首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 0 毫秒
1.
L'æuvre de Byggdok, l'Institut de Documentation du bâtiment de Stockholm, est décrite par son directeur, dans cet article qui porte sur un sujet souvent négligé.  相似文献   

2.
This paper describes a group decision support system (GDSS) developed in response to the need of a computer supported collaborative work environment for implementing the value management (VM) methodology in construction briefing. The GDSS is based on the VM methodology that allows a client to define and represent his or her requirements with functions and functional performance, to bring forward ideas to achieve the functions, and finally to evaluate and highlight the ideas against the functional performance for further development in design. The conceptual framework, design, implementation, use of the GDSS are addressed and described in that order. The system is complementally evaluated through a field study and an experimental study. It is concluded that the GDSS can effectively facilitate the implementation of VM in construction briefing. In addition, the GDSS has big potential to improve the performance of VM studies in terms of the enhanced participation and interaction, the shortened time for tasks, and the improved satisfaction with VM workshops. Research limitations and knowledge contribution of this study are also discussed.  相似文献   

3.
Building regulations have historically been developed and drafted relying on groups of experts and their particular perceptions of what was an acceptable level of risk and what costs can be afforded by the community for improved health, safety or amenity. New technology, particularly in the areas of building design and material sciences, and the development of performance-based standards and codes are demanding major changes to the way in which regulations are developed and how they are assessed to ensure that any changes are in the community's interest. The regulation evaluation system described here provides a computer-based framework on which proposed changes to the Building Code of Australia (BCA) may be systematically assessed. The system requires any proposal to amend the BCA to be clearly identified together with all alternatives which achieve the desired objective. Direct costs and benefits are identified and quantified, making use of internal and external data. Where there is inefficient data, stochastic modelling is employed. The system not only aids decision makers by providing all available information, it also provides a transparency to the decision making and regulation development process.  相似文献   

4.
A wireless structural monitoring system was designed and built to accommodate multiple sensors and provide alerts through a decision support system. In this paper we describe the main features of the system and present the results of its application to a laboratory test. The test was a quarter scale four-span three-pier bridge subjected to gradually increasing earthquake motion with white noise excitations between the strong motions conducted at the University of Nevada, Reno. Autoregressive (AR) models were used to characterise the signals collected from the test and damage was identified through Gaussian mixture models. Damage was quantified using the Mahalanobis distance between undamaged and various damage states of the bridge. The experiment provided a proof of concept for the wireless system and its multitude of features. The analysis of the data demonstrated that the algorithm is capable of identifying the progression of damage and showed good agreement between the measured and observed damage states.  相似文献   

5.
价值管理(Value Management,VM)是降低建设项目成本和改善项目执行效率和质量的一个重要途径,然而,VM在我国建设领域中还存在应用不足、认识不够、相关法律法规不完善以及成效不显著等问题。由于工作计划不同、技术手段差异以及不支持远程协同等因素的影响,针对香港建设领域开发的交互式价值管理系统(IVMS)难以直接应用于内地。为此,本文在IVMS基础上,提出了适用于我国建设领域VM实践的价值管理系统IVMS-CN。IVMS-CN是一个基于网络协同的群体决策支持系统,它由网络通讯平台、协同平台和管理平台等三部分组成,能够为用户提供一个远程协作环境和群体决策支持平台,实现远程参与VM研究,并促进参与者之间的信息交流和共享,减少过程损失,增加信息增益,从而实现VM研究效率与质量的提高。  相似文献   

6.
根据工程实例介绍了大体积V型墩支撑体系施工方案选择和支撑体系的设计,并用ANSYS对支撑体系的屈变进行了计算和分析,从实践结果来看,工程施工过程中选择和使用合适的模板支撑结构体系,能保证工程施工作业的顺利开展,满足施工安全要求而且确保工程质量,从而为企业带来经济效益。  相似文献   

7.
Energy consumption of buildings accounts for around 20-40% of all energy consumed in advanced countries. Over the last decade, more and more global organizations are investing significant resources to create sustainably built environments, emphasizing sustainable building renovation processes to reduce energy consumption and carbon dioxide emissions. This study develops an integrated decision support system to assess existing office building conditions and to recommend an optimal set of sustainable renovation actions, considering trade-offs between renovation cost, improved building quality, and environmental impacts. A hybrid approach that combines A* graph search algorithm with genetic algorithms (GA) is used to analyze all possible renovation actions and their trade-offs to develop the optimal solution. A two-stage system validation is performed to demonstrate the practical application of the hybrid approach: zero-one goal programming (ZOGP) and genetic algorithms are adopted to validate the effectiveness of the algorithm. A real-world renovation project is introduced to validate differences in energy performance projected for the renovation solution suggested by the system. The results reveal that the proposed hybrid system is more computationally effective than either ZOGP or GA alone. The system's suggested renovation actions would provide substantial energy performance improvements to the real project if implemented.  相似文献   

8.
A group decision support system (GDSS) can be helpful to VM users overcome difficulties in value management (VM) workshops. A web-based GDSS known as interactive value management system (IVMS) is introduced in this paper. A comparative experimental study is undertaken to investigate the extent to which the use of IVMS can improve the performance of VM workshops by using a competing value approach (CVA). This study compares and contrasts the performance of a traditional VM workshop with an IVMS-supported VM workshop in three aspects: (1) process measures, (2) outcome measures, and (3) participants’ satisfaction. The process measures indicate that IVMS is helpful in improving the efficiency, information reliability and supportability of decision and participation process, while the outcome measures show groups supported by IVMS perform better in ideas generations. The results also indicate that the use of GDSS results in increasing participant satisfaction.  相似文献   

9.
Simon U  Brüggemann R  Pudenz S 《Water research》2004,38(19):4085-4092
Methods related to partial order theory such as the Hasse diagram technique (HDT) are increasingly used in the field of multi-criteria decision support. The HDT has the advantage of being a transparent evaluation tool, supported by several data analysis tools such as the concept of antagonistic indicators. However, the evaluation usually does not lead to a clear decision, because more than one possible solution is offered. In the example presented here, three of the nine water management strategies (scenarios) evaluated by HDT were identified as winners. However, these strategies were not comparable with each other because of the conflicting evaluation of at least two different indicators. Such antagonisms describe the advantage and disadvantage of each scenario. Based on this background information, a new innovative approach is demonstrated, enabling the stakeholders to design new, modified management strategies, with reduced negative effects. After improvement of the three potential solutions, one clear winner scenario could be identified.  相似文献   

10.
Results from applying the model on a sample of contractors, the majority of whom were international and operating in Egypt, reinforces the credibility of the developed methodology, claim the authors.  相似文献   

11.
杨全付 《山西建筑》2009,35(35):109-110
介绍了新型独立支撑标准化模板体系的施工原理、关键施工技术及安全措施等,指出该体系采用可调节高度的独立支撑,采用矩形钢管作为主次楞,实现装拆的工具化和标准化,分阶段拆除支撑体系,显著提高施工工效,具有良好的社会效益和经济效益。  相似文献   

12.
代洪斌 《山西建筑》2010,36(16):56-57
针对实际工程高空大跨连廊结构支模施工难点,在分析常规钢管脚手架支模体系弊端基础上,初步确定钢桁架支撑系统,为优化设计,详细对比不同截面和形式的钢桁架支撑的优缺点,优选出最终方案,并根据其施工流程,确定其易出现问题的环节以及相应施工技术处理措施,保证了工程质量与安全,综合效益较显著。  相似文献   

13.
This paper presents an overview of a prototypical evaluation system intended for new construction technologies under consideration by the US Army Corps of Engineers. The system has been designed for implementation on MS-DOS driven micro-computers and is capable of determining the level of technology impact on the military construction programme within a given planning horizon. Potential civilian sector applications of this system are also desirable.  相似文献   

14.
李旭东 《四川建材》2020,(2):207-208
高大模板支撑工程是建筑工程的重要构成部分,高大支撑模板坍塌事故成为了困扰工程技术人员的一大问题,严重影响施工安全.通过对影响高大模板支撑工程中的安全因素进行分析.针对国内多发的高大模板施工安全问题,提出了确保高大支撑模板安全的对策,为提高高大模板支撑工程的安全性提供了有意义的指导.  相似文献   

15.
刘武  吕继敏  张兴建 《山西建筑》2010,36(18):146-147
根据项目特征,选用门架、扣件式钢管支架作为支模架支撑系统单元,详细介绍了超高、超重、大跨度混凝土工业X射线探伤室支模架系统的设计与施工,实践证明了该方案的可行性。  相似文献   

16.
《Urban Water Journal》2013,10(3):141-150
Spatial Decision Support Systems (SDSS) represent an attempt to assist in the decision making process by a set of intelligent, knowledge-based techniques and as such have an increasingly important role to play as the data required for spatially sensitive decisions become more available in a wide range of problem areas. The urban environment is a complex, spatially sensitive decision-making environment and as such an ideal case study for the application of these techniques and tools. Building knowledge into a system, particularly through linguistic modelling, is a challenge. This paper briefly discusses the development of such an SDSS based on fuzzy inference and describes techniques enabling the incorporation of both expert judgement and field evidence, where available, in an effort to address one of the main criticisms of linguistic (fuzzy) modelling: that of subjectivity.  相似文献   

17.
赖宇锴 《山西建筑》2010,36(15):111-112
以某工程深基坑支护为例,从基坑支护方案的选择、支护设计、支护施工等方面进行了论述,采取了有效的措施,成功解决了深基坑支护问题,确保了施工质量和安全。  相似文献   

18.
罗迎春  徐蕴星 《山西建筑》2007,33(12):124-125
结合工程概况,介绍了基坑围护结构类型及其设计过程,并对其主要施工步骤进行了阐述,指出施工过程中应注意的问题,最后对基坑的监测进行了论述,以供类似工程参考。  相似文献   

19.
武红 《山西建筑》2014,(22):106-107
在详细分析高大模板工程垮塌事故原因的基础上,介绍了高大模板支撑系统方案的设计编制和论证,总结了施工要点和质量验收标准,指出确保高大模板支撑系统施工安全的关键在于每一位施工管理人员一丝不苟、严格按照相关规范、文件和方案做好设计、施工与验收工作。  相似文献   

20.
顾贞兵 《山西建筑》2011,37(2):92-93
以工程实例为依托,介绍了数字化钢性支撑体系的特点,阐述了其在混凝土结构模板中的应用,并归纳了其施工工艺及特殊部位处理方法,通过新型支撑体系的应用,达到了节约资源、提高工效、保护环境等目的。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号