共查询到20条相似文献,搜索用时 0 毫秒
1.
Extended studies of measuring and control systems in activated sludge plants at EAWAG revealed that the measuring devices remain the weakest point in control applications. To overcome this problem, a software package was developed which analyses and evaluates the residuals between a reference measurement and the sensor and collects the information in a database. The underlying monitoring concept is based on a two-step evaluation of the residuals by means of statistical evaluations using control charts with two different sets of criteria. The first step is a warning phase in which hints on probable errors trigger an increase in the monitoring frequency. In the second step, the alarm phase, the error hypothesis has to be validated and should allow immediate and targeted reactions from the operator. This procedure enables an optimized and flexible monitoring effort combined with an increased probability of early detection of systematic measuring errors. Beside the monitoring concept, information about the measuring device, the performed servicing actions and the responsibilities is stored. Statistical values for the quantitative characterization of the measuring system during operation will be given. They are needed to parameterise controllers or to guarantee the accuracy of the instrument in order to allow reliable calculations of effluent tax. In contrast to other concepts, not only is the measuring device examined under standard conditions, but so is the entire measuring chain from the liquid to be analysed to the value stored in the database of the supervisory system. The knowledge of the response time of the measuring system is then required in order to allow a comparison of the corresponding values. 相似文献
2.
N. N. Kozhevnikov A. N. Lopatin 《Power Technology and Engineering (formerly Hydrotechnical Construction)》1993,27(6):315-320
1. | Devices for measuring all dredge operating parameters were developed and tested. |
2. | The devices developed are distinguished by simplicity of design, accessibility for manufacture in workshops, their installation and adjustment can be performed by the dredge crew according to the available instruments. |
3. | The technical manuals can be sent by the authors by agreement with customers. For concluding an agreement, contact the article's coauthor N. N. Kozhevikov at the address: 105568, Moscow, Chechulin Street, house 22, apartment 22, telephone 308-80-96. |
3.
4.
本文根据作者实践经验,阐述了堤防填筑工程施工测量监理应注意做好“编制测量监理细则、组织基准点交接、审批施测方案、测量外业监控和内业成果复验”等五个方面工作。 相似文献
5.
6.
7.
8.
9.
10.
11.
简要介绍了丹江口水利枢纽初期工程及安全监测系纯,分析了自动监测资料和自动化监测系统运行情况,并对丹江口大坝今后监测自动化的发展趋势作出了展望. 相似文献
12.
13.
14.
15.
16.
17.
18.
19.
介绍了采用超声波技术进行机组原型效率测试的原理和方法,提供机组运行特性曲线.通过分析,编制龙溪水电站优化运行方案,指导发电运行,实现高效、经济运行的目的. 相似文献