首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
Now tools will help managers design organization structures for large engineering and construction projects. An improved understanding of how managers decide in structuring project organizations is necessary to develop these tools and to assist managers in the systematic design of organizations tailored to meet project goals under unique situations. This paper reports a portion of results from research conducted to determine current practices in project organization design. The conclusion that adaptation dominates this process leads to several implications for industry professionals and researchers wishing to improve project performance. Recognizing the role of adaptation in current practices of organizational structuring will allow managers to avoid inertia and systematically design organizations. Researchers can assist by expanding variables in organization theory to better capture project situation and structure and by developing new tools to assist in systematic organization design.  相似文献   

2.
Improvements in construction engineering education result when innovative information technologies are incorporated into academic curricula. Through the use of internet-based communication technologies, no longer must students physically travel to a construction project site to observe and hear construction operations. This paper discusses two applications of internet-based, audio and video technologies currently being piloted at Iowa State University (ISU) and at the University of Calgary (UC) for the purpose of bringing live construction projects into the university classroom. Virtual Project Tours have been piloted at Iowa State University in which real-time video and audio are delivered from active construction projects to a remote classroom through the internet. The second application discussed in this paper, Virtual Supervision, is being piloted at the University of Calgary and consists of the monitoring and analysis of construction projects by using imagery gathered by web-enabled, digital cameras of fixed location transmitting video through the internet. This paper also presents a vision of a globally networked organization of engineering and construction education institutions each sharing the unique engineering and building techniques of their respective part of the globe with design and construction students located around the world. This exchange of construction project observations among the institutions will be enabled by the internet-based applications of virtual project tours and virtual supervision systems described in this paper.  相似文献   

3.
The decentralized nature of the construction industry contributes to difficulties in the implementation and dissemination of project management-based decision tools. The majority of decision support systems (DSS) are contained in-house with private developers and users, or on researchers stand-alone computers and academic journals. Current World Wide Web technologies provide the appropriate means for large-scale implementation and continued development of DSS for the architectural, engineering, and construction community. This paper documents a DSS developed specifically for design∕build project selection among United States public sector agencies. The system, the Design∕Build Selector (DBS), is Web enabled, allowing for easy access and large-scale dissemination. Design∕build project procurement is rapidly expanding throughout public sector agencies in the United States construction industry. As public agencies turn to design∕build, appropriate project selection is a primary consideration affecting successful delivery. Prior to the implementation of DBS, there was no systematic or formalized method for selecting projects appropriate for design∕build. Since 1997, the Web site that houses the DBS has been visited by over 4,000 people, and the DBS tool has been used on 102 projects representing over $4.8 billion in construction. This paper reports on the application and potential for Web-based DSS in civil engineering. The architecture of the program, data collection, model weighting, and output interface are explained.  相似文献   

4.
To reduce errors in projects, knowledge about their causes, through examining their chain of events, and costs should be made available. With this in mind, this paper examines the role of the error recovery process in detecting human-related errors with reference to seven Swedish building construction projects. A total of 2,879 human errors were identified, and those that were found to be the most costly were examined in detail. Industry practitioners’ opinions as to how the identified errors could have been prevented were solicited. It was revealed that the major areas of error reduction lay with improving communication between participants, introducing incentives, improving resourcing levels in projects particularly during design, and the encouragement of individual and organizational learning. The paper concludes by suggesting that the most effective learning takes place in projects when the entire error-recovery process is performed (i.e., detection, indication, and correction) and not parts thereof.  相似文献   

5.
Managing the increased complexity, emerging uncertainties, and diversity of cultures on global projects is creating significant challenges for architecture, engineering, and construction firms. In global projects, differences in “institutions”—including language, beliefs, values, group norms, work practices, professional roles, industry organizations, and legal frameworks—among team members from different national backgrounds can lead to misunderstanding and conflicts that cause delays, increase costs, and reduce quality. Previous research has examined risk factors associated with international project execution. However, little research to date has explored whether reconfiguring project networks might mitigate such risks. Project organizational simulation tools have been combined with “robust design” experimental techniques to design robust project networks that can perform reliably in uncertain conditions. This paper extends project network design research to examine whether robust designs for given project networks differ between “domestic” and “global” projects, given differing organizational uncertainties. The results demonstrate that robust project network designs may differ for global project networks. This finding has significant implications for the design of project networks in an industry where firm participation in global project networks is increasing, both domestically and abroad.  相似文献   

6.
This paper proposes a new buffering approach, reliability and stability buffering, as a means to reduce uncertainty caused by errors and changes, in particular, when concurrent design and construction is applied to an infrastructure project. The proposed buffering provides a proactive mechanism to protect the planned performance of a project with a flexibly located and systemically sized buffer. For its implementation, the reliability and stability buffering is incorporated into a dynamic design and construction project model, which simulates the impacts of errors and changes on design and construction performance and evaluates the effectiveness of the proposed buffers. Applying this buffering approach into the infrastructure project in Massachusetts, this paper concludes that (1) the amount of hidden errors and latent changes was reduced; (2) the flexibly located and distributed buffers helped identify the predecessors’ errors and changes in concurrent design and construction; (3) the impacts of hidden errors and changes were minimized, preventing their ripple effect on the succeeding activities; and (4) the quality of the coordination process was increased. Thus it shows great potential to protect design and construction performance against uncertainty in concurrent design and construction delivery of civil infrastructure projects. Such benefit obtained from the proposed buffering should be relevant to researchers and practitioners because it provides the base for future investigation for the strategic utilization of schedule buffers in an uncertain environment as well as the guideline for their effective use in practice.  相似文献   

7.
The purpose of the paper is to establish the unethical practices in engineering industries and identify the various factors that could encourage unethical practices in the nation’s life with a view to highlighting the findings for corruption-free management of projects. A sample of 226 was randomly selected for the study from a population of 12,230 workers from selected companies in the manufacturing and construction industries in Lagos state. The data were analyzed using simple percentages and the chi-square statistics. The results revealed that organizations have a code of conduct that should generate in the workforce values such as accountability and integrity and that there are disciplinary and control measures to check malpractices, yet individuals still engage in unethical practices. Of all the 34 unethical practices studied, “people want to acquire wealth by all means to enhance public status” ranked highest, followed by “people are driven by their inherent greed for money.” The factor that contributed most to the unethical practices is economic pressures, followed by societal practices, vested interests of stakeholders in contracts, and last organization’s practice. The result also showed that there are vested interests in design, award, execution, and commissioning of projects by stakeholders of the projects and that unethical practices have serious negative impact on project management.  相似文献   

8.
A poor scope definition in an engineering design project disrupts project rhythm, causes rework, increases project time and cost, and lowers the productivity and morale of the workforce. A quantitative measurement of the project scope is the basis for productivity modeling that involves the measurement, estimation, control, and evaluation of productivity. This paper proposes a conceptual model, the quantitative engineering project scope definition (QEPSD), to standardize the measurement of engineering project scope in construction projects, within a computer aided design environment. The QEPSD quantitatively measures engineering project scope, in terms of the complexity of design items by defining design categories and complexity functions appropriate to the particular discipline. The proposed method was originally verified and implemented specifically for steel drafting projects. Actual data was analyzed and used to demonstrate the benefits of historical data prepared using QEPSD for project scope definition. It was found that the new method led to increased utilization of previously untapped values in historical data, improving the accuracy of project scope definition, and productivity modeling. The paper concludes with a discussion of the potential benefits of adopting the QEPSD method, and its implications upon various project management functions.  相似文献   

9.
Ordinarily, minimum design costs are associated with all construction projects regardless of their size or complexity. Consequently, the design costs are a higher percentage of the overall costs for small projects. This paper presents an analysis of the effectiveness of the Small Projects Team Initiative (SPTI) developed and implemented by the Seattle district of the U.S. Army Corps of Engineers. SPTI is intended to lower the design costs on construction projects where the design scope is simple and∕or the administrative and construction processes are somewhat routine. The Small Projects team consists of representatives from contracting, construction, engineering, and project management. This team produces specifications for selected projects with simplified design, design by shop drawing, and innovative contracting arrangements. Data from 77 projects completed within the Seattle district are compared with the data from 146 pre-SPTI jobs. Statistically confirmed benefits include reduced design costs and reduced schedule growth (when user requested changes are excluded). Lower median change-order rates are not confirmed, but further analysis of the nature of changes is recommended.  相似文献   

10.
This paper describes initial research on a project designed to understand the experiences of past generations of constructors and make that knowledge accessible to future generations of engineering students and construction practitioners. Much in the same way as medical students can trace their lineage back to Hippocrates, this project aims to provide architecture, engineering, and construction students, and professionals alike, a sense of their professional history. The project was developed around five time epochs, four geographic regions, and three different project types. We investigated issues such as the flow of money, training of workers, sharing of design knowledge, and nature of contracts and agreements. The central question posed by this work is how should knowledge of the history and evolution of construction practices be incorporated in the dialog that educators have with students and with the larger professional community? This research has led to multifaceted results. On the one hand, the message to students should be pride in their professional heritage because throughout time constructors and designers have used knowledge, perseverance, and innovation to accomplish remarkable projects. On the other hand, we have shown that much of what is considered new in the industry (alternative project delivery methods, worker safety programs, public private partnerships, and globalization) have historical antecedents and are not new at all.  相似文献   

11.
Construction projects are uncertain and complex in nature often because of iterative cycles caused by errors and changes. These errors and changes impair project performance and, consequently, cause schedule and cost overruns to be prevalent. Iterative cycles are more detrimental when design and construction are concurrent and often force activities to proceed without complete information. In an effort to address this issue, this paper presents the information technology aspect of the dynamic planning and control methodology (DPM), which provides a mechanism that will analyze the impact of negative iterative cycles on construction performance. In order to guarantee a smooth application of this method to real-world projects, DPM has been developed by integrating several existing methods around a core system dynamic model for quality and change management and then implementing these methods into a web-based collaborative environment. A case project, applying the developed web-based DPM, shows great potential in facilitating on-site decision making by virtue of its support of data analysis as well as real-time information sharing.  相似文献   

12.
Engineering consulting firms usually collect data such as cost and man-hour expenditures. Although these data help analyze project profit and productivity, they lack the information on the project nature to examine work and analyze the root causes of performance. This study investigates the nature of engineering consulting projects in terms of uncertainty and equivocality (U&E). A questionnaire was designed to collect project U&E data from 108 project managers. The U&E scores were analyzed, further linked to and tested on a consulting firm’s profit, productivity, project type, phase, duration, and owner data. It is found that project nature does not affect profit or productivity; engineering design work needs more data acquisition and analysis than problem definition and interpretation. Other results show insightful patterns about engineering projects that can be useful references to the engineering services industry.  相似文献   

13.
Today’s construction business relies on first-to-market product strategies to gain competitive advantages and increase profit margins. This has created an increased demand for a high performance capital project delivery system that can achieve a dramatic reduction in project cycle time. Very few decision tools and guidelines exist to assist owners in choosing appropriate delivery systems and project strategies to radically reduce the project cycle time from the preplanning stage through start up. The research presented in this paper surveyed the construction owners and architectural/engineering/construction firms to identify projects that have achieved greater than 25% reduction in overall project cycle time when compared to current industry standards. The data collected were analyzed to determine the techniques that facilitate radical reduction in project cycle time. These techniques include, best practices and schedule reduction techniques as well as the various management techniques employed on the projects identified by the Construction Industry Institute (CII). This research also identified the barriers to radical schedule reduction. The research concludes that radical schedule reduction well in excess of 25% can be achieved through the selective employment of management techniques, schedule reduction techniques and CII best practices. Almost every construction manager can utilize this research to improve project performance whether for radical reduction or simply more effective execution.  相似文献   

14.
With China’s fast economic growth and entry into the World Trade Organization (WTO), more foreign architectural, engineering, and construction (AEC) firms are expected to venture into this huge and attractive market. This paper explores the important strategies to help foreign AEC firms clinch construction projects in China. Using a questionnaire survey approach complemented by in-depth interviews, it was found that firms need to pay more attention to the market and working conditions in China and to strengthen their own capabilities. To win projects in China, foreign AEC firms should also be able to offer project financing services. The findings are useful to foreign AEC firms because it may help them win projects in the Chinese construction industry.  相似文献   

15.
Engineering and design activities constitute a critical link in a project’s life cycle. Thus, an efficient project control system requires an instrument to measure and assess engineering performance among different projects. In conventional industry practices, the measurement of engineering performance is usually tied to the production of design documents during the detailed design phase of the project. Realizing the far-reaching impacts of engineering activities, researchers in the past have investigated other comprehensive measures of engineering performance that address the entire project life cycle. As part of a study for the Construction Industry Institute, this particular research employs a multiple attribute utility function method for the collective assessment of engineering performance in construction projects. The paper begins with a summary of previous studies in the area of engineering performance measurement and assessment. Afterwards, the concept of engineering performance is thoroughly explained. The paper then reviews the background and basic theories of using utility functions in assessing engineering performance, along with an illustrative example of the functionality of this approach. The paper goes on to show the development of the utility function model for the industrial construction sector through expert opinion and real project data. The use of the model is further illustrated in the assessment of total and relative engineering performance. Lastly, conclusions of this study are drawn and potential future work is pointed out.  相似文献   

16.
The delivery of civil engineering projects requires civil engineers to address a broad spectrum of issues generated by both project participants and regulatory agencies. Providing tools that assist team members in addressing these issues through the use of information and knowledge from previous projects may reduce project errors by creating informed decision makers. Recent advances in communications and computer technologies provide the opportunity to enhance professional and student access to these resources. The Civil Engineering Resource Library research effort explores this opportunity by combining an introduction to civil engineering processes with emerging web-based technologies for an electronic classroom supplement. The electronic library uses case studies to provide students with illustrations of emerging civil engineering practices and regulatory compliance strategies.  相似文献   

17.
Increased student enrollment and the current poor state of the educational infrastructure require the construction of more school buildings and the renovation of many of the existing ones. The large number and magnitude of change orders in these projects constitute an impediment to the rapid and economic delivery of these projects. A total of 6,585 change orders filed in a school district’s projects in the 5 1/2 year period from 1999 to 2004 were analyzed in five categories including owner-directed changes, code compliance issues, errors/omissions in contract documents, discovered or changed conditions, and others. The results of the study indicate that the dollar value of change orders relative to the original contract can be reduced if preventive measures are taken. These measures include choosing the right construction management firm, emphasizing the definition of project scope early in the project, and effectively managing the precontract activities by conducting value engineering and constructability reviews. The results indicate that school projects can be completed with change orders not exceeding 5% of the contract value if these measures are taken. This study is of relevance to practitioners involved in school design and construction projects.  相似文献   

18.
The Bureau of Engineering is a part of the City of Los Angeles' Department of Public Works and is responsible for the planning, design, and construction management of capital improvement projects for the city. In February 1997, the Bureau of Engineering executive staff and the Board of Public Works mandated a dramatic shift to improve project delivery. All of the non-wastewater elements of the Bureau were organized into a program-based matrix organization with a Project Manager as the focus for project delivery with project conception-to-conclusion responsibility. This paper describes the project management method of project delivery being implemented at the City of Los Angeles Bureau of Engineering and explains the implementation elements and their status. The paper reviews the new project management organizational structure and the organizational options considered by the Bureau. The work details the roles and responsibilities for the project delivery team members. The new tools used to manage projects are described, and the problems and solutions encountered are documented for use on future engineering management efforts.  相似文献   

19.
The use of the Internet, e-mail, and other technologies has been steadily filtering into the building process, creating a concurrent engineering (CE) environment, and enabling collaborative efforts in the building process. The concurrent engineering environment is established by a variety of tools, including internet accessible servers, e-mail, mobile telephones, and many other existing CE tools. Organizations involved in the construction process recognize the need for assessment of benefits resulting from CE tools, but find the evaluation of these benefits difficult and complicated. The project presented in this paper, “project management and organization in the concurrent engineering environment (ProCE),” is applicable to both researchers and practitioners. The ProCE project developed a measuring model, which may be used by future researchers in this area, attempted to measure benefits derived from using the CE environment in construction design and project management routines, and developed guidelines for best practice implementation by practitioners, based on four case studies. The project included the measurement of both the quantitative and qualitative benefit of CE environment implementation in building construction projects using tools that were readily available through application service providers. Measurement of cost and other quantifiable benefits have been extensively studied. Therefore, the majority of the discussion in the current paper will address the ProCE project’s measurement of qualitative benefits.  相似文献   

20.
Construction materials engineering is a long-time discipline of civil engineering which has gained definition and recognition in recent decades due to increased demands placed on the construction materials engineer. This discipline of civil engineering involves the evaluation of construction materials, processes and products. It is a professional practice most often included as part of the project quality assurance. The role of the construction materials engineer in the design phase, the bidding phase, the construction phase and the post-construction phase of projects is examined.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号