 共查询到15条相似文献,搜索用时 0 毫秒
1.
In production planning in the glass container industry, machine-dependent setup times and costs are incurred for switch overs from one product to another. The resulting multi-item capacitated lot-sizing problem has sequence-dependent setup times and costs. We present two novel linear mixed-integer programming formulations for this problem, incorporating all the necessary features of setup carryovers. The compact formulation has polynomially many constraints, whereas the stronger formulation uses an exponential number of constraints that can be separated in polynomial time. We also present a five-step heuristic that is effective both in finding a feasible solution (even for tightly capacitated instances) and in producing good solutions to these problems. We report computational experiments.  相似文献   

2.
A paint manufacturing firm's customers typically place orders for two or more products simultaneously. Each product belongs to a family that denotes batching compatibility during manufacturing. Further, products can be split into several sublots to allow overlapping production in a two-stage hybrid flow shop wherein various identical, capacitated machines operate in parallel at each stage. We present a mixed-integer linear program (MILP) for this integrated batching and lot streaming problem with variable sublots, incompatible job families, and sequence-dependent setup times. The model determines the number and size of sublots for each product and the production sequencing for each sublot such that the total weighted completion time is minimised. To promote practical implementation, we develop and evaluate heuristics to efficiently solve this problem.  相似文献   

3.
Lot streaming is the process of splitting a given lot or job to allow the overlapping of successive operations in flowshops or multi-stage manufacturing systems to reduce manufacturing lead time. Recent literature shows that significant lead time improvement is possible if variable sublots, instead of equal or consistent sublots, are used when production setup time is considered. However, lot streaming problems with variable sublots are difficult to solve to optimality using off-shelf optimisation packages even for problems of small and experimental sizes. Thus, efficient solution procedures are needed for solving such problems for practical applications. In this paper, we develop a mathematical programming model and a hybrid genetic algorithm for solving n-job m-machine lot streaming problems with variable sublots considering setup times. The preliminary computational results are encouraging.  相似文献   

4.
Cheol Min Joo 《工程优选》2013,45(9):1021-1034
This article considers a parallel machine scheduling problem with ready times, due times and sequence-dependent setup times. The objective of this problem is to determine the allocation policy of jobs and the scheduling policy of machines to minimize the weighted sum of setup times, delay times and tardy times. A mathematical model for optimal solution is derived. An in-depth analysis of the model shows that it is very complicated and difficult to obtain optimal solutions as the problem size becomes large. Therefore, two meta-heuristics, genetic algorithm (GA) and a new population-based evolutionary meta-heuristic called self-evolution algorithm (SEA), are proposed. The performances of the meta-heuristic algorithms are evaluated through comparison with optimal solutions using several randomly generated examples.  相似文献   

5.
This paper addresses preemption in just-in-time (JIT) single–machine-scheduling problem with unequal release times and allowable unforced machine idle time as realistic assumptions occur in the manufacturing environments aiming to minimise the total weighted earliness and tardiness costs. Delay in production systems is a vital item to be focussed to counteract lost sale and back order. Thus, JIT concept is targeted including the elements required such as machine preemption, machine idle time and unequal release times. We proposed a new mathematical model and as the problem is proven to be NP-hard, three meta-heuristic approaches namely hybrid particle swarm optimisation (HPSO), genetic algorithm and imperialist competitive algorithm are employed to solve the problem in larger sizes. In HPSO, cloud theory-based simulated annealing is employed with a certain probability to avoid being trapped in a local optimum. Taguchi method is applied to calibrate the parameters of the proposed algorithms. A number of numerical examples are solved to demonstrate the effectiveness of the proposed approach. The performance of the proposed algorithms is evaluated in terms of relative percent deviation and computational time where the computational results clarify better performance of HPSO than other algorithms in quality of solutions and computational time.  相似文献   

6.
This paper focuses on an identical parallel machine scheduling problem with minimising total tardiness of jobs. There are two major issues involved in this scheduling problem; (1) jobs which can be split into multiple sub-jobs for being processed on parallel machines independently and (2) sequence-dependent setup times between the jobs with different part types. We present a novel mathematical model with meta-heuristic approaches to solve the problem. We propose two encoding schemes for meta-heuristic solutions and three decoding methods for obtaining a schedule from the meta-heuristic solutions. Six different simulated annealing algorithms and genetic algorithms, respectively, are developed with six combinations of two encoding schemes and three decoding methods. Computational experiments are performed to find the best combination from those encoding schemes and decoding methods. Our findings show that the suggested algorithm provides not only better solution quality, but also less computation time required than the commercial optimisation solvers.  相似文献   

7.
Wafer sorting is one of the most critical processes involved in semiconductor device fabrication. This study addresses the wafer sorting scheduling problem (WSSP), with minimisation of total setup time as the primary criterion and minimisation of the number of testers used as the secondary criterion. In view of the strongly NP-hard nature of this problem, a simple and effective iterated greedy heuristic is presented. The performance of the proposed heuristic is empirically evaluated by 480 simulation instances based on the characteristics of a real wafer testing shop-floor. The experimental results show that the proposed heuristic is effective and efficient as compared to the state-of-art algorithms developed for the same problem. It is believed that this study has developed an approach that is easy to comprehend and satisfies the practical needs of wafer sorting.  相似文献   

8.
In this paper, a fuzzy bi-objective mixed-integer linear programming (FBOMILP) model is presented. FBOMILP encompasses the minimisation workload imbalance and total tardiness simultaneously as a bi-objective formulation for an unrelated parallel machine scheduling problem. To make the proposed model more practical, sequence-dependent setup times, machine eligibility restrictions and release dates are also considered. Moreover, the inherent uncertainty of processing times, release dates, setup times and due dates are taken into account and modelled by fuzzy numbers. In order to solve the model for small-scale problems, a two-stage fuzzy approach is proposed. Nevertheless, since the problem belongs to the class of NP-hard problems, the proposed model is solved by two meta-heuristic algorithms, namely fuzzy multi-objective particle swarm optimisation (FMOPSO) and fuzzy non-dominated sorting genetic algorithm (FNSGA-II) for solving large-scale instances. Subsequently, through setting up various numerical examples, the performances of the two mentioned algorithms are compared. When α?=?0.5 (α is a level of risk-taking and when it increases the decision-maker’s risk-taking decreases), FNSGA-II is fairly more effective than FMOPSO and has better performance especially in solving large-sized problems. However, when α rises, it can be stated that FMOPSO moderately becomes more appropriate. Finally, directions for future studies are suggested and conclusion remarks are drawn.  相似文献   

9.
The scheduling of parallel machines is a well-known problem in many companies. Nevertheless, not always all the jobs can be manufactured in any machine and the eligibility appears. Based on a real-life problem, we present a model which has m parallel machines with different level of quality from the highest level for the first machine till the lowest level for the last machine. The set of jobs to be scheduled on these m parallel machines are also distributed among these m levels: one job from a level can be manufactured in a machine of the same or higher level but a penalty, depending on the level, appears when a job is manufactured in a machine different from the highest level i.e. different from the first machine. Besides, there are release dates and delivery times associated to each job. The tackled problem is bi-objective with the criteria: minimisation of the final date – i.e. the maximum for all the jobs of their completion time plus the delivery time – and the minimisation of the total penalty generated by the jobs. In a first step, we analyse the sub-problem of minimisation of the final date on a single machine for jobs with release dates and delivery times. Four heuristics and an improvement algorithm are proposed and compared on didactic examples and on a large set of instances. In a second step an algorithm is proposed to approximate the set of efficient solutions and the Pareto front of the bi-objective problem. This algorithm contains two phases: the first is a depth search phase and the second is a backtracking phase. The procedure is illustrated in detail on an instance with 20 jobs and 3 machines. Then extensive numerical experiments are realised on two different sets of instances, with 20, 30 and 50 jobs, 3 or 4 machines and various values of penalties. Except for the case of 50 jobs, the results are compared with the exact Pareto front.  相似文献   

10.
The objective of this paper is to develop intelligent search heuristics to solve n-jobs, m-machines lot streaming problem in a flow shop with equal size sub-lots where the objective is to minimise makespan and total flow time independently. Improved sheep flock heredity algorithm (ISFHA) and artificial bee colony (ABC) algorithms are applied to the problem above mentioned. The performance of these algorithms is evaluated against the algorithms reported in the literature. The computational analysis shows the better performance of ISFHA and ABC algorithms.  相似文献   

11.
We study a single machine scheduling problem (SMSP) with uncertain job release times (JRTs) under the maximum waiting time (MWT) criterion. To deal with the uncertainty, a robust model is established to find an optimal schedule, which minimises the worst-case MWT (W-MWT) when JRTs vary over given time intervals. Although infinite possible scenarios for JRTs exist, we show that only n scenarios are needed for calculating the W-MWT, where n is the number of jobs. Based on this property, the robust (SMSP) with uncertain JRTs to minimise the W-MWT is formulated as a mixed integer linear programming problem. To solve large-size problem instances, an efficient two-stage heuristic (TSH) is proposed. In the first stage, n near-optimal schedules are obtained by solving n deterministic scenario-based SMSPs, and their W-MWTs are evaluated. To speed up the solution and evaluation process, a modified Gusfield’s heuristic is proposed by exploiting the inner connections of these SMSPs. To further improve the schedule obtained in the first stage, the second stage consists of a variable neighbourhood search method by combining both swap neighbourhood search and insert neighbourhood search. We also develop a method to calculate the lower bound of the proposed model so that we can evaluate the performance of the solutions given by the TSH. Experimental results confirm the robustness of schedules produced and advantages of the proposed TSH over other algorithms in terms of solution quality and run time.  相似文献   

12.
In this paper we address the problem of selecting and scheduling several jobs on a single machine with sequence-dependent setup times and strictly enforced time window constraints on the start time of each job. We use short-term production targets to coordinate decentralised local schedulers and to make the objectives of specific areas in line with the chain objectives by maintaining a desired work in process profile in manufacturing environments. The existing literature in this domain is based on discrete-time approaches. We depart from prior approaches by considering continuous time. We introduce a two-step mathematical programming model based on disjunctive constraints to solve small problems to optimality, and propose an insertion-based heuristic to solve large-scale instances. We provide several variations of the insertion heuristic based on different score functions. The primary objective of these approaches is to maximise the total defined score for jobs while satisfying production targets for families of jobs in each shift. Further, our models minimise the maximum completion time of all selected jobs. The effectiveness, efficiency, and robustness of the proposed algorithms are analysed and compared with the existing literature.  相似文献   

13.
The Lagrangian relaxation and cut generation technique is applied to solve sequence-dependent setup time flowshop scheduling problems to minimise the total weighted tardiness. The original problem is decomposed into individual job-level subproblems that can be effectively solved by dynamic programming. Two types of additional constraints for the violation of sequence-dependent setup time constraints are imposed on the decomposed subproblems in order to improve the lower bound. The decomposed subproblem with the additional setup time constraints on any subset of jobs is also effectively solved by a novel dynamic programming. Computational results show that the lower bound derived by the proposed method is much better than those of CPLEX and branch and bound for problem instances with 50 jobs and five stages with less computational effort.  相似文献   

14.
Peng Guo  Wenming Cheng 《工程优选》2013,45(11):1564-1585
This article considers the parallel machine scheduling problem with step-deteriorating jobs and sequence-dependent setup times. The objective is to minimize the total tardiness by determining the allocation and sequence of jobs on identical parallel machines. In this problem, the processing time of each job is a step function dependent upon its starting time. An individual extended time is penalized when the starting time of a job is later than a specific deterioration date. The possibility of deterioration of a job makes the parallel machine scheduling problem more challenging than ordinary ones. A mixed integer programming model for the optimal solution is derived. Due to its NP-hard nature, a hybrid discrete cuckoo search algorithm is proposed to solve this problem. In order to generate a good initial swarm, a modified Biskup–Hermann–Gupta (BHG) heuristic called MBHG is incorporated into the population initialization. Several discrete operators are proposed in the random walk of Lévy flights and the crossover search. Moreover, a local search procedure based on variable neighbourhood descent is integrated into the algorithm as a hybrid strategy in order to improve the quality of elite solutions. Computational experiments are executed on two sets of randomly generated test instances. The results show that the proposed hybrid algorithm can yield better solutions in comparison with the commercial solver CPLEX® with a one hour time limit, the discrete cuckoo search algorithm and the existing variable neighbourhood search algorithm.  相似文献   

15.
This study involves an unrelated parallel machine scheduling problem in which sequence-dependent set-up times, different release dates, machine eligibility and precedence constraints are considered to minimize total late works. A new mixed-integer programming model is presented and two efficient hybrid meta-heuristics, genetic algorithm and ant colony optimization, combined with the acceptance strategy of the simulated annealing algorithm (Metropolis acceptance rule), are proposed to solve this problem. Manifestly, the precedence constraints greatly increase the complexity of the scheduling problem to generate feasible solutions, especially in a parallel machine environment. In this research, a new corrective algorithm is proposed to obtain the feasibility in all stages of the algorithms. The performance of the proposed algorithms is evaluated in numerical examples. The results indicate that the suggested hybrid ant colony optimization statistically outperformed the proposed hybrid genetic algorithm in solving large-size test problems.  相似文献   