首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
A promising system consisting of Up-flow Anaerobic Sludge Blanket (UASB) and Down-Flow Hanging Sponge (DHS) system was investigated for removal of COD, BOD(5) fractions, ammonia and faecal coliform from domestic wastewater. The combined system was operated at different HRTs of 16, 11 and 8 h. The results indicate that increasing the total HRT from 8 to 16 h significantly (p < 0.05) improves the COD(total) and BOD(5 total) removal mainly as a result of a higher removal of COD(soluble), BOD(soluble), COD(particulate) and BOD(particulate). The main part of coarse suspended solids was removed in the UASB reactor (76.4+/-18%) and the remaining portion was adsorbed and/or enmeshed and degraded in the biomass of the DHS system. The combined system achieved a substantial reduction of total suspended solids (TSS) resulting in an average overall percentage removal of 94+/-6% (HRT = 16 h) and 89.5+/-7.8% (HRT = 8 h). Faecal coliform reduction was significantly improved when increasing the total HRT from 8 to 16 h. Residual counts of faecal coliform were 3.1 x 10(3)/100 ml at a total HRT of 16 h, and 2.8 x 10(4)/100 ml at total HRT of 8 h, corresponding to overall removal efficiency of 99.97+/-0.03 and 99.6+/-0.3% respectively. Despite the increase of ammonia concentration as a result of protein hydrolysis in the UASB reactor, a substantial removal of ammonia was achieved in the DHS system. The results obtained show that decreasing the OLR imposed to DHS system from 2.6 to 1.6 kg COD/m(3).d significantly (p < 0.05) improves the removal efficiency of ammonia by a value of 29%. However, the removal efficiency of ammonia is not further increased when decreasing the OLR from 1.6 to 1.3 kg COD/m(3).d. The discharged sludge from UASB + DHS system exerts a good settling property and partially stabilized.DHS profile results have shown that the major part of COD, BOD(5), and TSS was removed in the upper part of the system, consequently, the nitrification process was occurring in the lower part of the DHS system.  相似文献   

2.
The performance of an upflow anaerobic sludge blanket (UASB) reactor and a hybrid UASB-filter reactor was investigated and compared for the treatment of domestic wastewater at different operational temperatures (28, 20, 14 and 10 degrees C) and loading rates. For each temperature studied a constant CODt removal was observed as long as the upflow velocity was lower than 0.35 m/h. At these upflow velocities similar removals were observed for both reactor types at 28 and 20 degrees C, 82 and 72% respectively. However, at 14 and 10 degrees C the UASB reactor showed a better COD removal (70% and 48%, respectively) than the hybrid reactor (60% and 38%). COD removal resulted from biological degradation and solids accumulation in the reactors. At 28 degrees C, a constant 200 g sludge mass was observed in both reactors and COD removal was attributed to biological degradation only. At lower temperatures, solids accumulation was observed in addition to biological degradation with an increase in reactor sludge as the temperature decreased. The decrease in biological degradation at lower temperatures was offset by solids accumulation and explains the similar overall COD removal efficiency observed at 28 degrees C, 20 degrees C and 14 degrees C. The decrease in temperature was also followed by an increase in the effluent TSS concentration in both reactors. At 14 and 10 degrees C a lower effluent TSS concentration and better performance was observed in the UASB reactor.  相似文献   

3.
An up-flow anaerobic sludge blanket (UASB) - down-flow hanging sponge (DHS) was applied to Japanese municipal sewage treatment, and its treatability, energy consumption, and sludge production were evaluated. The designed sewage load was 50 m(3)/d. The sewage typically had a chemical oxygen demand (COD) of 402 mg/L, a suspended solids (SS) content of 167 mg/L, and a temperature of 17-29 °C. The UASB and DHS exhibited theoretical hydraulic retention times of 9.7 and 2.5 h, respectively. The entire system was operated without temperature control. Operation was started with mesophilic anaerobic digested sludge for the UASB and various sponge media for the DHS. Continuous operational data suggest that although the cellulose decomposition and methanogenic process in the UASB are temperature sensitive, stable operation can be obtained by maintaining a satisfactory sludge volume index and sludge concentration. For the DHS, the cube-type medium G3-2 offers superior filling rates, biological preservation and operational execution. The SS derived from the DHS contaminated the effluent but could be removed by optional sand filtration. A comparison with conventional activated sludge (CAS) treatment confirmed that this system is adequate for municipal sewage treatment, with an estimated energy requirement and excess sludge production approximately 75 and 85% less than those of CAS, respectively.  相似文献   

4.
High rate anaerobic technologies offer cost-effective solutions for "sewage" treatment in the temperate climate of Palestine and Jordan. However, local sewage characteristics demand amendments to the conventional UASB reactor design. A solution is found in a parallel operating digester unit that stabilises incoming solids and enriches the UASB sludge bed with methanogenic activity. The digester operational conditions were assessed by operating eight CSTRs fed with primary sludge. The results showed a high degree of sludge stabilization in the parallel digesters at SRTs>or=10 and 15 days at process temperatures of 35 and 25 degrees C, respectively. The technical feasibility of the UASB-digester combination was demonstrated by continuous flow pilot-scale experiments. A pilot UASB reactor was operated for 81 days at 6 hours HRT and 15 degrees C and was fed with raw domestic sewage. This period was subsequently followed by an 83 day operation period incorporating a parallel digester unit, which was operated at 35 degrees C. The UASB-digester combination achieved removal efficiencies of total, suspended, colloidal and dissolved CODs of respectively 66, 87, 44 and 30%. Preliminary model calculations indicated that a total reactor volume of the UASB-digester system corresponding to 8.6 hours HRT might suffice for sewage treatment in Palestine.  相似文献   

5.
In order to reduce the pollution load of the Danube, the North-Budapest Wastewater Treatment Plant has been upgraded to enhanced nitrogen removal by establishing a new activated sludge treatment line and modifying the existing unit for nitrification and denitrification. As both the influent flow rate and the influent chemical oxygen demand (COD), biological oxygen demand (BOD(5)) and total suspended solids (TSS) concentration levels remained far below the design values, setting one fourth of the reactor volume out of operation in the Old Line, and operating the nitrification reactor of the New Line with part-time aeration proved to be possible. Analytical data as well as simulation studies supported the advantage of the intermittent-aeration process in efficient N-removal. However, the lengths of the aerated periods have to be increased with decreasing temperature, and thereby effluent total nitrogen (TN) concentration can increase due to decreasing denitrification efficiency. Potential occurrence of low-dissolved oxygen (DO) bulking should be hindered through applying an efficient anoxic selector system.  相似文献   

6.
The potential of anaerobic digestion in ecological and decentralised sanitation has been investigated in this research. Different anaerobic digestion systems were proposed for the treatment of sewage, grey water, black water and faeces. Moreover, mathematical models based on anaerobic digestion model no.1 (ADM1) were developed for determination of a suitable design for each system. For stable performance of an upflow anaerobic sludge blanket (UASB) reactor treating sewage, the model results indicated that optimisation of wastewater conversion to biogas (not COD removal) should be selected for determination of the hydraulic retention time (HRT) of the reactor. For the treatment of sewage or black water in a UASB septic-tank, the model results showed that the sludge removal period was the main parameter for determination of the HRT. At such HRT, both COD removal and wastewater conversion are also optimised. The model results demonstrated that for treatment of faeces in an accumulation (AC) system at temperature > or = 25 degrees C, the filling period of the system should be higher than 60 days. For maximisation of the net biogas production (i.e. reduction of biogas losses as dissolved in the effluent), the separation between grey water, urine and faeces and reduction of water consumption for faeces flushing are required. Furthermore, the faeces and kitchen organic wastes and grey water are digested in, respectively, an AC system and UASB reactor, while the urine is stored.  相似文献   

7.
The aim of this study was to verify the efficiency of removal of microorganisms in effluents of a Wastewater Treatment Plant (WWTP) comprising an association of a UASB reactor followed by three submerged aerated biofilters (BAF) and one tertiary filter. The WWTP designed to treat domestic wastewater from a population of 1,000 inhabitants showed high removal efficiency for organic matter and suspended solids. Helminth eggs were also efficiently removed from the tertiary effluent and were found in the sludge from the UASB reactor; however, removal of bacteria in this system was very low. To enhance the efficiency of the system, the effluent from tertiary filters was submitted to UV disinfection in a real scale reactor. Our results showed that UV irradiation was very effective at lowering the concentrations of E. coli, thermotolerant coliforms and coliphages to acceptable levels for agricultural reuse. Salmonella spp. and helminth eggs were seeded into the tertiary effluent before passing through the UV reactor. Salmonella was not found in the final effluent, but helminth eggs were not completely inactivated by UV irradiation and viable eggs were detected after 28 d of incubation.  相似文献   

8.
The purpose of this study was to evaluate the influence of partial ozonation of return activated sludge on settling properties and dewaterability of sludge. Sequencing batch reactors with two sets of aerobic and alternating anoxic/aerobic conditions were used. In each set, one reactor served as a control and the other was subject to the ozone treatment (doses in the range of 0.016-0.080 mg O3/mg TSS of initial excess sludge). The level of total suspended solids (TSS) in each reactor was controlled at 1,800 mg/l. To evaluate settleability and dewaterability, settling kinetic studies, sludge volume index (SVI) and capillary suction time test (CST) were used. For extraction and quantifying sludge biopolymers, thermal-ethanolic extraction was employed. The ratio of bound-to-total extracellular polymer substances (EPS) was higher for the strictly aerobic reactor than for the alternating anoxic/aerobic one, indicating the stronger structure of the aerobic flocs. After ozone treatment, the fraction of bound EPS was released and solubilized, increasing soluble EPS. Increased apparent food-to-microorganism (F/M) ratio favoured production of EPS in ozonated reactors, enhancing flocculation, which had potential to improve settling. Dewaterability, measured by CST test, was better in alternating anoxic/aerobic reactors than in aerobic ones, indicating that incorporation of an anoxic zone for biological nutrient removal leads to improvement in sludge dewatering. The negative impact of ozonation on dewaterability was minimal in terms of the long-term operation.  相似文献   

9.
A novel technology suitable for centralised and decentralised wastewater treatment has been developed, extensively tested at laboratory-scale, and trialled at a number of sites for populations ranging from 15 to 400 population equivalents (PE). The two-reactor-tank pumped flow biofilm reactor (PFBR) is characterised by: (i) its simple construction; (ii) its ease of operation and maintenance; (iii) low operating costs; (iv) low sludge production; and (v) comprising no moving parts or compressors, other than hydraulic pumps. By operating the system in a sequencing batch biofilm reactor (SBBR) mode, the following treatment can be achieved: 5-day biochemical oxygen demand (BOD5), chemical oxygen demand (COD) and total suspended solids (TSS) reduction; nitrification and denitrification. During a 100-day full-scale plant study treating municipal wastewater and operating at 165 PE and 200 PE (Experiments 1 and 2, respectively), maximum average removals of 94% BOD5, 86% TSS and 80% ammonium-nitrogen (NH4-N) were achieved. During the latter part of Experiment 2, effluent concentrations averaged: 14 mg BOD5/l; 32 mg COD(filtered)/l; 14 mg TSS/l; 4.4 mg NH4-N/l; and 4.0 mg NO3-N/l (nitrate-nitrogen). The average energy consumption was 0.46-0.63 kWh/m3(treated) or 1.25-1.76 kWh/kg BOD5 removed. No maintenance was required during these experiments. The PFBR technology offers a low energy, minimal maintenance technology for the treatment of municipal wastewater.  相似文献   

10.
The treatment of grey water in two upflow anaerobic sludge blanket (UASB) reactors, operated at different hydraulic retention times (HRTs) and temperatures, was investigated. The first reactor (UASB-A) was operated at ambient temperature (14-25 degrees C) and HRT of 20, 12 and 8 h, while the second reactor (UASB-30) was operated at controlled temperature of 30 degrees C and HRT of 16, 10 and 6 h. The two reactors were fed with grey water from 'Flintenbreite' settlement in Luebeck, Germany. When the grey water was treated in the UASB reactor at 30 degrees C, total chemical oxygen demand (CODt) removal of 52-64% was achieved at HRT between 6 and 16 h, while at lower temperature lower removal (31-41%) was obtained at HRT between 8 and 20 h. Total nitrogen and phosphorous removal in the UASB reactors were limited (22-36 and 10-24%, respectively) at all operational conditions. The results showed that at increasing temperature or decreasing HRT of the reactors, maximum specific methanogenic activity of the sludge in the reactors improved. As the UASB reactor showed a significantly higher COD removal (31-64%) than the septic tank (11-14%) even at low temperature, it is recommended to use UASB reactor instead of septic tank (the most common system) for grey water pre-treatment. Based on the achieved results and due to high peak flow factor, a HRT between 8 and 12 h can be considered the suitable HRT for the UASB reactor treating grey water at temperature 20-30 degrees C, while a HRT of 12-24 h can be applied at temperature lower than 20 degrees C.  相似文献   

11.
In this paper, the feasibility of grey water treatment in a UASB reactor was investigated. The batch recirculation experiments showed that a maximum total-COD removal of 79% can be obtained in grey-water treatment in the UASB reactor. The continuous operational results of a UASB reactor treating grey water at different hydraulic retention time (HRT) of 20, 12 and 8 hours at ambient temperature (14-24 degrees C) showed that 31-41% of total COD was removed. These results were significantly higher than that achieved by a septic tank (11-14%), the most common system for grey water pre-treatment, at HRT of 2-3 days. The relatively lower removal of total COD in the UASB reactor was mainly due to a higher amount of colloidal COD in the grey water, as compared to that reported in domestic wastewater. The grey water had a limited amount of nitrogen, which was mainly in particulate form (80-90%). The UASB reactor removed 24-36% and 10-24% of total nitrogen and total phosphorus, respectively, in the grey water, due to particulate nutrients removal by physical entrapment and sedimentation. The sludge characteristics of the UASB reactor showed that the system had stable performance and the recommended HRT for the reactor is 12 hours.  相似文献   

12.
Anaerobic digestion of concentrated domestic wastewater streams--black or brown water, and solid fraction of kitchen waste is considered as a core technology in a source separation based sanitation concept (DESAR--decentralised sanitation and reuse). A simple anaerobic digester can be implemented for an enhanced primary treatment or, in some situations, as a main treatment. Two reactor configurations were extensively studied; accumulation system (AC) and UASB septic tank at 15, 20 and 25 degrees C. Due to long retention times in an AC reactor, far stabilisation of treated medium can be accomplished with methanisation up to 60%. The AC systems are the most suitable to apply when the volume of waste to be treated is minimal and when a direct reuse of a treated medium in agriculture is possible. Digested effluent contains both liquid and solids. In a UASB septic tank, efficient separation of solids and liquid is accomplished. The total COD removal was above 80% at 25 degrees C. The effluent contains COD and nutrients, mainly in a soluble form. The frequency of excess sludge removal is low and sludge is well stabilised due to a long accumulation time.  相似文献   

13.
The post-treatment of domestic sewage pretreated in a 6 m3 UASB was investigated in two high-rate anaerobic filter (AF) reactors operated in parallel. The difference between the two AF reactors was only the addition of cationic polymer to the second reactor (AF + P). The reactors were operated at low temperatures, ranged between 13 and 20 degrees C. The media in each AF reactor consisted of vertical sheets of reticulated-polyurethane foam (RPF) with knobs. The results demonstrated that the AF + P reactor (HRT = 3 h) with cationic polymer addition (2 mg/L) was an efficient system for post-treatment. The removal efficiencies for total, suspended, colloidal and dissolved COD were, respectively, 41, 86 and 76 and 12% in the AF + P reactor and they were, respectively, 80, 97, 77 and 66% in the UASB + (AF + P) system. The removal of total, suspended and colloidal COD in the UASB + (AF + P) system were significantly higher than those achieved in the UASB + AF system. As hardly any nutrient was removed in the UASB + (AF + P) system, the effluent after pathogen removal is a valuable product for irrigation and fertilisation to close the water and nutrients cycle.  相似文献   

14.
Micropollutants as pharmaceutical active compounds (PhACs), residuals of personal care products or endocrine disrupting chemicals are of increasing interest in water pollution control. In this context the removal efficiencies of sewage treatment plants (STPs) are of importance, as their effluents are important point sources for the release of those substances into the aquatic environment. Activated sludge based wastewater treatment is the worldwide prevalently used treatment technique. In conventional plants the separation of treated wastewater and sludge occurs via sedimentation. A new development is the application of membrane technology for this separation step. The studies focus on the influence of the solids retention time (SRT) on the removal efficiency, as the SRT is the most important parameter in the design of STPs. A conventional activated sludge plant (CASP) and a membrane bioreactor (MBR) were operated at different SRTs. The substances selected are the antiepileptic carbamazepine, the analgesics diclofenac and ibuprofen, the lipid regulator bezafibrate, the polycyclic musks tonalide and galaxolide and the contraceptive 17alpha-ethinylestradiole. No significant differences in the removal efficiency were detected. Due to the absence of suspended solids in the MBR effluent, substances with high adsorption potential could be retained to slightly higher amounts.  相似文献   

15.
This research integrates two different concepts of anaerobic biotechnology- two-phase anaerobic treatment and anaerobic granular sludge bed technology, in treatment of colored wastewaters from textile industries. Four anaerobic reactors based on upflow anaerobic sludge blanket (UASB) technology were used as acid reactors and an expanded granular sludge bed (EGSB) reactor was used as a methane reactor. A conventional single-phase anaerobic reactor, working on EGSB technology was run in parallel to compare the performances of the two systems. Reactors were operated at different hydraulic retention times. The results from the study, which span over a period of 400 days, indicated that the two-phase system produces a higher quality of effluent in terms of color, COD and suspended solids than single-phase anaerobic treatment when operated under similar conditions. Alkalinity requirement of two-phase system was also observed to be lower than that of single-phase system which is important regarding design consideration.  相似文献   

16.
This paper presents an evaluation of the process performance of a pilot-scale "fourth generation" downflow hanging sponge (DHS) post-treatment system combined with a UASB pretreatment unit treating municipal wastewater. After the successful operation of the second- and third-generation DHS reactors, the fourth-generation DHS reactor was developed to overcome a few shortcomings of its predecessors. This reactor was designed to further enhance the treatment efficiency and simplify the construction process in real scale, especially for the application in developing countries. Configuration of the reactor was modified to enhance the dissolution of air into the wastewater and to avert the possible clogging of the reactor especially during sudden washout from the UASB reactor. The whole system was operated at a total hydraulic retention time (HRT) of 8 h (UASB: 6 h and DHS: 2 h) for a period of over 600 days. The combined system was able to remove 96% of unfiltered BOD with only 9 mg/L remaining in the final effluent. Likewise, F. coli were removed by 3.45 log with the final count of 10(3) to 10(4) MPN/100 ml. Nutrient removal by the system was also satisfactory.  相似文献   

17.
Two-stage membrane bioreactor (MBR) system was applied to the treatment of landfill leachate from a solid waste disposal site in Thailand. The first stage anoxic reactor was equipped with an inclined tube module for sludge separation. It was followed by an aerobic stage with a hollow fiber membrane module for solid liquid separation. Mixed liquor sludge from the aerobic reactor was re-circulated back to anoxic reactor in order to maintain constant mixed liquor suspended solids (MLSS) concentration in the aerobic reactor. The removal of micro-pollutants from landfill leachate along the treatment period of 300 days was monitored. The results indicated that two-stage MBRs could remove biochemical oxygen demand (BOD), chemical oxygen demand (COD) and NH(4)(+) by 97, 87 and 91% at steady operating condition. Meanwhile organic micro-pollutant removals were 50-76%. The removal efficiencies varied according to the hydrophobic characteristic of compounds but they were improved during long-term MBR operation without sludge discharge.  相似文献   

18.
In this study, treatment of slaughterhouse wastewater by electrocoagulation was investigated in batch system using Fe electrodes. The effect of various variables such as electrode number, current density and operating time was tested. Pollutant removal efficiency increased with increasing electrode number and operating time. The biochemical oxygen demand (BOD(5))(,) chemical oxygen demand (COD), total suspended solid (TSS), and total nitrogen (TN) removal efficiencies using eight electrodes at a contact time of 50 min and a current density of 10 A/m(2) were 66, 62, 60, and 56%, respectively. Higher electrode numbers will allow shorter operating times to achieve certain removal efficiencies. Also, removal efficiencies increased by increasing the current density; the highest removal efficiencies of BOD(5,) COD, TSS, and TN at a contact time of 50 min and a current density of 25 A/m(2) were 97, 93, 81, and 84%, respectively. The results also show that the reactor pH varies directly with the current density; at 25 A/m(2), the reactor pH increased from an initial value of 7.1 to 7.7 after 50 min. The experimental results showed that the kinetics of BOD(5), COD, TSS and TN removal could be fitted adequately using a first order kinetic model (higher R(2)).  相似文献   

19.
This paper presents the behaviour of a full-scale expanded bed reactor (160 m3) with overlaid anaerobic and aerobic zones used for municipal wastewater treatment. The research was carried out in two experimental steps: anaerobic and anaerobic-aerobic conditions, and the experimental results presented in this paper refer to four months of reactor operation. In the anaerobic condition, after inoculation and 60 days of operation, the reactor treating 3.40 kg CODm(-3)d(-1) for thetaH of 2.69 h, reached mean removal efficiencies of 76% for BOD, 72% for COD, and 80% for TSS, when the effluent presented mean values of 225 mg.L(-1) of COD, 98 mg.L(-1) of BOD and 35 mg.L(-1) of TSS. Under these conditions, for nitrogen loading of 0.27 kgN.m(-3)d(-1), the reactor generated an effluent with mean N-org. of 8 mg.L(-1) and N-ammon. of 37 mg.L(-1), demonstrating high potential of ammonification. For the anaerobic-aerobic condition (118th day) the system was operated with thetaH of 5.38 h presented mean removal efficiencies of 84% for BOD, 79% for COD, 76% for TSS, and 30% for TKN. The reactor's operation time was less than two months, which was not long enough to reach nitrification. Regarding the obtained results, this research confirmed that this reactor is configured as a flexible and adequate alternative for the treatment of sewage, requiring relatively small area and only thetaH of 10 h that can be adjusted to the local circumstances.  相似文献   

20.
Factors affecting cultivation of extremely slow-growing bacteria (anaerobic ammonium oxidiser, doubling time 11 days) were investigated by using upflow anaerobic sludge blanket (UASB) reactors which can maintain high solid retention time. The effects of concentrations of DO, free ammonia (FA), and nitrite on activation of anammox activity were tested during the start-up period. The reactor was inoculated with granular sludge collected from a full-scale UASB reactor used for treating brewery wastewater, and sludge from a piggery wastewater treatment plant and rotating biological contactor treating sewage. Results of continuous operation showed that concentrations of DO, free ammonia (FA) and nitrite in the reactors played a key role in stimulating the anammox activity during start-up period. It is crucial to keep DO below 0.2 ppm, FA below 2 mg/L and nitrite nitrogen below 35 mg/L to cultivate anammox cells in the continuous bioreactor. When the levels of DO, FA and nitrite in the influent were controlled at less than the inhibition levels, the anammox activity increased gradually in the anaerobic condition. Addition of hydrogen sulphide into the reactor enhanced anammox activity in the continuous culture. Through the SEM, TEM and FISH analysis, anammox bacteria were detected in the granular sludge after 3 months of continuous operation.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏