首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
Some scheduling problems with deteriorating jobs and learning effects   总被引:4,自引:0,他引:4  
Although scheduling with deteriorating jobs and learning effect has been widely investigated, scheduling research has seldom considered the two phenomena simultaneously. However, job deterioration and learning co-exist in many realistic scheduling situations. In this paper, we introduce a new scheduling model in which both job deterioration and learning exist simultaneously. The actual processing time of a job depends not only on the processing times of the jobs already processed but also on its scheduled position. For the single-machine case, we derive polynomial-time optimal solutions for the problems to minimize makespan and total completion time. In addition, we show that the problems to minimize total weighted completion time and maximum lateness are polynomially solvable under certain agreeable conditions. For the case of an m-machine permutation flowshop, we present polynomial-time optimal solutions for some special cases of the problems to minimize makespan and total completion time.  相似文献   

2.
The concepts of deteriorating jobs and learning effects have been individually studied in many scheduling problems. However, most studies considering the deteriorating and learning effects ignore the fact that production efficiency can be increased by grouping various parts and products with similar designs and/or production processes. This phenomenon is known as ‘group technology’ in the literature. In this paper, a new group scheduling model with deteriorating and learning effects is proposed, where learning effect depends not only on job position, but also on the position of the corresponding job group; deteriorating effect depends on its starting time of the job. This paper shows that the makespan and the total completion time problems remain polynomial optimal solvable under the proposed model. In addition, a polynomial optimal solution is also presented to minimise the maximum lateness problem under certain agreeable restriction.  相似文献   

3.
In this paper, we introduce a group scheduling model with general deteriorating jobs and learning effects in which deteriorating jobs and learning effects are both considered simultaneously. This means that the actual processing time of a job depends not only on the processing time of the jobs already processed, but also on its scheduled position. In our model, the group setup times are general linear functions of their starting times and the jobs in the same group have general position-dependent learning effects and time-dependent deterioration. The objective of scheduling problems is to minimise the makespan and the sum of completion times, respectively. We show that the problems remain solvable in polynomial time under the proposed model.  相似文献   

4.
In the paper two resource constrained single-machine group scheduling problems with both learning effects and deteriorating jobs are considered. By learning effects, deteriorating jobs and group technology assumption, we mean that the processing time of a job is defined by the function of its starting time and position in the group, and the group setup times of a group is a positive strictly decreasing continuous function of the amount of consumed resource. We present polynomial solutions for the makespan minimization problem under the constraint that the total resource consumption does not exceed a given limit, and the total resource consumption minimization problem under the constraint that the makespan does not exceed a given limit, respectively.  相似文献   

5.
In this paper, we introduce a new scheduling model in which deteriorating jobs and learning effect are both considered simultaneously. By deterioration and the learning effect, we mean that the actual processing time of a job depends not only on the processing time of the jobs already processed but also on its scheduled position. For the single-machine case, we show that the problems of makespan, total completion time and the sum of the quadratic job completion times remain polynomially solvable, respectively. In addition,we show that the problems to minimize total weighted completion time and maximum lateness are polynomially solvable under certain conditions.  相似文献   

6.
In many realistic situations, the more time you practice, the better learning effect you obtain. Thus, we propose a time-dependent learning effect and introduce it into the single-machine group scheduling problems. The two objectives of scheduling problems are to minimize the makespan and the total completion time, respectively. We also provide two polynomial time algorithms to solve these problems.  相似文献   

7.
This paper addresses single-machine scheduling problems under the consideration of learning effect and resource allocation in a group technology environment. In the proposed model of this paper the actual processing times of jobs depend on the job position, the group position, and the amount of resource allocated to them concurrently. Learning effect and two resource allocation functions are examined for minimizing the weighted sum of makespan and total resource cost, and the weighted sum of total completion time and total resource cost. We show that the problems for minimizing the weighted sum of makespan and total resource cost remain polynomially solvable. We also prove that the problems for minimizing the weighted sum of total completion time and total resource cost have polynomial solutions under certain conditions.  相似文献   

8.
到达时间依赖于资源分配的单机排序问题*   总被引:1,自引:0,他引:1  
研究了具有线性退化及学习效应作用下的单机排序问题,对于工件的到达时间是其资源消耗量的正的严格单调递减函数时,考虑了总资源消耗量限定情形下最大完工时间极小化问题,给出了相应的最优算法;也考虑了满足工件最大完工时间限制的条件下极小化资源消耗的总量问题,提出最优资源分配方案。  相似文献   

9.
In this paper we introduce a new scheduling model with learning effects in which the actual processing time of a job is a function of the total normal processing times of the jobs already processed and of the job’s scheduled position. We show that the single-machine problems to minimize makespan and total completion time are polynomially solvable. In addition, we show that the problems to minimize total weighted completion time and maximum lateness are polynomially solvable under certain agreeable conditions. Finally, we present polynomial-time optimal solutions for some special cases of the m-machine flowshop problems to minimize makespan and total completion time.  相似文献   

10.
In this paper we consider the general, no-wait and no-idle permutation flowshop scheduling problem with deteriorating jobs, i.e., jobs whose processing times are increasing functions of their starting times. We assume a linear deterioration function with identical increasing rates for all the jobs and there are some dominating relationships between the machines. We show that the problems to minimize the makespan and the total completion time remain polynomially solvable when deterioration is considered, although these problems are more complicated than their classical counterparts without deterioration.  相似文献   

11.
This paper considers single machine scheduling problems with setup times and deteriorating jobs. The setup times are proportional to the length of the already processed jobs, that is, the setup times are past-sequence-dependent (p-s-d). It is assumed that the job processing times are defined by functions dependent on their starting times. The following objectives are considered: the makespan, the total completion time, and the sum of earliness, tardiness, and due-window starting time and size penalties. We propose polynomial time algorithms to solve these problems.  相似文献   

12.
This paper considers single machine scheduling problems with setup times and deteriorating jobs. The setup times are proportional to the length of the already processed jobs, that is, the setup times are past-sequence-dependent (p-s-d). It is assumed that the job processing times are defined by functions dependent on their starting times. The following objectives are considered: the makespan, the total completion time, and the sum of earliness, tardiness, and due-window starting time and size penalties. We propose polynomial time algorithms to solve these problems.  相似文献   

13.
In this paper, we study a scheduling model with the consideration of both the learning effect and the setup time. Under the proposed model, the learning effect is a general function of the processing time of jobs already processed and its scheduled position, and the setup time is past-sequence-dependent. We then derive the optimal sequences for two single-machine problems, which are the makespan and the total completion time. Moreover, we showed that the weighted completion time, the maximum lateness, the maximum tardiness, and the total tardiness problems remain polynomially solvable under agreeable conditions.  相似文献   

14.
Recently, Biskup [2] classifies the learning effect models in scheduling environments into two types: position-based and sum-of-processing-time-based. In this paper, we study scheduling problem with sum-of-logarithm-processing-time-based and position-based learning effects. We show that the single machine scheduling problems to minimize the makespan and the total completion time can both be solved by the smallest (normal) processing time first (SPT) rule. We also show that the problems to minimize the maximum lateness, the total weighted completion times and the total tardiness have polynomial-time solutions under agreeable WSPT rule and agreeable EDD rule. In addition, we show that m-machine permutation flowshop problems are still polynomially solvable under the proposed learning model.  相似文献   

15.
In this paper, we consider single machine scheduling problems under position-dependent fuzzy learning effect with fuzzy processing times. We study three objectives which are to minimize makespan, total completion time and total weighted completion time. Furthermore, we show that these three problems are polynomially solvable under position-dependent fuzzy learning effects with fuzzy processing times. In order to model the uncertainty of fuzzy model parameters such as processing time and learning effect, we use an approach called likelihood profile that depends on the possibility and necessity measures of fuzzy parameters. For three objective functions, we build Fuzzy Mixed Integer Nonlinear Programming (FMINP) models using dependent chance constrained programming techniques for the same predetermined confidence levels. Furthermore, we present polynomially solvable algorithms for different confidence levels for these problems.  相似文献   

16.
The focus of this study is to analyze position-based learning effects in single-machine stochastic scheduling problems. The optimal permutation policies for the stochastic scheduling problems with and without machine breakdowns are examined, where the performance measures are the expectation and variance of the makespan, the expected total completion time, the expected total weighted completion time, the expected weighted sum of the discounted completion times, the maximum lateness and the maximum tardiness.  相似文献   

17.
In this paper we consider the single-machine scheduling problems with the effects of learning and deterioration. By the effects of learning and deterioration, we mean that job processing times are defined by functions of their starting times and positions in the sequence. It is shown that even with the introduction of learning effect and deteriorating jobs to job processing times, single machine makespan and sum of completion times (square) minimization problems remain polynomially solvable, respectively. But for the following objective functions: the weighted sum of completion times and the maximum lateness, this paper proves that the WSPT rule and the EDD rule can construct the optimal sequence under some special cases, respectively.  相似文献   

18.
This paper considers single-machine scheduling problems with deteriorating jobs, i.e., jobs whose processing times are an increasing function of their starting times. In addition, the jobs are related by a series–parallel graph. It is shown that for the general linear problem to minimize the makespan, polynomial algorithms exist. It is also shown that for the proportional linear problem of minimization of the total weighted completion time, polynomial algorithms exist, too.  相似文献   

19.
This paper considers the general, no-wait and no-idle flow shop scheduling problems with deteriorating jobs, respectively. By a deteriorating job, we mean that the processing time is a decreasing function of its execution starting time. The normal processing time proportional to its decreasing rate is assumed and some dominant relationships between machines can be satisfied. It is shown that for the problems to minimize the makespan or the weighted sum of completion time, polynomial algorithms still exist, although these problems are more complicated than the classical ones. When the objective is to minimize the maximum lateness, the solutions of a classical version may not hold.  相似文献   

20.
We investigate a single machine scheduling problem in which the processing time of a job is a linear function of its starting time and a variable maintenance on the machine must be performed prior to a given deadline. The goals are to minimize the makespan and the total completion time. We prove that both problems are NP-hard. Furthermore, we show that there exists a fully polynomial time approximation scheme for the makespan minimization problem. For the total completion time minimization problem we point out that there exists a fully polynomial time approximation scheme for a special case.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号