首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 578 毫秒
1.
采用沸石序批式反应器(ZSBR)与缺氧上升流污泥床反应器(A-USB)组合工艺处理氧化铁红高氨氮废水,探究ZSBR稳定亚硝化特性以及组合工艺的脱氮性能。结果表明,通过游离氨(FA)抑制亚硝酸盐氧化菌(NOB),ZSBR可实现稳定高效的完全亚硝化。在进水NH4+-N浓度约为700 mg/L的情况下,ZSBR的出水NH4+-N基本稳定在30 mg/L以下,亚硝化率(NAR)维持在95%以上,平均亚硝酸盐产率(NPR)最高可达0. 68 kg/(m3·d)。提升外回流比能够有效利用A-USB反硝化产生的碱度并减少ZSBR中碳酸氢钠碱度的投加量。以葡萄糖作为外加碳源进行反硝化试验,ZSBR出水经过A-USB反硝化处理后,总氮去除率(NRE)能够较稳定维持在85%以上,最高总氮去除负荷(NRR)可达5. 10 kg/(m3·d)。高通量测序分析表明,ZSBR样品中AOB(Nitrosomonas)的相对丰度达到了50. 93%,未检测出NOB,而具有反硝化功能的副球菌属、丛毛单胞菌属和假单胞菌属的相对丰度总占比可达7. 05%,进一步验证了组合工艺高效且稳定的脱氮性能。  相似文献   

2.
反硝化除磷菌(DPAOs)能够在缺氧条件下同步完成脱氮除磷,是反硝化除磷工艺的主体。以武汉沙湖污水处理厂二沉池的回流污泥为种泥,采用二段式SBR工艺实现了反硝化除磷菌的快速富集。在第一阶段反应器采用厌氧/好氧(A/O)模式运行,可以实现对除磷菌(PAOs)的快速诱导和富集,运行13 d后,SBR反应器对氮、磷的去除率均达到85%以上。而后进入第二阶段,采用厌氧/好氧/缺氧(A/O/A)模式运行,以快速富集培养反硝化除磷菌,经过26 d的运行,反应器对氨氮和磷酸盐的去除率分别达到92.2%和91.2%左右,且典型周期内硝酸盐的消耗量与磷的吸收量基本呈线性关系,表明系统的反硝化除磷能力得到显著增强。  相似文献   

3.
硝化反硝化/生物接触氧化工艺处理合成氨废水   总被引:1,自引:0,他引:1  
采用硝化反硝化/生物接触氧化工艺处理合成氨生产废水,处理规模为2 400 m3/d,进水COD为300~500 mg/L、BOD5为200 mg/L、SS为155 mg/L、NH3-N为200~400 mg/L。运行结果表明,该工艺运行效果稳定,耐冲击负荷能力强,处理出水COD≤40 mg/L、NH3-N≤20 mg/L、SS≤50 mg/L,达到了《合成氨工业水污染物排放标准》(GB 13458—2001)的一级标准,处理成本约为0.864元/m3。  相似文献   

4.
常温下亚硝化活性污泥的驯化及其特征   总被引:1,自引:0,他引:1  
为提高脱氮性能,采用序批式反应器(SBR)培养亚硝化活性污泥.SBR在常温(15~30℃)下运行了110 d,周期为8 h(曝气为5 h、缺氧为3 h),采用间歇式曝气,曝气阶段的溶解氧控制在1.2-1.4 mg/L.结果表明,亚硝化工艺的进水负荷可达0.24 kgNH4+-N/(m3·d),对氨氮的去除率稳定在80%以上,亚硝化率维持在90%以上.同时通过每半个月置换一次污泥上清液,解决了反应器因NO2-累积造成的污泥浓度降低和处理效果不稳定的问题.对亚硝化污泥胞外聚合物(EPS)的分析表明,TB-EPS对污泥沉降性能的贡献明显大于LB-EPS.经驯化后污泥ze-ta电位的电负值降低,表明亚硝化工艺的污泥沉降性能更好.此外,当亚硝化活性污泥驯化成功后反应器能在较高负荷下稳定运行.  相似文献   

5.
低氧条件下膜生物反应器中同步硝化反硝化研究   总被引:1,自引:0,他引:1  
张楠 《浙江建筑》2007,24(11):60-62
研究了膜生物反应器在低氧条件下对生活污水的处理效果。结果表明,在低氧条件下,膜生物反应器中可以实现同步硝化与反硝化。在COD/TN(总氮)为8~10,COD容积负荷为1.68 kg/(m3.d),HRT为5 h,SRT为45 d,DO为0.2~0.3 mg/L,pH为7.0~8.0时,COD的去除率达到96.4%,硝化率达到95.9%,同步硝化反硝化率为47.5%。微环境理论是低氧条件下发生同步硝化反硝化的原因。  相似文献   

6.
通过在SBR反应器中装填吸附型微生物固定化填料和包埋固定化细胞,形成不同形式的序批式固定化微生物反应器,以人工模拟废水为处理对象,较系统地考察了进水氨氮浓度(C/N比)、运行周期及微生物固定化方式等因素对同步硝化反硝化的影响.  相似文献   

7.
水解-硝化反硝化二级SBR工艺处理明胶生产废水   总被引:1,自引:0,他引:1  
采用厌氧水解-硝化反硝化二级SBR工艺处理明胶生产废水.结果表明,在进水COD为1 000~1 400 mg/L、TN为117~147 mg/L的情况下,该工艺降解COD及脱氮效果良好;系统出水COD<100 mg/L,达到了《污水综合排放标准》(GB 8978-1996)的一级标准;水解工艺主要完成对进水中有机氮的氨化作用,硝化反硝化SBR可将水解产生的NH3-N全部转化;系统对TN的去除率>80%,出水TN浓度为10~35 mg/L;污泥中CaCO3的少量积累不会影响系统的处理效果及运行的稳定性.  相似文献   

8.
干法腈纶废水在限氧SBR反应器中的部分亚硝化   总被引:1,自引:0,他引:1  
以经生物流化床处理后的腈纶废水为原水,在限氧SBR反应器中研究了适合ANAMMOX工艺进水的部分亚硝化预处理技术。控制SBR的主要参数如下:DO为0.30~0.40 mg/L、pH值为7.2~7.6、温度为30~35℃、曝气时间为10 h,经过27 d的连续运行,成功实现了部分亚硝化系统的快速启动。同时考察了启动过程中影响亚硝酸盐氮积累的主要因素。结果表明,低DO浓度是实现部分亚硝化的决定性因素;pH值不仅会通过对游离氨浓度的影响而引起氨氧化菌(AOB)活性的变化,其本身也会对AOB活性直接产生一定影响;适当提高系统温度可增强AOB的竞争能力,但当温度35℃时会对AOB活性产生抑制。部分亚硝化系统的最优运行参数如下:DO为0.35 mg/L、pH值为7.6、水温为32℃,在此条件下稳定运行后,平均亚硝化率可达到95%以上,出水COD和TN浓度略有下降。经适用性试验验证,腈纶废水部分亚硝化系统出水完全可以作为ANAMMOX工艺的进水。  相似文献   

9.
采用SBR工艺以水产品加工废水为研究对象,控制进水游离氨(FA)浓度为4.61 mg/L,研究高游离氨条件下短程硝化反硝化过程,对比试验结果表明:1号反应器只控制进水游离氨浓度,在运行70 d以后,转变为全程硝化,说明单一因素控制短程硝化反硝化并不稳定;2号反应器高进水游离氨条件下,控制DO为1~2 mg/L和进水pH为8.4±0.1,亚硝酸盐积累率稳定在92%以上,现已运行130 d以上,短程硝化反硝化运行稳定,表明通过非单一因素控制可实现短程硝化反硝化稳定运行.  相似文献   

10.
为了解决低碳源污水脱氮效果不佳的问题,挖掘多级A/O工艺强化脱氮的潜力,在小试装置中开展了多级A/O工艺同步硝化反硝化的研究.结果表明,随着DO浓度的升高,同步硝化反硝化率呈现下降的趋势,低DO浓度(0.5 mg/L)下的同步硝化反硝化率高达37.4%.在系统中投加填料之后,系统的同步硝化反硝化脱氮能力得到提升.但是随着DO浓度的升高,填料对同步硝化反硝化的影响逐渐减弱.通过试验,提出了多级A/O工艺在较低溶解氧浓度下的梯级曝气运行控制模式,并确定了最佳运行工况,即各好氧区的最佳DO分别为0.5、1.0、1.5 mg/L,在低曝气能耗下实现了对氨氮的去除与较大程度的同步硝化反硝化.  相似文献   

11.
准确的工程项目成本估算是分析工程价值的重要依据,也是实现高质量成本控制的基础。针对成本与其影响因素之间的高度非线性特征以及工程实践中小样本数据的情况,构建了基于ABC-LS-SVM 的成本估算模型。该模型以LS-SVM 算法为核心,采用人工蜂群算法调谐模型核心参数取值。实例表明:与其他估算模型相比,该模型实现了估算精度和建模效率的双重提高。在此基础上,依据成本估算值和测试集误差MAPE 划定成本控制区间,建立成本控制模型,判断项目成本的状态和管理水平,保证项目实现预定的经济目标和社会效益,为实现项目成本的有效控制提供参考。  相似文献   

12.
最小施工单元成本管理方法   总被引:1,自引:0,他引:1  
提出了一种最小施工单元的成本管理方法,它以方块图的形式把项目总成本逐级分解至最小施工单元,通过对最小施工单元成本的管理来控制项目的总成本.为保证项目总成本计划的执行,对单元成本计划的管理要按照分级管理的原则.只要控制好最小施工单元的成本,项目总成本的目标就可以实现.  相似文献   

13.
Bridge engineers seek new materials, configurations and other design elements to minimise rehabilitation frequency and intensity over the facility life and hence, reduce life-cycle cost. This article discusses the potential of stainless steel as a bridge deck reinforcement material. The superiority of stainless steel over traditional steel was evaluated on the basis of long-term agency cost and user cost. Using data from a US Midwestern state, the analysis was carried out for a majority of analysis scenarios. For the deterministic situation, the use of stainless steel as bridge deck reinforcement material was found to yield a significantly higher initial cost but drastically reduced the overall life-cycle costs, and thus is more cost-effective over the long term. For the uncertainty situation, Monte Carlo simulation was used to generate the distributions of the life-cycle cost for the stainless and the traditional steel reinforcement materials. It was found that the life-cycle cost for the stainless steel option stochastically dominates the life-cycle cost for traditional steel. Thus, under an uncertainty situation, the use of stainless steel as bridge deck reinforcement material is also more cost-effective compared to traditional steel.  相似文献   

14.
一九八八年,烟台铁厂应用量本利分析方法,对全年销量和销售收入、企业盈亏平衡点、目标成本额基数来指导仝年工作。首先,用“最小二乘方”法的原理,分解混合成本,求出固定成本和单位变动成本,然后,进行相关程度分析。在证明产量和成本后,进行盈亏分析。通过四个方案的选优,制定出实现目标利润的最佳方案和实施措施,使企业处于完全状态。实践证明,运用量本分析进行经营决策是科学可靠的,是实现目标利润、预测产量控制成本的行之有效的方法。  相似文献   

15.
谢玉梅 《工程建设与设计》2011,(12):135-137,141
对桩基工程进行造价分析,将灰色系统理论应用于柱基工程的造价预测中;结合某桩基工程造价实例,以历史资料为依据建立灰色预测模型,对人工及主要材料价格进行分析预测;并采用小误差概率、标准差比以及相对误差作为预测模型的精度检验指标,评价预测结果的可靠性;最后,将预测结果与实际结果进行对比得出了有益结论;本文思路与方法可为同类工...  相似文献   

16.
为了进一步提高公路建设的投资效益,在分析高速公路沥青路面耐久性和寿命周期关系的基础上,建立了沥青路面全寿命周期费用模型,该模型综合考虑了投资方案的初始修建费、未来的养护维修费、用户费用和寿命期内的其它相关费用。介绍了沥青路面全寿命经济分析的方法,讨论了全寿命经济分析过程中需要重点考虑的两个问题——沥青路面使用性能衰变的预测和维修时机、策略的选择,并对两种不同结构类型的沥青路面进行了实例分析。本文的研究可以为当前新形势下的公路建设项目投资决策和运营管理提供参考。  相似文献   

17.
工程咨询公司参与全过程造价管理是近年来兴起的一种新型管理模式,文章界定建设项目全过程造价咨询服务范围,强调以工程造价咨询机构为主体的建设项目全过程造价管理,分析了全过程造价咨询管理中存在的问题,构建了工程咨询公司从投资决策、设计、招投标、施工,以及工程竣工结算等全过程造价控制模式。  相似文献   

18.
从工程监理的角度出发,对科研试验大楼项目进行施工阶段工程造价动态控制研究。利用赢得值原理分析项目相关数据,得到计划和实际进展的偏差(成本偏差和进度偏差)。通过分析偏差产生的原因,及时制定有效的改进措施。实践表明,工程监理采取的改进措施有效地解决了成本失控和进度拖延的问题。  相似文献   

19.
Public private partnerships (PPP) and private financial initiative (PFI) projects face the challenge of meeting unforeseen future risks. Life cycle cost estimate is a crucial part of PFI/PPP procurement. The traditional deterministic cost model can not take into consideration the uncertainty of future events let alone determine the contingency allowance for the projects. The large number of cost items in the life cycle cost model of building projects makes cost control difficult. Monte Carlo simulation method is applied to the Quantitative Risk Assessment of life cycle costing risk management. A PFI school project was chosen as a case study to demonstrate a new simulation approach to life cycle cost management. The lives and replacement cost rates of building elements are the inputs for the simulation model, while the cumulative life cycle cost are the outputs of the analysis. The sensitivity analysis revealed the cost significant items, which provides the most efficient way for cost control. The results of the analysis identify the high risk life cycle assumptions and provide a variation reference for the decision-makers to define risk and contingency allowance in PFI/PPP projects. The approach can also be applied to other types of building PFI projects.  相似文献   

20.
浅谈工程项目的成本治理   总被引:1,自引:1,他引:0  
胡春媚 《山西建筑》2008,34(18):263-264
分析了目前我国建筑施工企业成本治理的现状,介绍了工程成本控制的方法,对如何正确处理质量、工期与成本的关系作一探讨,提出加强建筑施工企业工程成本治理的对策,从而有效控制成本,达到企业预期目标。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号