1.
Conclusions The stationary system of elongated triangles considerably reduces the time and labor expenditures for observations of the horizontal displacements of the arch dam. A high accuracy of the measurements is provided in this case.Displacements of the dam toward the lower pool reached 15 mm and depend mainly on the water level in the reservoir.DeceasedTranslated from Gidrotekhnicheskoe Stroitel'stvo, No. 7, pp. 43–47, July, 1982.  相似文献   

2.
Conclusions On-site observations and a theoretical analysis indicate that uplift of rocks in the upper pool during filling of a reservoir can be a substantial factor in the formation of the stress-strain state of the foundation. Under certain geological and hydrogeological conditions uplift can cause rises both of the foundation and abutments and of the banks in the upper and lower pools, or a decrease of settlements compared with those expected.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 4, pp. 10–13, April, 1986.  相似文献   

3.
1.  An analysis of the data of on-site observations in 1990–1993 showed that after a fourfold rise of the water level in the reservoir of the Sayano-Shushenskoe dam, a tendency toward stabilization of most monitored parameters characterizing the static behavior of the structure was noted.
2.  The increase of the irreversible component of radial displacements, tilts, and stresses in concrete slowed. The opening at the rock-concrete contact during seasonal rises of the upper pool level is gradually stabilizing, and the depth of opening (from the upstream face) is not increasing. Although the seepage discharges through the foundation during the last four years increased, the rate of increase decreased by the end of the indicated period.
3.  An increase of drainage discharges and a change in the piezometric heads (sometime anomalous) with the same upper pool levels indicate continuing changes in the stress state in the dam foundation, which is causing the formation of cracks in the rock mass.
4.  The magnitude and character of the change in stresses in the arch abutments and strains in the rock mass of the bank abutments indicate that the actual yielding of the banks was greater than was assumed in the design.
5.  Opening of horizontal joints and cracks on the upstream face within the 50-m zone from the contact during seasonal rises of the UPL to the NPL is continuing. Here a tendency toward penetration of the opening into the depths of the concrete mass is observed. The character of variation of the cantilever stresses at the upstream face in recent years indicates opening of horizontal joints and cracks at elevations higher than 50 m from the base of the structure.
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 10, pp. 42–45, October, 1994.  相似文献   

4.
Conclusion As a result of experimental investigations on a hydraulic model, an improved design of the diversion outlet was obtained, which has practically the same construction volumes and elements and in comparison with the original variant has the following advantages: It has a higher discharge capacity at low levels and a lower capacity at high levels of the water in the reservoir; it provides an allowable maximum fall during damming of the river channel; it provides the maximum allowable discharge at the highest water level in the reservoir; it guarantees a free flow in the pipes in the entire range of discharges; it has better spreading and dissipation of the energy of the flow in the lower pool; it provides a 25% smaller depth of scouring in the lower pool; it prevents local scouring of the tailwater channel in the immediate vicinity of the structure.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 11, pp. 12–14, November, 1989.  相似文献   

5.
Conclusions Seepage in the foundation of the SSh hydrostation has a nonuniform but regular character and substantially depends on the acting head and SSS. At an elevation of the UPL of less than 520 m, a change in the permeability of the rock mass is observed mainly on the upstream side of the grout curtain. The intensity of decompression of the rocks increases with increase of elevation of the UPL, especially above 534 m. At 540 m the zone of decompression of the contact part of the foundation in some places intersects the grout curtain and in individual cases intercepts the drainage; the discharge of the drain wells increases by 5–7 times in comparison with the discharge at an elevation of the UPL of 500 m. The width of the joints near the drainage (according to calculation) averages from 0.3–0.5 to 0.73 mm; here and there it can reach 1.5–2 mm. The average gradient of the head in the grout curtain is within 10–15; at individual places near the drainage it reaches 26, which is at the level of the allowable for a rock mass.A method of controlling seepage is mainly used in such cases — repeated grouting at low elevations of the UPL, including with the use of plastic grouts, which in individual cases accelerate setting of the additives.As measures for improving the seepage conditions and quality of monitoring, we can recommend plugging places of water shows through the grouting holes at an elevation of the UPL of 500–510 m, intensifying drainage in stretches of increased inflows and passages of the head beyond the drainage line, and broadening of geophysical and hydrogeological investigations for a detailed study of the character of change in permeability and seepage during fluctuations of the reservoir, especially at high elevations. During operation of the dam it is necessary not to exceed the attained rates and level of filling the reservoir (elevation 540.25 m), since at levels close to the NPL, the seepage discharge increases intensely.The underground contour of the Sayano-Shushenskoe dam is of high quality and operates effectively and reliably under conditions of a varying stress-strain state of the foundation during fluctuations of the reservoir level.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 17–24, January, 1992.  相似文献   

6.
Monitoring water quality in reservoirs with IRS-1A-LISS-I   总被引:1,自引:1,他引:0  
An attempt has been made to quantify the relationship between the variation in IRS-IA-LISS-I (Indian Remote Sensing Satellite-1A Linear Imaging Self-Scanning System) radiance data and field measured change in secchi disc depth. Secchi disc depth was measured for 47 predetermined sampling locations on reservoir surface water. At extinction depth (secchi depth), water samples were collected from all the sampling locations. Suspended sediments of eight locations representing various reaches of the reservoir were selected for mineralogical, particle size and optical properties analysis. The LISS-I radiance value in band 1 (0.45–0.52µm) band 2 (0-52–0.59 µm) and band 3 (0.62–0.68 µm) were used in a regression analysis. The absorption infrared band 4 (0.77–0.86 µm) was not included in the analysis. In these, the dependable variable was secchi depth (SD) and the LISS-I-radiance data was the estimator variable. Forty-seven data sets of 20 October 1988 from Tawa reservoir surface water were used to obtain an estimator equation for SD. The verification of the estimator equation was tested by applying it to a data set of 21 measurements of 28 September 1988 for this reservoir. The coefficient of correlation between observed and estimated values for the 28 September 1988 data set wasr=0.92 for SD, indicating that the equation could accurately predict the water clarity (SD) for this reservoir on new occasions from IRS-IA-LISS-I spectral data. It is shown that mineral composition and optical properties of suspended sediments influence the reflected radiance of water quality. It is concluded that IRS-IA-LISS-I data provide a useful means of mapping water quality in reservoir.  相似文献   

7.
Conclusions  
1.  During discharge of a flow from a cone valve at small heads E0/hv≤1.2, when the upper part of the jet falls on its lower part, the maximum velocities are observed in the center of the flow, and when E0/hv>1.2 their maximum values shift toward the side walls, which can lead to erosion of the banks in the lower pool of the structures.
2.  Experimental dependences were obtained for determining the conjugate depths in the lower pool beyond the cone valves with free discharge of the flow into the atmosphere.
3.  The proposed efficient structures for dissipating the excess energy of the flow beyond cone valves make it possible to distribute the unit discharges over the width of the lower pool and to avoid dangerous erosion of the bottom and banks of the river channel.
Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 7, pp. 28–30, 1997.  相似文献   

8.
Using the Ust'-Khantaika hydraulic power system as an example, results are presented from investigations to obtain corrected relationships between the capacity and water levels of the reserve by taking into account the increase in the capacity as a result of deformation of the bed of the reservoir and banks associated with defrosting of permafrost rock. A precise curve expressing the correlation V=f(z) of the reservoir during its lifetime is needed to arrive at a proper selection of the optimal operating mode of the hydroelectric power plant. Recommendations are presented for further investigations intended to verify the precise dependences of the capacity on the levels of the reservoir to correct the hydroeconomic and hydropower indicators of the Ust'-Khantaika reservoir.Translated from Gidrotekhnicheskaya Stroitel'stvo, No. 3, pp. 19–23, March, 1995.  相似文献   

9.
1.  The fluvial processes in the Ob River downstream of the hydro development, which markedly changed after damming the river and creation of the reservoir during the first decade of operation of the hydrostation, were expressed in the natural process of deep erosion of the channel, which had a diminishing character.
2.  Starting with the second half of the 1960s, quarrying in the Ob channel on the 30-km stretch of the lower pool adjacent to the hydrostation began to have a substantial effect on the natural process of transformation of the channel due to streamflow regulation and retention of sediments by the reservoir.
3.  During the period between 1966 and 1984 more than 40 million m3 of sand-gravel mixture was removed from the river channel and floodplain in the indicated stretch, as a result of which the decrease of levels relative to the normal, natural values at the site of the Novosibirsk gauging station was 0.9–1.0 m.
4.  A decrease of the levels downstream led to a deficit of water resources of the reservoir in dry years and, as a consequence, to worsening of the operating conditions of the majority of participants of the Novosibirsk water-management complex.
5.  After some stabilization of the position of the levels in the river in 1984–1986, the decrease, slump, of the levels in the stretch passing through the city subsequently resumed beginning in 1987–1988. The rating curve for the Novosibirsk gauging station in 1988 shifted downward from the analogous 1986 curve along the height axis by 15–20 cm.
6.  The priority task facing water users and consumers of Novosibirsk is the fastest possible realization of the recommendations of MGU, VNIIG, and ZapSibRNIGMI on partial restoration of the water levels in the stretch between the hydrostation and Novosibirsk city by constructing embankments damming nonnavigable branches and converting the Ob channel here at low-water discharges (less than 2000 cm3/sec) into a single-branch channel.
7.  For a radical solution of the problem of reliable provision of water consumers of Novosibirsk, it is necessary to reconstruct all intakes located downstream of the hydro development.
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 10, pp. 25–28, October, 1989.  相似文献   

10.
Conclusion The first experiments confirmed the reliability of the calculated estimates and prospects of orthogonal turbines. Further efforts should apparently be directed toward a search for particular designs and their checking by obtaining the turbine characteristics of orthogonal runners on models with a diameter of at least 0.4–0.5 m at heads of several meters.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 17–19, January, 1991.  相似文献   

11.
Conclusions An analysis showed that the water intakes for selective withdrawal of water from a reservoir for water-supply purposes known from the scientific and technical literature cannot be used effectively for withdrawing a large quantity of water for hydrostation turbines, and the known intakes for selective withdrawal of a large quantity of water have substantial shortcomings and are in need of further design improvement. Simultaneously with this, the conclusions of the 1993 Divnogorsk conference that at present “it is impossible to freeze the Yenisei River within the Krasnoyarsk city limits” for a number of reasons is confirmed. However, under more favorable conditions than the Krasnoyarsk hydrostation, the selective withdrawal of water from a deepwater intake for hydrostation turbines, despite the high additional expenditures, can be justified and necessary. The proposed design of a floating intake of an electric power station has a number of advantages compared with the known floating intakes. In this case it recommended to direct the water that is withdrawn from the surface layer of the reservoir and passed only through one or two turbines to save expenditures to the bank part of the river, which promotes in the lower pool the formation of ice near the river banks and in its branches in the winter and their “warming” in the summer. Translated from Gidrotekhnicheskoe Stroitel’stvo, No. 9, pp. 46–49, September, 1997.  相似文献   

12.
Conclusion When using a ski-jump bucket behind bottom outlets of dams the depth of the lower pool at which submergence of the ski-jump and then the outlet occurs can be calculated by Eq. (5).With an increase of the angle of inclination of the ski-jump, submergence occurs at smaller depths of the lower pool. For example, for inclined ski-jumps with angles 20 and 27° the difference of the values of the critical depths compared with a horizontal deflector is respectively about 10 and 13%.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 7, pp. 29–31, July, 1984.  相似文献   

13.
Conclusions Bed-load discharge in a curved channel (with curvature of the channel line and preservation of parallelism of the banks) considerably increases compared with a straight channel, and the more so, the greater the ratio v/v0.The hydraulic resistances in the experiments with a curved channel increase insignificantly compared with a straight channel ('the Chezy coefficients C in the experiments with the curved channel line decrease by 5–12%).Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 5, pp. 37–40, May, 1987.  相似文献   

14.
Conclusion It is recommended to use the given relationships when designing dikes of reservoirs operated under conditions similar to the conditions of the Kiev PSS reservoir [3–5].To refine a number of the foregoing assumptions and proposed relationships, it is expedient to continue hydrophysical investigations of the dynamics of formation of the structure and mechanical strength of the layered ice prism on the slopes of the dike of the Kiev PSS reservoir.The materials presented and also the data of on-site observations can serve as grounds for developing as a first approximation a method of designing revetments of dike slopes of PSS reservoirs for the effect of ice.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 3, pp. 14–16, March, 1982.  相似文献   

15.
1.  Oscillations due to low-frequency sources of excitation beneath the impeller in the draft tube develop in long pipelines of water-storage power plants.
2.  For the Zagorsk water-storage power plant with a long (790 m) and flexible pipeline, the natural frequency of the first type of the system's oscillation is many times lower than the predominant frequency of the lowest-frequency component of the spectrum of pressure fluctuations beneath the impeller (0.24–0.25)fre. For a shorter and stiffer pipeline, the system would approach resonance.
3.  The dynamic properties of the system depend on the opening of the guide apparatus: for small openings, the natural frequency approaches f1=(C/4)L; with large openings, it approaches f2=(C/2)L.
4.  When the unit is operating in the stationary mode, the hydrodynamic loads on the pipe lining do not exceed 0.05 MPa; this corresponds to an additional stress of 0.07 MPa in the lining and vibrational displacements of 0.183 mm (when C=780 m/sec), i.e., not more than 0.06 of the radius of the pipeline; when C=965 m/sec, the vibrational displacements do not exceed 0.08 mm.
5.  The loads on the pipeline supports do not exceed 0.36 tons on any one pile.
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 8, pp. 27–30, August, 1992.  相似文献   

16.
Conclusions It can be concluded from the design studies of the creation of air curtains for the Chirkey and Miatla hydrostations that in reality it is possible to provide reliability of dams already constructed in regions where the design seismicity was increased by constructing an air curtain.One can, of course, also reduce the hydrostatic load on the dam by reducing the elevation of the reservoir. However, then the reduction of the storage capacity of the reservoir and decrease of head worsen the power capabilities of the hydrostation by an amount far exceeding the expenditures related to creating the air curtain. For example, the one-time expenditures on creating the air curtain for the Chirkey hydrostation in 1984 prices are 10 million rubles, whereas a reduction of the normal pool level would lead to underproduction of energy amounting to about this sum every year.The second direction is the provision of the design seismicity of a dam under construction (planned). Then in the case of using an air curtain it is possible to construct a dam with smaller volumes of concrete.In the case of a gravity dam, this is 5–10% of the total volume of concrete, whereas the planned stationary air curtain for the Miatla hydrostation cost only about 1 million rubles in 1984 prices.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 10, pp. 6–9, October, 1992.  相似文献   

17.
Conclusion The ideas presented in this work can be transferred practically to all problems of hydraulic engineering related to the problem of the interaction of a flow and unrevetted channel, when solving problems of determining the depth of the scour pocket in the lower pool of dams, problems of the parameters of a tortuous channel, etc.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 7, pp. 31–33, July, 1988.  相似文献   

18.
Conclusion The given classification of waste quarries being mined and the recommendations on calculating the stability of their slopes are aimed at increasing the safety of performing works on hydraulic-fill dumps with orientation toward the wider use of wastes in the economy.Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 6, pp. 14–15, June, 1990.  相似文献   

19.
宜兴抽水蓄能电站上水库全库盆采用钢筋混凝土面板防渗,防渗总面积为18.06万m2。库岸稳定是上水库的主要工程地质问题之一,而影响库岸稳定的主要因素是地下水。工程共设置了5.1 km排水洞及排水廊道,6.5万m排水孔,确保坝体、库岸稳定和降低面板所受的反向水压力。  相似文献   

20.
Conclusion Deformations of the rock foundation of the Bratsk dam occurred mainly during filling of the reservoir and primarily due to the weight of the water operation. During operation, settlements have increased insignificantly with a clear tendency toward their fading away. The maximum settlement, 74 mm, which had been predicted as early as 1966, was reached in 1970; in 1977 it amounted to 74.4 mm. Horizontal deformations have practically stabilized. At the base of the dam, if slight consolidation occurred at all during construction (which, apparently, caused mainly differential settlement of the sections), then it was hardly noted by observations. Despite the explicit stabilization of the processes, observations of settlements and horizontal displacements retain their importance, considering the essential character of the structures, the seismicity of the region, and the slowness of processes characteristic for hydraulic structures. The geodetic base of the Bratsk hydrostation has certain shortcomings: the bench marks are located on a diabase sheet and can settle along with it; the nearness of the diabase rock quarry to the right-bank bench marks; the rather long and complex traverse along the foreshores. Use of the geodetic base is also difficult: the traverses along the foreshores are difficult and dangerous owing to the adjacent high (up to 80 m) steep cliffs, the natural disintegration of which causes rock falls. We consider that it would be more convenient and reliable to embed bench marks with anchors in sandstones below the upper zone of consolidation (depth 100–120 m) in the bank tunnels of the inspection gallery at the 27-m level. Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 8, pp. 43–46, August, 1979.  相似文献   