相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
This paper presents a multiobjective optimization model that provides new and unique capabilities including generating and evaluating optimal/near-optimal construction resource utilization and scheduling plans that simultaneously minimize the time and maximize the profit of construction projects. The computations in the present model are organized in three major modules: (1) a scheduling module that develops practical schedules for construction projects; (2) a profit module that computes the project profit; and (3) a multiobjective module that searches for and identifies optimal/near optimal trade-offs between project time and profit. A large-scale construction project is analyzed to illustrate the use of the model and to demonstrate its capabilities in generating and visualizing optimal trade-offs between construction time and profit.  相似文献   

2.
This paper presents the development of a practical and automated system for optimizing the utilization of construction resources to simultaneously minimize project cost and duration while maximizing project quality. The system is named the Multiobjective Automated Construction Resource Optimization System (MACROS), and it incorporates four newly developed modules: (1) a multiobjective optimization module to quantify and optimize the impact of resource utilization decisions on construction duration, cost, and quality; (2) a relational database module to facilitate the storage and retrieval of construction scheduling and optimization data; (3) a middleware module to provide seamless integration between the internal modules in MACROS and external commercially available project management software; and (4) a user interface module to facilitate the input of project data and the visualization and ranking of the generated optimal construction plans. An example project of 180 activities is analyzed to illustrate the use of MACROS and demonstrate its unique and practical construction optimization capabilities.  相似文献   

3.
Linear repetitive construction projects require large amounts of resources which are used in a sequential manner and therefore effective resource management is very important both in terms of project cost and duration. Existing methodologies such as the critical path method and the repetitive scheduling method optimize the schedule with respect to a single factor, to achieve minimum duration or minimize resource work breaks, respectively. However real life scheduling decisions are more complicated and project managers must make decisions that address the various cost elements in a holistic way. To respond to this need, new methodologies that can be applied through the use of decision support systems should be developed. This paper introduces a multiobjective linear programming model for scheduling linear repetitive projects, which takes into consideration cost elements regarding the project’s duration, the idle time of resources, and the delivery time of the project’s units. The proposed model can be used to generate alternative schedules based on the relative magnitude and importance of the different cost elements. In this sense, it provides managers with the capability to consider alternative schedules besides those defined by minimum duration or maximizing work continuity of resources. The application of the model to a well known example in the literature demonstrates its use in providing explicatory analysis of the results.  相似文献   

4.
The application of network techniques of project scheduling to repetitive projects has been criticized for the inability of network techniques to help maintain work continuity. Moreover, current network techniques require a large number of activities to represent a repetitive project and presume that there is only one logical sequence. This makes schedules time consuming to develop as well as maintain. Further, the logic chosen by the planner might be far from the shortest possible duration. This paper, utilizing the soft logic sequencing principles developed by Fan et al., develops a system which provides an easy input module in addition to scheduling and work-continuity-maintenance modules. The system eases the network generation and update processes, which in turn provides the shortest possible duration logics and the start and finish dates required to maintain work continuity.  相似文献   

5.
A general mathematical formulation is presented for the scheduling of construction projects and is applied to the problem of highway construction scheduling. Repetitive and nonrepetitive tasks, work continuity constraints, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modeled. An optimization formulation is presented for the construction project scheduling problem, with the goal of minimizing the direct construction cost. The nonlinear optimization is then solved by the neural dynamics model developed recently by Adeli and Park. For any given construction duration, the model yields the optimum construction schedule for minimum construction cost automatically. By varying the construction duration, one can solve the cost-duration trade-off problem and obtain the global optimum schedule and the corresponding minimum construction cost. The new construction scheduling model provides the capabilities of both the critical path method (CPM) and linear scheduling method (LSM) approaches. In addition, it provides features desirable for repetitive projects, such as highway construction, and allows schedulers greater flexibility. It is particularly suitable for studying the effects of change order on the construction cost. This research provides the mathematical foundation for development of a new generation of more general, flexible, and accurate construction scheduling systems.  相似文献   

6.
This paper presents the development of an object-oriented model for scheduling of repetitive construction projects such as high-rise buildings, housing projects, highways, pipeline networks, bridges, tunnels, railways, airport runways, and water and sewer mains. The paper provides an overview of the analysis, design, and implementation stages of the developed object-oriented model. These stages are designed to provide an effective model for scheduling repetitive construction projects and to satisfy practical scheduling requirements. The model incorporates newly developed procedures for resource-driven scheduling of repetitive activities, optimization of repetitive construction scheduling, and integration of repetitive and nonrepetitive scheduling techniques. The model is named LSCHEDULER and is implemented as a windows application that supports user-friendly interface including menus, dialogue boxes, and windows. LSCHEDULER can be applied to perform regular scheduling as well as optimized scheduling. In optimized scheduling, the model can assist in identifying an optimum crew utilization option for each repetitive activity in the project that provides a minimum duration or cost for the scheduled repetitive construction project.  相似文献   

7.
A practical model for scheduling and cost optimization of repetitive projects is proposed in this paper. The model objective is to minimize total construction cost comprising direct cost, indirect cost, interruption cost, as well as incentives and liquidated damages. The novelty of this model stems from four main aspects: (1) it is based on full integration of the critical path and the line of balance methodologies, thus considering crew synchronization and work continuity among nonserial activities; (2) it performs time-cost trade-off analysis considering a specified deadline and alternative construction methods with associated time, cost, and crew options; (3) it is developed as a spreadsheet template that is transparent and easy to use; and (4) it utilizes a nontraditional optimization technique, genetic algorithms, to determine the optimum combination of construction methods, number of crews, and interruptions for each repetitive activity. To automate the model, macroprograms were developed to integrate it with commercial scheduling software. Details of the model are presented, and an example project is used to demonstrate its benefits.  相似文献   

8.
Repetitive projects involve the repetition of activities along the stages of the project. Since the resources required to perform these activities move from one stage to the other, a main objective of scheduling these projects is to maintain the continuity of work of these resources so as to minimize the idle time of resources. This requirement, often referred to as work continuity constraints, involves a tradeoff between total project duration and the resource idle time. The contribution of this paper is threefold. First, we provide an extensive literature summary of the topic under study. Although most research papers deal with the scheduling of construction projects, we show that this can be extended to many other environments. Second, we propose an exact search procedure for scheduling repetitive projects with work continuity constraints. This algorithm iteratively shifts repeating activities further in time in order to decrease the resource idle time. We have embedded this recursive search procedure in a horizon-varying algorithm in order to detect the complete tradeoff profile between resource idle time and project duration. The procedure has been coded in Visual C++ and has been validated on a randomly generated problem set. Finally, we illustrate the concepts on three examples. First, the use of our new algorithm is illustrated on a small fictive problem example from literature. In a second example, we show that work continuity constraints involve a tradeoff between total project duration and the resource idle time. A last example describes the scheduling of a well-known real-life project that aims at the construction of a tunnel at the Westerschelde in The Netherlands.  相似文献   

9.
This paper presents a model designed to integrate the planning and scheduling phases of highway construction projects, focusing primarily on the planning aspects. The model automatically generates the work breakdown structure (WBS) and precedence network respecting job logic and stores a list of construction operations typically encountered in highway projects. The generated network can subsequently be modified to suit the unique requirements of the project being considered. An object-oriented model is developed for planning highway construction operations. The model employs resource-driven scheduling in order to suit the repetitive nature of this class of projects. It accounts for (1) resource availability; (2) multiple preceding and succeeding activities; (3) transverse obstructions; (4) activities with varying quantities of work along the highway length; (5) the impact of inclement weather on crew productivity; and (6) the beneficial effect of the learning curve. At the core of the model is a relational database designed to store available resources and their respective unavailability periods. The model enables both: (1) activities executed by own force; and (2) activities subcontracted out. The model is incorporated in a prototype software that operates in the Microsoft Windows environment and generates schedules in both graphical and tabular formats. An example project is analyzed to demonstrate the features of the developed model.  相似文献   

10.
Repetitive scheduling methods are more effective than traditional critical path methods in the planning and scheduling of repetitive construction projects. Nevertheless, almost all the repetitive scheduling methods developed so far have been based on the premise that a repetitive project is comprised of many identical production units. In this research a non-unit-based algorithm for the planning and scheduling of repetitive projects is developed. Instead of repetitive production units, repetitive or similar activity groups are identified and employed for scheduling. The algorithm takes into consideration: (1) the logical relationship of activity groups in a repetitive project; (2) the usage of various resource crews in an activity group; (3) the maintaining of resource continuity; and (4) the time and cost for the routing of resource crews. A sample case study and a case study of a sewer system project are conducted to validate the algorithm, as well as to demonstrate its application. Results and findings are reported.  相似文献   

11.
Buffers have been commonly used as a production strategy to protect construction processes from the negative impact of variability. Construction practitioners and researchers have proposed several buffering approaches for different production situations and contexts. However, these solutions have been impractical for managing buffers. To overcome this, this study proposes a new site methodology for managing work-in-process (WIP) buffer in repetitive projects, on the basis of the reliable commitment model (RCM). RCM is a decision-making tool based on lean principles, which uses statistical models to develop more reliable work plans at the operational level. RCM helps to manage WIP buffer in work plans by using site information and planning reliability indicators that result in improved project performance, such as labor productivity and process progress. A repetitive building project was used as a case study. The main finding was that labor productivity, process progress, and waiting times improved when using larger WIP buffers than those typically used among crews. This shows the potential of RCM as a practical tool to manage WIP buffer sizes and to promote the use of lean production strategies at the operational level.  相似文献   

12.
Optimizing resource utilization can lead to significant reduction in the duration and cost of repetitive construction projects such as highways, high-rise buildings, and housing projects. This can be achieved by identifying an optimum crew size and interruption strategy for each activity in the project. Available dynamic programming formulations can be applied to provide solutions for this optimization problem; however, their application is limited, as they require planners to specify an arbitrary and an unbounded set of interruption options prior to scheduling. Such a requirement is not practical and may render the optimization problem infeasible. To circumvent the limitations of available formulations, this paper presents an automated and practical optimization model. The model utilizes dynamic programming formulation and incorporates a scheduling algorithm and an interruption algorithm so as to automate the generation of interruptions during scheduling. This transforms the consideration of interruption options, in optimizing resource utilization, from an unbounded and impractical problem to a bounded and feasible one. A numerical example from the literature is analyzed to illustrate the use and capabilities of the model.  相似文献   

13.
This paper presents a model, designed to optimize scheduling of linear projects. The model employs a two-state-variable, N-stage, dynamic programming formulation, coupled with a set of heuristic rules. The model is resource-driven, and incorporates both repetitive and nonrepetitive activities in the optimization process to generate practical and near-optimal schedules. The model optimizes either project construction duration, total cost, or their combined impact for what is known as cost-plus-time bidding, also referred to as A+B bidding. The model has a number of interesting and practical features. It supports multiple crews to work simultaneously on any activity, while accounting for: (1) multiple successors and predecessors with specified lead and lag times; (2) the impact of transverse obstructions, such as rivers and creeks, on crew assignments and associated time and cost; (3) the effect of inclement weather and learning curve on crew productivity; and (4) variations in quantities of work in repetitive activities from one unit to another. The model is implemented in a prototype software that operates in Windows? environment. It is developed utilizing object-oriented programming, and provides for automated data entry. Several graphical and tabular output reports can be generated. An example project, drawn from the literature, is analyzed to demonstrate the features of the developed model.  相似文献   

14.
This study attempts to develop a construction scheduling model using a conceptual approach to improve the efficiency of construction resources for a multiple, repetitive construction process (MRCP). It is important for a project manager to arrange the number of horizontal repetitive work areas by each crew group to reduce the work interruption period in MRCP. This study suggests some equations for estimating the optimal number of horizontal repetitive work areas for a crew group and pursued a conceptual model for MRCP, which can reduce the loss in manpower and use of construction equipment that is caused by work interruption periods. A computer program developed for the analysis of MRCP shows an appropriate performance through the application to a case study based on the proposed procedure model in this study. Supposing that there is time to spare in the project completion date, the result of the study shows that cost loss could be greatly reduced by the proposed methodology.  相似文献   

15.
A new scheduling and cost optimization model for high-rise construction is presented in this paper. The model has been formulated with a unique representation of the activities that form the building’s structural core, which need to be dealt with carefully to avoid scheduling errors. In addition, the model has been formulated incorporating: (1) the logical relationships within each floor and among floors of varying sizes; (2) work continuity and crew synchronization; (3) optional estimates and seasonal productivity factors; (4) prespecified deadline, work interruptions, and resource constraints; and (5) a genetic algorithms-based cost optimization that determines the combination of construction methods, number of crews, and work interruptions that meet schedule constraints. A computer prototype was then developed to demonstrate the model’s usefulness on a case study high-rise project. The model is useful to both researchers and practitioners as it better suits the environment of high-rise construction, avoids scheduling errors, optimizes cost, and provides a legible presentation of resource assignments and progress data.  相似文献   

16.
Linear Scheduling Methods are best suited to projects that display repetitive characteristics, but their use in the construction industry is limited. Line‐of‐Balance (LOB) is a Linear Scheduling Method that also makes use of network technology. Its benefits and shortcomings are investigated in a high‐way surface treatment project where LOB has been used experimentally. It was determined that LOB is extremely sensitive to errors in man hour, crew size, and activity duration estimates. There are also problems of a visual nature with the presentation of the diagram. On the other hand, LOB allows a better grasp of the project than any other scheduling technique because it is possible to adjust activities' rates of production. It provides a smooth and efficient flow of resources and requires less time and effort to produce than network schedules. Research to make Linear Scheduling Methods more attractive is recommended.  相似文献   

17.
Many construction planning problems require optimizing multiple and conflicting project objectives such as minimizing construction time and cost while maximizing safety, quality, and sustainability. To enable the optimization of these construction problems, a number of research studies focused on developing multiobjective optimization algorithms (MOAs). The robustness of these algorithms needs further research to ensure an efficient and effective optimization of large-scale real-life construction problems. This paper presents a review of current research efforts in the field of construction multiobjective optimization and two case studies that illustrate methods for enhancing the robustness of MOAs. The first case study utilizes a multiobjective genetic algorithm (MOGA) and an analytical optimization algorithm to optimize the planning of postdisaster temporary housing projects. The second case study utilizes a MOGA and parallel computing to optimize the planning of construction resource utilization in large-scale infrastructure projects. The paper also presents practical recommendations based on the main findings of the analyzed case studies to enhance the robustness of multiobjective optimization in construction engineering and management.  相似文献   

18.
Facility managers face the challenges of managing many different types of small, geographically dispersed construction projects. Depending on the complexity and distribution of projects, the time required to prepare for production consumes a large percentage of the total time required to complete the job. Increasing crews’ productive hours is a key objective when planning multiproject schedules. Existing methods, however, lack the effective means to explicitly model, analyze, and optimize resource utilization for these multiple concurrent projects. As a result, few facility managers fully exploit the potential to better manage their often limited budget and resources. This paper presents an explicit model of the mobilization requirements of multiple crews performing a variety of different activities over a geographic space. The model allows the facility manager to explicitly investigate the impact of crew composition, crew specialization, and depot locations. Using work rule decisions regarding alternative crew allocations, facility managers may dynamically allocate resources to optimize resources and to complete projects in a minimum amount of time. To verify and validate this new model, a computerized system, called FIRS (Facility/Infrastructure Resource Scheduler), was created to analyze the multiproject resource plans with data from two military organizations and a university campus. FIRS utilizes a new genetic algorithm that was developed specifically to work with multiproject scheduling. Using FIRS, facility managers can develop and test alternative crew allocations based on the qualifications of the crews available and the type of operation being performed.  相似文献   

19.
The line-of-balance (LOB) method of scheduling is well suited to projects that are composed of activities of a linear and repetitive nature. The objective of this study is to set down the basic principles that can be used in the development of a computerized LOB scheduling system that overcomes the problems associated with existing systems and creates solutions to problems encountered in the implementation of repetitive-unit construction. The challenges associated with LOB scheduling include developing an algorithm that handles project acceleration efficiently and accurately, recognizing time and space dependencies, calculating LOB quantities, dealing with resource and milestone constraints, incorporating the occasional nonlinear and discrete activities, defining a radically new concept of criticalness, including the effect of the learning curve, developing an optimal strategy to reduce project duration by increasing the rate of production of selected activities, performing cost optimization, and improving the visual presentation of LOB diagrams.  相似文献   

20.
This paper presents an augmented Lagrangian genetic algorithm model for resource scheduling. The algorithm considers scheduling characteristics that were ignored in prior research. Previous resource scheduling formulations have primarily focused on project duration minimization. Furthermore, resource leveling and resource-constrained scheduling have traditionally been solved independently. The model presented here considers all precedence relationships, multiple crew strategies, total project cost minimization, and time-cost trade-off. In the new formulation, resource leveling and resource-constrained scheduling are performed simultaneously. The model presented uses the quadratic penalty function to transform the resource-scheduling problem to an unconstrained one. The algorithm is general and can be applied to a broad class of optimization problems. An illustrative example is presented to demonstrate the performance of the proposed method.  相似文献   