority rule based heuristics significantly.  相似文献   

20.
Card-based systems are simple, effective means of controlling production. Yet most systems concentrate on controlling the shop floor. They neglect other planning tasks, like estimating short, feasible due dates during customer enquiry management. A card-based version of the workload control concept for job shops – COBACABANA (COntrol of BAlance by CArd-BAsed Navigation) – was proposed in the literature to overcome this shortcoming. COBACABANA uses cards for due date setting and order release, making it a potentially important solution for small shops with limited resources. But many such firms operate as flow shops rather than job shops. Research demonstrated that COBACABANA’s release mechanism must be adapted if applied to a pure flow shop, but its approach to due date setting has not been evaluated in such an environment. We show COBACABANA has the potential to improve pure flow shop performance, but its due date setting procedure should be adapted compared to job shops. In a flow shop, due date estimation can also be further simplified by considering the load awaiting release to the first (gateway) station only while maintaining most performance benefits. The results are important for all card-based systems that aim to stabilise work-in-process, including kanban and ConWIP (Constant Work-in-Process).  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号