1.
This paper presents the outcomes of a research and development project carried out at the University of Maribor, Construction IT Centre, with regard to the introduction of a building information model (BIM) and a model based construction process into the operational environment of a construction company. The initiative for the project came from the industry and was performed as a joined effort of the research organization and the construction company. Work was performed in the scope of an industrialized construction environment, with the main aim to integrate mass production prefabrication processes with construction site activities. BIM was used as a link between an enterprise resource planning (ERP) information system that supports manufacturing process and construction object related information, mainly handled by CAD tools. The benefits of this link are presented with regard to project progress monitoring and material flow management.  相似文献   

2.
作为建设工程项目重要环节之一,建筑工程设计质量,不仅影响着整个建设工程项目的投资,还影响着建筑工程的整体进度以及建筑工程质量管理。因此,为了有效提高建筑工程设计水平,加强企业设计质量管理,近年来,BIM(建筑信息模型)被引入中国,BIM带来的不仅是先进技术,同时,也是一种先进的质量管理理念,如何更好地发挥BIM的价值,本文基于BIM的建筑设计企业设计质量管理问题进行了探讨。  相似文献   

3.
大直径公铁合建盾构隧道的施工过程较为复杂,为了将产生的信息更好的共享与管理,在施工前期建立基于GIS的BIM模型,BIM模型内的各构件信息包含了该构件的所有三维几何信息和施工信息,通过BIM模型链接施工全寿命周期内产生的信息,并研发建立BIM智慧指挥平台,从而指导项目管理.依托大直径公铁合建盾构隧道项目,将BIM技术覆...  相似文献   

4.
以大型综合体项目为研究对象,基于建筑信息模型(BIM)开展施工进度模拟精细化研究,在此基础上提出一种施工进度管理方法,以期有效提升工程信息化水平。首先利用参数化建模方式创建三维BIM模型,导入广联达BIM5D平台生成四维模型,然后将计划-实施-检查-处置(PDCA)理论与BIM技术相结合,应用在结合点一(宏观视角下施工全过程进度管控)与结合点二(施工进度管控中重点环节的BIM强化应用),最后将该方法应用到大型综合体项目进度管控实例中验证其可行性。结果表明:将BIM技术与PDCA循环管理理论相结合,可以使施工全过程的进度管控目标更明确、管控流程更优化; 实际案例施工段二区的进度模拟次数减少60%,工期整体提前3.5%; BIM和PDCA结合应用有效提升了工程信息化水平,为建立科学有效的进度管理方法提供了新思路。  相似文献   

5.
BIM广泛应用于建筑工程动态可视化管理、信息共享和决策支持中。针对复杂地质环境下的地铁隧道而言,地质模型的准确度决定了隧道的设计质量,影响施工及后期运营安全稳定,而这是BIM较为薄弱环节。以南宁地铁2号线为例,利用Revit的API进行二次开发,建立隧道BIM结构模型和基于地质数据库的三维地质模型,分别得出地铁隧道结构计算和岩土软件数值分析结果,结合项目实时施工进度、隧道结构变形数据、地面沉降数据、建筑物沉降倾斜数据等实时变形监测信息,进行反馈和验证。最终计算结果在web 监测平台上三维可视化,可辅助施工单位及时掌握相关信息并做出应急反应,从而实现BIM在复杂地质环境下地铁隧道三维可视化、结构分析以及安全预警预报的应用。  相似文献   

6.
罗玮 《中国建材科技》2018,27(1):102-103
建筑工程施工进度管理是建筑工程管理的重要内容,关系着整个施工工程的效益和质量,做好该项工作对保证建筑工程如期、高质量完成有着重要的意义。传统的建筑工程进度预测与管理工作多凭借人工完成,进度预测结果往往不够准确,且进度管理手段大多较为被动,无法实现全面、系统、高效的进度控制,而目前,BIM技术的应用则可很好的解决上述问题。鉴于此,本文将对BIM技术在建筑工程施工进度预测与管理中的应用价值进行分析,并就BIM技术在建筑工程施工进度预测与管理中的应用思路、流程、具体对策进行分析,以供参考。  相似文献   

7.
建筑信息模型(BIM)是工程建设行业具有战略意义的新技术。基于BIM理念和技术,本文分析了工程项目全过程BIM技术的现状和前景。结合大栅栏北京坊项目所有参与方共享的协同工作环境,实现了从设计、招投标、施工及交付全过程的BIM模型信息管理,达到提高设计质量与品质、加强施工管理与投资控制、便捷项目交付于运营管理的目标。在项目实施工程中建立了一个面向建设方的企业级BIM实施标准及工程数据管理云平台,实现BIM价值的最大化。  相似文献   

8.
BIM (Building Information Modeling)作为近十年来一项重大革新技术, 在建筑行业产生了广泛而深远的影响。但是研究表明, BIM技术目前多用于建筑的设计和建造阶段。在建筑的全生命周期中, 建筑及相关设施的运营维护费用甚至超出了建筑设计和建造费用之和, 而海量BIM信息在建筑全生命周期中相关各主体间传导时不可避免的产生信息离散化和碎片化, 从而造成了运营维护中信息的缺失, 浪费大量人力物力资源。因此, 笔者在研究BIM技术在建筑运营维护应用现状及所面临一系列挑战的基础上, 提出了一个基于云计算的BIM运营维护平台方案。基于该平台, 建筑运营团队获得一个包含丰富数据、面向对象的、具有智能化和参数化特点的BIM数字化中心数据库, 并通过平台可视化用户交互界面, 极大的提高了团队在设施维护管理, 物业租赁管理, 设备应急管理和运营评估等的效率。最后, 本文通过一假想案例, 展示了如何在医院的环境中通过科联九方?BIM运营维护云平台推动建筑运营维护信息化的应用。  相似文献   

9.
越来越多的设施业主要求项目组移交竣工BIM模型,以便用于建筑的运营和维护。根据项目要求的不同,业主可能将竣工模型建立与移交的责任指派给总承包商。因此,施工队伍的各成员不但越来越需要熟悉BIM建模软件的应用,还需熟悉利用可靠的设施信息支持完整BIM的必要业务流程。竣TBIM模型的创建,要求承包商首先要基于建筑师、工程师和顾问等设计师所提供的图纸和信息的基础上,创建建筑,结构和设备模型。这要求承包商的组织机构内要有一名人员具备各与专业设计模型相关的技能和知识。一旦设计模型被创建(或重新创建),承包商可将这些模型用于开发施工用的BIM模型。一个完整的施工模型通常包括:成本估算,施工进度计划、冲突检测与分析以及现场物流。业主对设施管理用竣工模型提出新增要求,包括添加运营和维护用的具体数据。本文所述项目旨在为了更好地了解,在为业主实施BIM的项目上,承包商对项目所起作用的复杂性。为实现此目标,三所大学合作建立了数个校际团队,从每所学校各抽调一名学生分配至三个团队的一个,充当BIM商业建筑项目BIM应用里的承包商角色。本文从两个方面汇报项目的挑战和细节:导师——项目组织、学习目标和策略,学生——项目组织、团队合作过程以及策略。  相似文献   

10.
随着科技的发展和社会的进步,工程造价管理信息化变成了一个刻不容缓的任务。工程造价管理信息化支撑着造价管理的发展和一系列活动内容,并主导着工程造价管理一系列活动内容的未来走向。BIM的发展应用不是仅局限在工程的设计阶段,而是参与了项目完整的全生命周期的所有阶段:比如设计阶段、预算阶段、施工阶段、成本的管理以及后期运营等。本文对建筑信息模型(BIM)在工程造价方面的种种应用进行了深入总结分析。  相似文献   

11.
地铁车站的建设施工涉及进度、成本、质量、安全等多维度问题,基于施工组织困难、周围环境复杂的施工现状,对工程项目进行信息化和精细化管理显得尤为重要。基于哈尔滨地铁3号线哈平路地铁车站下穿既有地道桥施工项目,采用BIM技术和有限元分析联合深化设计方案,提出一种基于BIM技术的城市地铁车站建设施工联合设计管理方法。工程实践结果表明:BIM技术在三维可视化设计和施工方案优化等方面均表现出了精准、高效的管理水平。所建立的基于成本和进度的5D集成化管理平台实现了工程多维度信息的高效传递,不仅提高了管理效率,还可以确保施工过程安全有序地进行。为以后类似工程实践提供了新思路,在地铁项目施工组织管理等方面有着较大的应用价值。  相似文献   

12.
A cost-based progress curve (called S-curve) is often used to control construction project schedules. To establish a progress curve, the costs that are associated with each scheduling activity must be determined. However, the distributions of the quantities (costs) of cost items among various activities are time-consuming to obtain and error-prone, yielding an unreliable S-curve. This work proposes the use of three-dimensional building information model (BIM) objects to integrate schedule and cost by using the powerful BIM for data acquisition and storage. BIM objects are incorporated into a proposed four-step model to establish construction progress curves. The proposed model defines search criteria (cost item, object, floor, and zone) that precisely identify takeoff objects for extracting the quantities of cost items associated with each activity. The BIM uses keynote, assembly code, and family type catalog functions to provide pop-up menus for the efficient identification of cost items that are associated with each object to preventing errors in the manual typing of cost-item names. Finally, this work demonstrates that uploading the cost items and unit prices into cost estimation software in advance is critical to automating cost estimations in BIM.  相似文献   

13.
建筑信息模型(BIM)在建设工程领域的作用愈来愈凸显,基于BIM 的信息集成管理将极大提高项目管理的效率。充分分析了传统建设项目文档管理系统在信息检索、知识重用方面的不足,同时对BIM 以及IFC 标准进行了详尽的阐述。在此基础上提出在BIM 环境下集成建设项目文档管理系统,并分别分析了系统的实施必要性及技术可行性,提出了系统框架。最后对文本信息集成方法进行了改进,提出适用于中文文本的BIM 环境下建设项目文档管理的实现框架及其支撑技术。研究为可以基于BIM 的建设项目文档管理提供参考。  相似文献   

14.
为了更好地利用BIM技术的信息集成管理优势,推进施工阶段基于BIM的造价精细化管理模式,在施工过程造价BIM成本管理业务流程分析的基础上,对其中造价BIM模型的创建方法及要求、模型构件种类划分、模型构件与工程量清单关联方法、BIM建模精细度进行了详细研究,对业务流程中造价BIM与项目信息的集成管理数据关系模型进行了设计...  相似文献   

15.
Construction control is an essential management function for successful delivery and achieving of construction projects’ goals. Considerable research efforts have been done regarding project control. However, literature suffers from a lack of visualizing the controlling process. With the growth of using visualization techniques in construction, Building Information Modeling (BIM) and Geographic Information System (GIS) have recently attained a widespread contribution in visualization of construction progress. BIM is a process of creating virtual models data that represents building facilities. In this research, BIM represents a platform for nD (n-Dimensional) visualization of construction progress. The advantages of this paper stems from three main contributions for construction projects control: 1) developing of a mathematical model for time control of repetitive construction projects; 2) an automated system to dynamically integrate project progress with BIM technique; and 3) a GIS-based tool to visualize the progress of distributed sites. The developed model provides abundant information to help decision makers take the appropriate corrective actions. An example application is presented to demonstrate the applicability of the developed system.  相似文献   

16.
BIM模型作为新型建造管理技术,其改变了传统的建造管理模式,是一种动态的管理模式。在施工阶段全过程引入BIM技术,可以精准地预测项目成本,合理安排人、材、机和资金等相关资源计划,优化设计变更过程。结合相关实例,探讨BIM技术在施工前期的深化设计与施工模拟、施工过程中工程计量与进度管理、后期竣工结算管理等方面的具体应用,为施工企业进行施工成本精细化管理提供借鉴。  相似文献   

17.
从全球范围来看,BIM已被广泛视为集成建设项目生产流程进而解决建筑业绩效问题的重要手段,但其应用价值的发挥仍面临技术、流程、组织、文化等多方面障碍。论文结合国内外BIM应用实践及我国2D CAD技术的应用历程,分析了BIM在建筑业内的扩散特征,并初步分析了我国建筑业企业的BIM应用策略。面对建设项目设计施工过程中的信息割裂问题以及行业信息技术的迅速发展,建筑业企业需要平衡好成本领先战略和差异化竞争战略的实施,摆脱BIM应用过程中的“无意识性”特征,注重制定科学的多阶段BIM应用目标、系统规划BIM应用方案、并有效集成企业商业流程及项目实施流程,以更好地发挥BIM的应用价值。  相似文献   

18.
Numerous Building Information Modelling (BIM) tools are well established and potentially beneficial in certain uses. However, issues of adoption and implementation persist, particularly for on-site use of BIM tools in the construction phase. We describe an empirical case-study of the implementation of an innovative ‘Site BIM’ system on a major hospital construction project. The main contractor on the project developed BIM-enabled tools to allow site workers using mobile tablet personal computers to access design information and to capture work quality and progress data on-site. Accounts show that ‘Site BIM’, while judged to be successful and actively supporting users, was delivered through an exploratory and emergent development process of informal prototyping. Technical IT skills were adopted into the construction project through personal relationships and arrangements rather than formal processes. Implementation was driven by construction project employees rather than controlled centrally by the corporate IT function.  相似文献   

19.
建筑工程领域的EPC模式指设计、采购及施工一体化,系集成化项目管理模式的范畴。建筑信息模型,简称BIM,是建筑行业的新兴信息技术,对于提升项目管理有着较大的价值[1]。文章从传统设计院转型的工程公司角度出发,采用BIM技术对EPC项目实行全过程的精细化管理,为建立一系列基于BIM技术为核心的企业EPC项目管控体系提供实践基础。  相似文献   

20.
安培  周晓帆 《工程质量》2014,(12):31-37
以天津117大厦项目中BIM技术应用为例,探索BIM技术在项目总承包管理过程中的应用,从BIM实施策划、BIM实施专项应用、BIM综合管理三个方面,阐述了BIM实施内容和管理方式,通过BIM模型作为纽带,将BIM技术与项目总承包管理相结合,实现设计管理和施工管理全过程信息传递及共享,打造设计、施工、资源、商务等一体化BIM总承包管理体系。  相似文献   