立试水轮发电机组安装过程中,镜板的安装质量是多种因素决定的,镜板的水平度和高程的调整质量,直接影响着机组的安装和运行。文章介绍了镜板的调整措施,保证水轮发电机组的安装质量和机组运行的稳定性。 相似文献
2.
水轮发电机组启动试运行前的检查和机组启动后的动态试验主要是检验机组的设计、设备和安装质量是否符合国家制定的设计规范、设备制造技术标准、设备安装标准。通过水轮发电机组的动态试验,使水轮发电机组的运行安全可靠。 相似文献
3.
立轴混流式水轮发电机组安装的目标是保证机组在额定工况下转轮中心线与导水机构中心线平齐,转子磁力中心线较定子磁力中心线略低0~3 mm,机组中心线、机组轴线、机组旋转中心线无限逼近,三部轴承摆度、瓦温、固定部件振幅等在一定范围内。为实现上述目标,在设计、制造既定的情况下,制定并实施合适的水轮发电机组安装工艺方案,显得尤为重要。本文结合某水电站机电安装情况,从机电安装工艺、工序优化入手,详细介绍了水轮发电机组重要部件安装高程核算、控制,工期优化等方面的内容。对于类似水轮发电机组机电安装工艺的制定、实施、优化,机电安装项目工期优化,降低工作强度等方面有着重要的参考价值。 相似文献
4.
推力轴承是水轮发电机组核心装配部件之一,安装质量好坏直接影响到机组的安全、稳定运行。如何保证大型水轮发电机组推力轴承安装质量,是值得思考的问题。本文简述了锦屏一级水电站推力轴承安装工艺及调整方法。 相似文献
5.
6.
作为水轮发电机组的核心部件,转子安装向来以精度要求高、质量控制严著称,是水电站机电安装的质量控制重点。河南宝泉抽水蓄能电站的转子具有转速高、整体高度高、结构特殊、公差配合小、叠片难度大、圆度测量控制难、组装程序复杂、安装工艺新、施工难点多且工期紧和任务重等特点,具有一定的代表性。通过宝泉抽水蓄能电站水泵水轮发电机组转子组装,总结了高水头高转速水轮发电机组转子组装工艺及技术控制措施,并对关键工艺的技术要点作了较详细的描述,可为同类型机组的转子安装提供参考和借鉴。 相似文献
7.
水轮发电机组容量已从700MW级跃升至1000MW级,机组安装工程中传统的测量技术已不满足要求。激光跟踪测量技术是集合了激光干涉测距技术、光电探测技术、精密机械技术、计算机及控制技术、现代数值计算理论等的高精度工业测量技术,将其引入向家坝水电站的机组安装工程中,形成了一套测量控制方法,是在大型水轮发电机组安装工程中测量技术的创新。 相似文献
8.
悬式水轮发电机组轴线调整是悬式水轮发电机组安装过程中一项十分重要的工作,直接影响机组安装质量和运行振摆,甚至影响机组运行的可靠性和安全性。本文以国内某300MW级抽水蓄能电站高转速悬式机组安装过程中轴线调整为例,在解析机组轴线调整的原理、方法、实施过程的基础上,通过各轴领旋转中心同心度计算和绘制二维曲线图分析机组轴线,并重点阐述采用卡环修刮的办法进行机组轴线垂直度调整,以及对悬式水轮发电机组轴线调整进行简要分析与探讨。 相似文献
9.
通过积石峡水电站三台水轮发电机组座环的安装,总结了大型水电站机组座环安装、调整、焊接等过程的质量控制难点、重点,避免重大质量事故的发生,从而使其安装质量达到设计和规范的要求。 相似文献
10.
介绍了向家坝右岸电站巨型水轮发电机组转子磁极的挂装工艺、安装质量控制要点。对安装过程中出现的磁极键紧固螺钉质量不合格问题进行了处理;为防止机组在过速运行后产生径向永久变形使得空气间隙偏小,安装时采取了有效的预控措施,为机组正常运行提供了保障。 相似文献
11.
以南水北调鹤壁段第二施工标段为例,介绍了渠道逆止阀的安装工艺,如遵循"基础开挖→回填第一层粗砂→埋置集水暗管→回填暗管周边粗砂→铺设保温板→铺设复合土工膜→安装逆止阀"的施工流程;质量控制方法,如控制逆止阀安装位置、高程、数量等。 相似文献
12.
13.
14.
In the planning phase of the extension of the Main Treatment Plant of Vienna, special effort and emphasis were put on the conception of the tender procedure. The project tender was divided into several tender units in order to achieve optimum quality standards by specialised workmanship. Important parameters for operation conditions, especially energy consumption and maintenance costs, were considered and valuated according to the tender guidelines. Suppliers were required to prove the guaranteed quality standards of the tender documents by means of preliminary installation units and extensive performance check procedures. Only after fulfilment of all requirements were suppliers allowed to apply the design of the preliminary installation works to the entire installation. If necessary, extensive optimization works were carried out. Thus favourable operation conditions were achieved and, in particular, a highly efficient aeration system was implemented.Process parameters were optimized by means of a follow-up project during the regular operation phase, taking into consideration the results of the performance check procedures. Further optimization of energy consumption was thereby achieved. 相似文献
15.
雷宇 《南水北调与水利科技(中英文)》2017,(3):161-163
弧形闸门是一种圆弧形的挡水门叶装置, 其具有启闭方便, 运行可靠、 不会影响水流流态等优势, 广泛用于各
类水电站、 水闸泵站中。由于弧形闸门的安装过程比较复杂且对闸门吊装、 组拼、 焊接等精度要求比较高, 因此优化
施工工艺科学施工, 是需要长期思考及探讨的问题。详细介绍南水北调中线工程牤牛河南支节制闸的主要安装过
程及质量控制措施, 安装质量满足了设计运行要求, 可为同类工程参考。 相似文献
16.
17.
三峡右岸地下电站安装6台单机700 MW的发电机组,施工中建立了平面控制网和高程控制网,根据工程进展,进行网点加密和复测,测量成果,提供各施工、监理及金属结构安装单位使用。 相似文献
18.
通过对钢箱梁、拱肋安装过程中的每一施工阶段进行详尽的分析和验算,并在施工中加以有效的控制,从而保证成桥后拱型符合设计期望,结构本身处于最优的受力状态。 相似文献
19.
文章对乌江渡发电厂扩建工程2台水轮机蜗壳的安装进行总结,介绍蜗壳的拼装、挂装、焊接等施工工艺,以及在施工过程中遇到的如蜗壳瓦片成形差及周长超差、焊缝坡口设计不合理、蜗壳混凝土浇筑变形控制、高强钢的加温及保温焊接、焊后消氢处理等控制方法,特别详细地介绍了NK-HITEN610U高强调质钢的焊接工艺及质量控制点,为今后水电站水轮机蜗壳施工工艺提供参考。 相似文献
20.
三峡工程永久船闸浮式系船柱安装工程量大,质量要求高、施工进度要求快,采用传统的施工方法无法满足工程的要求,为此,施工单位采取了单元厂内组装、构件间加临时内支撑、整体一次安装到位、单元与岩体“M”形连接、随时监控等措施,缩短了工期,保证了质量,节省了投资,收到了很好的效果。 相似文献