首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
This paper deals with the weighted earliness-tardiness resource-constrained project scheduling problem with minimum and maximum time lags (WET-RCPSP/max). The problem consists of scheduling the activities of a project subject to prescribed resource and temporal constraints such that the total weighted deviation of the activities' completion times from prescribed due dates is minimized. Key applications are planning of just-in-time production and reactive scheduling. For the (approximative) solution of the WET-RCPSP/max, we present a population-based iterated-local-search heuristic. We also report the results of an experimental performance analysis where this heuristic outperformed state-of-the-art methods.  相似文献   

2.
This paper presents a heuristic solution procedure for a very general resource–constrained project scheduling problem. Here, multiple execution modes are available for the individual activities of the project. In addition, minimum as well as maximum time lags between different activities may be given. The objective is to determine a mode and a start time for each activity such that the temporal and resource constraints are met and the project duration is minimized. Project scheduling problems of this type occur e.g. in process industries. The heuristic is a multi–pass priority–rule method with backplanning which is based on an integration approach and embedded in random sampling. Its performance is evaluated within an experimental performance analysis for problem instances of real–life size with 100 activities and up to 5 modes per activity.

Received: September 22, 2000 / Accepted: May 18, 2001  相似文献   

3.
本文研究了工期模糊情况下的资源受限项目调度问题,采用一种基于区间数距离的模糊取最大运算比较模糊工期的大小,解决了以往研究中忽略的工期模糊情况下,项目关键路径可能会发生改变,相应地各活动的模糊调度时间以及项目的模糊最短工期也可能随之发生改变的问题。引入一种基于混沌和差分进化的混合粒子群优化算法,并对算法的惯性权重进行改进来求解上述问题。通过一个算例验证了所建立模型及提出方法的有效性。  相似文献   

4.
Project scheduling is a key objective of many models and is the proposed method for project planning and management. Project scheduling problems depend on precedence relationships and resource constraints, in addition to some other limitations for achieving a subset of goals. Project scheduling problems are dependent on many limitations, including limitations of precedence relationships, resource constraints, and some other limitations for achieving a subset of goals. Deterministic project scheduling models consider all information about the scheduling problem such as activity durations and precedence relationships information resources available and required, which are known and stable during the implementation process. The concept of deterministic project scheduling conflicts with real situations, in which in many cases, some data on the activity' s durations of the project and the degree of availability of resources change or may have different modes and strategies during the process of project implementation for dealing with multi-mode conditions surrounded by projects and their activity durations. Scheduling the multi-mode resource-constrained project problem is an optimization problem whose minimum project duration subject to the availability of resources is of particular interest to us. We use the multi-mode resource allocation and scheduling model that takes into account the dynamicity features of all parameters, that is, the scheduling process must be flexible to dynamic environment features. In this paper, we propose five priority heuristic rules for scheduling multi-mode resource-constrained projects under dynamicity features for more realistic situations, in which we apply the proposed heuristic rules (PHR) for scheduling multi-mode resource-constrained projects. Five projects are considered test problems for the PHR. The obtained results rendered by these priority rules for the test problems are compared by the results obtained from 10 well-known heuristics rules rendered for the same test problems. The results in many cases of the proposed priority rules are very promising, where they achieve better scheduling dates in many test case problems and the same results for the others. The proposed model is based on the dynamic features for project topography.  相似文献   

5.
This paper presents a new adaptation of the simulated annealing algorithm for solving non-preemptive resource-constrained project scheduling problems in which resources are limited but renewable from period to period. This algorithm is able to handle single-mode and multi-mode problems and to optimize different objective functions. Statistical experiments show the efficiency of the proposed algorithm even in comparison to some Tabu search heuristics.  相似文献   

6.
For many applications of project scheduling to real-life problems, it is necessary to take into account calendars specifying time intervals during which some resources such as manpower or machines are not available. Whereas the execution of certain activities like packaging may be suspended during breaks, other activities cannot be interrupted due to technical reasons. Minimum and maximum time lags between activities may depend on calendars, too. In this paper, we address the problem of scheduling the activities of a project subject to calendar constraints. We devise efficient algorithms for computing earliest and latest start and completion times of activities. Moreover, we sketch how to use these algorithms for developing priority-rule methods coping with renewable-resource constraints and calendars.

Received: July 26, 2000 / Accepted: May 15, 2001  相似文献   

7.
In this paper, we present a meta-heuristic algorithm for the resource-constrained project scheduling problem with discounted cash flows. We assume fixed payments associated with the execution of project activities and develop a heuristic optimisation procedure to maximise the net present value of a project subject to the precedence and renewable resource constraints. We investigate the use of a bi-directional generation scheme and a recursive forward/backward improvement method from literature and embed them in a meta-heuristic scatter search framework. We generate a large dataset of project instances under a controlled design and report detailed computational results. The solutions and project instances can be downloaded from a website in order to facilitate comparison with future research attempts.  相似文献   

8.
KOLISCH  RAINER  DREXL  ANDREAS 《IIE Transactions》1997,29(11):987-999
This paper addresses a general class of nonpreemptive resource-constrained project scheduling problems in which activity durations are discrete functions of committed renewable and nonrenewable resources. We provide a well known 0-1 problem formulation and stress the importance of the model by giving applications within production and operations management. Furthermore, we prove that the feasibility problem is already NP-complete. Solution procedures proposed so far have the following shortcomings: exact methods can solve only very small instances to optimality; heuristic solution approaches fail to generate feasible solutions when problems become highly resource-constrained. Hence, we propose a new local search method that first tries to find a feasible solution and secondly performs a single-neighborhood search on the set of feasible mode assignments. To evaluate the new procedure we perform a rigorous computational study on two benchmark sets. The experiment includes a comparison of our procedure with other heuristics.  相似文献   

9.
基于Project 2003的关键链启发式算法   总被引:2,自引:0,他引:2  
介绍了关键链项目管理的基本方法;针对资源受限项目调度问题,提出了资源冲突时的资源分配原则;以项目工期最小化为目标,以Proiect 2003为辅助工具,提出了一个确定关键链的启发式算法,即在找出关键路径的基础上,从后往前遍历,对发生资源冲突的活动,依资源分配原则修改紧前关系,然后再确定关键链,进而得到了基于关键链项目管理方法的项目调度算法.对算法进行了验证,结果表明算法是有效的.  相似文献   

10.
NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING   总被引:1,自引:1,他引:0  
This paper addresses methods for formulating and solving a general class of nonpreemptive resource-constrained project scheduling problems in which job durations are discrete functions of committed renewable, nonrenewable and doubly-constrained resources (multi-mode time resource tradeoff). We present a stochastic scheduling method which solves these problems to sub-optimality in an efficient way. Computational results demonstrate that this method is highly superior to other well-known existing deterministic scheduling rules. Extensions to problems in which job-specific (demand) resource profiles are varying with time, in addition to time-varying supply resource profiles, are discussed as well.  相似文献   

11.
The resource-constrained project scheduling problem (RCPSP) has been widely studied during the last few decades. In real-world projects, however, not all information is known in advance and uncertainty is an inevitable part of these projects. The chance-constrained resource-constrained project scheduling problem (CC-RCPSP) has been recently introduced to deal with uncertainty in the RCPSP. In this paper, we propose a branch-and-bound (B&B) algorithm and a mixed integer linear programming (MILP) formulation that solve a sample average approximation of the CC-RCPSP. We introduce two different branching schemes and eight different priority rules for the proposed B&B algorithm. The computational results suggest that the proposed B&B procedure clearly outperforms both a proposed MILP formulation and a branch-and-cut algorithm from the literature.  相似文献   

12.
Project scheduling is a complex process involving many types of resources and activities that require optimisation. The resource-constrained project scheduling problem is one of the well-known problematic issues when project activities have to be scheduled to minimise the project duration. Consequently, several methods have been proposed for adjusting the buffer size but none of these traditional methods consider buffer sizing accuracy based on resource constraints. The purpose of this paper is to develop a buffer sizing method based on a fuzzy resource-constrained project scheduling problem in order to obtain an appropriate proportionality between the activity duration and the buffer size. Specifically, a comprehensive resource-constrained method that considers both the general average resource constraints (GARC) and the highest peak of resource constraints (HPRC) is proposed in order to obtain a new buffer sizing method. This paper contributes to the research by considering several different aspects. First, this paper adopts a fuzzy method to calculate and obtain the threshold amount. Second, this paper discusses the resource levelling problem and proposes the HPRC method. Third, the proposed method uses a fuzzy quantitative model to calculate the resource requirement. The findings indicate that the project achieved higher efficiency, providing effective protection and an appropriate buffer size.  相似文献   

13.
The paper deals with batch scheduling problems in process industries where final products arise from several successive chemical or physical transformations of raw materials using multi–purpose equipment. In batch production mode, the total requirements of intermediate and final products are partitioned into batches. The production start of a batch at a given level requires the availability of all input products. We consider the problem of scheduling the production of given batches such that the makespan is minimized. Constraints like minimum and maximum time lags between successive production levels, sequence–dependent facility setup times, finite intermediate storages, production breaks, and time–varying manpower contribute to the complexity of this problem. We propose a new solution approach using models and methods of resource–constrained project scheduling, which (approximately) solves problems of industrial size within a reasonable amount of time. Received: October 15, 1999 / Accepted: March 21, 2000  相似文献   

14.
For variants of the single-mode resource-constrained project scheduling problem, state-of-the-art exact algorithms combine a Branch and Bound algorithm with principles from Constraint Programming and Boolean Satisfiability Solving. In our paper, we propose new exact approaches extending the above principles to the multi-mode RCPSP (MRCPSP) with generalized precedence relations (GPRs). More precisely, we implemented two constraint handlers cumulativemm and gprecedencemm for the optimization framework SCIP. With the latter, one can model renewable resource constraints and GPRs in the context of multi-mode activities, respectively. Moreover, they integrate domain propagation and explanation generation techniques for the above problem characteristics. We formulate three SCIP-models for the MRCPSP with GPRs, two without and one with our constraint handler gprecedencemm. Our computational results on instances from the literature with 30, 50 and 100 activities show that the addition of this constraint handler significantly strengthens the SCIP-model. Moreover, we outperform the state-of-the-art exact approach on instances with 50 activities when imposing time limits of 27 s. In addition, we close (find the optimal solution and prove its optimality for) 289 open instances and improve the best known makespan for 271 instances from the literature.  相似文献   

15.
Stability and resource allocation in project planning   总被引:2,自引:0,他引:2  
The majority of resource-constrained project scheduling efforts assume perfect information about the scheduling problem to be solved and a static deterministic environment within which the precomputed baseline schedule is executed. In reality, project activities are subject to considerable uncertainty, which generally leads to numerous schedule disruptions. In this paper, we present a resource allocation model that protects a given baseline schedule against activity duration variability. A branch-and-bound algorithm is developed that solves the proposed resource allocation problem. We report on computational results obtained on a set of benchmark problems.  相似文献   

16.
Car manufacturers increasingly offer delivery programs for the factory pick-up of new cars. Such a program consists of a broad range of event-marketing activities. In this paper we investigate the problem of scheduling the delivery program activities of one day such that the sum of the customers waiting times is minimized. We show how to model this problem as a resource-constrained project scheduling problem with nonregular objective function, and we present a relaxation-based beam-search solution heuristic. The relaxations are solved by exploiting a duality relationship between temporal scheduling and min-cost network flow problems. This approach has been developed in cooperation with a German automaker. The performance of the heuristic has been evaluated based on practical and randomly generated test instances. Correspondence to: Christoph MellentienThe authors would like to thank Margit Frank (Porsche AG) and Benjamin Müller (University of Bern) for their valuable contributions to this work.  相似文献   

17.
In many solution methods for resource-constrained project scheduling, it is assumed that both the duration of each activity and its resource requirements are known and fixed. In real-life projects, however, it often occurs that only one renewable bottleneck resource is available and that the activities have a total work content which indicates how much work (expressed in man-periods) has to be performed. The objective then is to schedule each activity in one of its possible execution modes, subject to the precedence and resource constraints, in order to minimize the project makespan. We present a branch-and-bound procedure and report computational results, obtained using a full factorial experiment on a randomly generated problem set.  相似文献   

18.
In this paper, we study a variant of the resource-constrained project scheduling problem in which resources are flexible, i.e., each resource has several skills. Each activity in the project may need several resources for each required skill. We present a mixed-integer linear programming formulation for this problem. Several sets of additional inequalities are also proposed. Due to the fact that some of the above-mentioned inequalities require a valid upper bound to the problem, a heuristic procedure is proposed. Computational experience is reported based on randomly generated data, showing that for instances of reasonable size the proposed model enlarged with the additional inequalities can be solved efficiently.  相似文献   

19.
The problem of this paper deals with the multi-mode project scheduling problem under uncertainty of activity duration where only the renewable resources are taken into account and a given deadline has to be met at the cost of recruiting additional resources. A heuristic algorithm is employed to solve this problem, and to maintain the robustness of the baseline schedule, the concept of critical chain project management (CCPM) is applied in which a new definition to resource buffer is considered. A simulation methodology is used to determine the size and location of resource buffers in the schedules in which three different buffer sizes and three different uncertainty levels are considered. Results and analysis of the simulation outcomes illustrate that resource buffers are useful and should be simulated by the CCPM schedules, as they help to decrease the total duration of the project during implementation and meet the deadline of the project with more assurance.  相似文献   

20.
A survey on the resource-constrained project scheduling problem   总被引:5,自引:0,他引:5  
Linet   zdamar    ndü  z Ulusoy 《IIE Transactions》1995,27(5):574-586
In this paper, research on the resource-constrained project scheduling problem is classified according to specified objectives and constraints. Each classified area is extensively surveyed, and special emphasis is given to trends in recent research. Specific papers involving nonrenewable resource constraints and time/cost-based objectives are discussed in detail because they present models that are close representations of real-world problems. The difficulty of solving such complex models by optimization techniques is noted. For the purposes of this survey, a set of 78 optimally solved test problems from the literature and a second set of 110 benchmark problems have been subjected to analysis with some well-known dispatching rules and a scheduling algorithm that consists of a decision-making process utilizing the problem constraints as a base of selection. The computational results are reported and discussed in the text. Constructive scheduling algorithms that are directly based on the problem constraints and whose performances are independent of problem characteristics are identified as a promising area for future research.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号