首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到6条相似文献,搜索用时 3 毫秒
1.
针对目前未能较好的综合考虑多维修类型与经济生产批量联合优化的问题,首先考虑多类型维修关系,基于时间延迟理论求出故障和缺陷次数的表达式;其次,在此基础上,综合考虑生产费用和维修费用的基础上,构建了多类型维修和经济生产批量联合优化模型,以单位时间内总费用最小为优化目标,获得最优检查间隔期和经济生产批量;最后,通过算例分析验证了模型的有效性,说明了第一类缺陷检查次数的多少对费用和经济生产批量影响不大。  相似文献   

2.
This article develops an integrated model in considering the situations of an imperfect process with imperfect maintenance and inspection time for the joint determination of both economic production quantity (EPQ) and preventive maintenance (PM). This imperfect process has a general deterioration distribution with increasing hazard rate. Even with periodic PM, such a production system cannot be recovered as good as new. This means that the system condition depends on how long it runs. Also, the PM level can be distinct due to the maintenance cost. For convenience, it is assumed the age of system is reduced in proportional to the PM level. Further, during a production cycle, we need an inspection to see if the process is in control. This inspection might demand a considerable amount of time. In this article, we take PM level and inspection time into consideration to optimise EPQ with two types of out-of-control states. To see how the method works, we use a Weibull shock model to show the optimal solutions for the least costs.  相似文献   

3.
This paper addresses the economic lot scheduling problem where multiple items produced on a single facility in a cyclical pattern have shelf life restrictions. A mixed integer non-linear programming model is developed which allows each product to be produced more than once per cycle and backordered. However, production of each item more than one time may result in an infeasible schedule due to the overlapping production times of various items. To eliminate the production time conflicts and to achieve a feasible schedule, the production start time of some or all the items must be adjusted by either advancing or delaying. The objective is to find the optimal production rate, production frequency, cycle time, as well as a feasible manufacturing schedule for the family of items, in addition to minimizing the long-run average cost. Metaheuristic methods such as the genetic algorithm (GA), simulated annealing (SA), particle swarm optimization (PSO), and artificial bee colony (ABC) algorithms are adopted for the optimization procedures. Each of such methods is applied to a set of problem instances taken from literature and the performances are compared against other existing models in the literature. The computational performance and statistical optimization results shows the superiority of the proposed metaheuristic methods with respect to lower total costs compared with other reported procedures in the literature.  相似文献   

4.
In this paper, a PSO-based intelligent integration of design and control is proposed for one kind of nonlinear curing process. This method combines the merits of both fuzzy modeling/control and PSO method, where fuzzy modeling/control is proposed to approximate/control the nonlinear process in a large operating region and the PSO-based intelligent optimization method is developed to solve non-convex and non-differential integration problem with design and control optimized simultaneously. Finally, the proposed method is compared with the traditional sequential method on controlling the temperature profile of a nonlinear curing process.  相似文献   

5.
6.
A multi-product economic production quantity model with several real-world technical and physical constraints is developed in this paper. The cost function includes ordering, holding, backordering, lost sale, and the cost caused by unused space in the warehouse. The goal is to minimize the total inventory cost, where shortages are allowed and partially backordered with fixed and linear costs. The aim is to determine the length of the inventory cycle, the length of positive inventory period, and the backordering rates of the products during the shortage period in order to minimize the total inventory costs while satisfying all constraints. Due to complexity and non-linearity of the proposed model, sequential quadratic programming (SQP), stochastic fractal search (SFS), simulated annealing (SA), and water cycle algorithm (WCA) are utilized for solution. Ninety numerical examples in small, medium, and large sizes are solved to evaluate the efficiency of the solution methods. The performances of the solution methods are compared statistically. Besides, sensitivity analysis is performed to determine the effect of change in the main parameters of the problem on the objective function value and decision variables.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号