首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
In this paper, some multi-item inventory models for deteriorating items are developed in a random planning horizon under inflation and time value money with space and budget constraints. The proposed models allow stock dependent consumption rate and partially backlogged shortages. Here the time horizon is a random variable with exponential distribution. The inventory parameters other than planning horizon are deterministic in one model and in the other, the deterioration and net value of the money are fuzzy, available budget and space are fuzzy and random fuzzy respectively. Fuzzy and random fuzzy constraints have been defuzzified using possibility and possibility–probability chance constraint techniques. The fuzzy objective function also has been defuzzified using possibility chance constraint against a goal. Both deterministic optimization problems are formulated for maximization of profit and solved using genetic algorithm (GA) and fuzzy simulation based genetic algorithm (FAGA). The models are illustrated with some numerical data. Results for different achievement levels are obtained and sensitivity analysis on expected profit function is also presented.Scope and purposeThe traditional inventory model considers the ideal case in which depletion of inventory is caused by a constant demand rate. However for more sale, inventory should be maintained at a higher level. Of course, this would result in higher holding or procurement cost, etc. Also, in many real situations, during a shortage period, the longer the waiting time is, the smaller the backlogging rate would be. For instance, for fashionable commodities and high-tech products with short product life cycle, the willingness for a customer to wait for backlogging diminishes with the length of the waiting time. Most of the classical inventory models did not take into account the effects of inflation and time value of money. But at present, the economic situation of most of the countries has been much deteriorated due to large scale inflation and consequent sharp decline in the purchasing power of money. So, it has not been possible to ignore the effects of inflation and time value of money any further. The purpose of this article is to maximize the expected profit of two inventory control systems in the random planning horizon.  相似文献   

2.
In this paper, a multi-objective production planning model has been presented for a captive plant. The model includes multi-products, multi-plants, and multi-objective with some probabilistic constraints. The probabilistic constraints have been transformed into deterministic constraints assuming the parameters as independent normal random variables. The deterministic problem has been computed with two different methods, namely weighting method and fuzzy programming method. Finally, the integral solution obtained by these two methods have been compared.  相似文献   

3.
In this paper, a fuzzy multi-objective programming problem is considered where functional relationships between decision variables and objective functions are not completely known to us. Due to uncertainty in real decision situations sometimes it is difficult to find the exact functional relationship between objectives and decision variables. It is assumed that information source from where some knowledge may be obtained about the objective functions consists of a block of fuzzy if-then rules. In such situations, the decision making is difficult and the presence of multiple objectives gives rise to multi-objective optimization problem under fuzzy rule constraints. In order to tackle the problem, appropriate fuzzy reasoning schemes are used to determine crisp functional relationship between the objective functions and the decision variables. Thus a multi-objective optimization problem is formulated from the original fuzzy rule-based multi-objective optimization model. In order to solve the resultant problem, a deterministic single-objective non-linear optimization problem is reformulated with the help of fuzzy optimization technique. Finally, PSO (Particle Swarm Optimization) algorithm is employed to solve the resultant single-objective non-linear optimization model and the computation procedure is illustrated by means of numerical examples.  相似文献   

4.
An important issue, when shipping cost and customers demand are random fuzzy variables in supply chain network (SCN) design problem, is to find the network strategy that can simultaneously achieve the objectives of minimization total cost comprised of fixed costs of plants and distribution centers (DCs), inbound and outbound distribution costs, and maximization customer services that can be rendered to customers in terms of acceptable delivery time. In this paper, we propose a random fuzzy multi-objective mixed-integer non-linear programming model for the SCN design problem of Luzhou Co., Ltd. which is representative in the industry of Chinese liquor. By the expected value operator and chance constraint operator, the model has been transformed into a deterministic multi-objective mixed-integer non-linear programming model. Then, we use spanning tree-based genetic algorithms (st-GA) by the Prüfer number representation to find the SCN to satisfy the demand imposed by customers with minimum total cost and maximum customer services for multi-objective SCN design problem of this company under condition of random fuzzy customers demand and transportation cost between facilities. Furthermore, the efficacy and the efficiency of this method are demonstrated by the comparison between its numerical experiment results and those of tradition matrix-based genetic algorithm.  相似文献   

5.
This paper investigates multi-objective solid transportation problems (MOSTP) under various uncertain environments. The unit transportation penalties/costs are taken as random, fuzzy and hybrid variables respectively, in three different uncertain multi-objective solid transportation models and in each case, the supplies, demands and conveyance capacities are fuzzy. Also, apart from source, demand and capacity constraints, an extra constraint on the total budget at each destination is imposed. Chance-constrained programming technique has been used for the first two models to obtain crisp equivalent forms, whereas expected value model is formulated for the last. We provide an another approach using the interval approximation of fuzzy numbers for the first model to obtain its crisp form and compare numerically two approaches for this model. Fuzzy programming technique and a gradient based optimisation - generalised reduced gradient (GRG) method are applied to beget the optimal solutions. Three numerical examples are provided to illustrate the models and programming.  相似文献   

6.
The coupling of performance functions due to common design variables and uncertainties in an engineering design process will result in difficulties in optimization design problems, such as poor collaboration among design objectives and poor resolution of design conflicts. To handle these problems, a fuzzy interactive multi-objective optimization model is developed based on Pareto solutions, where the metric function and some additional constraints are added to ensure the collaboration among design objectives. The trade-off matrix at the Pareto solutions was developed, and the method for selecting weighting coefficients of optimization objectives is also provided. The proposed method can generate a Pareto optimal set with the maximum satisfaction degree and the minimum distance from ideal solution. The favorable optimal solution can be then selected from the Pareto optimal set by analyzing the trade-off matrix and collaborative sensitivity. Two examples are presented to illustrate the proposed method.  相似文献   

7.
In this paper, an interactive approach based method is proposed for solving multi-objective optimization problems. The proposed method can be used to obtain those Pareto-optimal solutions of the mathematical models of linear as well as nonlinear multi-objective optimization problems modeled in fuzzy or crisp environment which reasonably meet users aspirations. In the proposed method the objectives are treated as fuzzy goals and the satisfaction of constraints is considered at different α-level sets of the fuzzy parameter used. Product operator is used to aggregate the membership functions of the objectives. To initiate the algorithm, the decision maker has to specify his(er) preferences for the desired values of the objectives in the form of reference levels in the membership space. In each iterative phase, a single objective nonlinear (usually nonconvex) optimization problem has to be solved. It is solved using real coded genetic algorithm, MI-LXPM. Based on its outcomes, the decision maker has the option to modify, if felt necessary, some or all of the reference levels in the membership function space before initiating the next iterative phase. The algorithm is stopped where user’s aspirations are reasonably met.  相似文献   

8.
Real world production planning is involved in optimizing different objectives while considering a spectrum of parameters, decision variables, and constraints of the corresponding cases. This comes from the fact that production managers desire to utilize from an ideal production plan by considering a number of objectives over a set of technological constraints. This paper presents a new multi-objective production planning model which is proved to be NP-Complete. So a random search heuristic is proposed to explore the feasible solution space with the hope of finding the best solution in a reasonable time while extracting a set of Pareto-optimal solutions. Then each Pareto-optimal solution is considered as an alternative production plan in the hand of production manager. Both the modeling and the solution processes are carried out for a real world problem and the results are reported briefly. Also, performance of the proposed problem-specific heuristic is verified by comparing it with a multi-objective genetic algorithm on a set randomly generated test data.  相似文献   

9.
Many practical optimization problems are characterized by some flexibility in the problem constraints, where this flexibility can be exploited for additional trade-off between improving the objective function and satisfying the constraints. Fuzzy sets have proven to be a suitable representation for modeling this type of soft constraints. Conventionally, the fuzzy optimization problem in such a setting is defined as the simultaneous satisfaction of the constraints and the goals. No additional distinction is assumed to exist amongst the constraints and the goals. This paper proposes an extension of this model for satisfying the problem constraints and the goals, where preference for different constraints and goals can be specified by the decision-maker. The difference in the preference for the constraints is represented by a set of associated weight factors, which influence the nature of trade-off between improving the optimization objectives and satisfying various constraints. Simultaneous weighted satisfaction of various criteria is modeled by using the recently proposed weighted extensions of (Archimedean) fuzzy t-norms. The weighted satisfaction of the problem constraints and goals are demonstrated by using a simple fuzzy linear programming problem. The framework, however, is more general, and it can also be applied to fuzzy mathematical programming problems and multi-objective fuzzy optimization.  相似文献   

10.
In many real-world optimization problems, several conflicting objectives must be achieved and optimized simultaneously and the solutions are often required to satisfy certain restrictions or constraints. Moreover, in some applications, the numerical values of the objectives and constraints are obtained from computationally expensive simulations. Many multi-objective optimization algorithms for continuous optimization have been proposed in the literature and some have been incorporated or used in conjunction with expert and intelligent systems. However, relatively few of these multi-objective algorithms handle constraints, and even fewer, use surrogates to approximate the objective or constraint functions when these functions are computationally expensive. This paper proposes a surrogate-assisted evolution strategy (ES) that can be used for constrained multi-objective optimization of expensive black-box objective functions subject to expensive black-box inequality constraints. Such an algorithm can be incorporated into an intelligent system that finds approximate Pareto optimal solutions to simulation-based constrained multi-objective optimization problems in various applications including engineering design optimization, production management and manufacturing. The main idea in the proposed algorithm is to generate a large number of trial offspring in each generation and use the surrogates to predict the objective and constraint function values of these trial offspring. Then the algorithm performs an approximate non-dominated sort of the trial offspring based on the predicted objective and constraint function values, and then it selects the most promising offspring (those with the smallest predicted ranks from the non-dominated sort) to become the actual offspring for the current generation that will be evaluated using the expensive objective and constraint functions. The proposed method is implemented using cubic radial basis function (RBF) surrogate models to assist the ES. The resulting RBF-assisted ES is compared with the original ES and to NSGA-II on 20 test problems involving 2–15 decision variables, 2–5 objectives and up to 13 inequality constraints. These problems include well-known benchmark problems and application problems in manufacturing and robotics. The numerical results showed that the RBF-assisted ES generally outperformed the original ES and NSGA-II on the problems used when the computational budget is relatively limited. These results suggest that the proposed surrogate-assisted ES is promising for computationally expensive constrained multi-objective optimization.  相似文献   

11.
Wireless sensor networks are deployed in complex and uncertain environments, and multiple objectives of routing algorithms are expected to be optimal. However, routing algorithms based on deterministic single objective optimization may not flexibly meet the above needs of applications. This paper adopts fuzzy random optimization and multi-objective optimization, introduces fuzzy random variables to describe both fuzziness and randomness of link delay, link reliability and nodes’ residual energy, and proposes a routing model based on fuzzy random expected value and standard deviation model. A hybrid routing algorithm based on fuzzy random multi-objective optimization is designed, which embeds fuzzy random simulation into genetic algorithm with Pareto optimal solution. Simulation results show that the presented algorithm, by adjusting the parameters of fuzzy random variables for depicting both fuzziness and randomness, achieves a longer lifetime and wider performances of delay, latency jitter, reliability, communication interference, energy and balanced energy distribution. Therefore, the presented algorithm can meet different application needs of the cluster head network in the two-tiered wireless sensor networks.  相似文献   

12.
In this paper, we propose a model and solution approach for a multi-item inventory problem without shortages. The proposed model is formulated as a fractional multi-objective optimisation problem along with three constraints: budget constraint, space constraint and budgetary constraint on ordering cost of each item. The proposed inventory model becomes a multiple criteria decision-making (MCDM) problem in fuzzy environment. This model is solved by multi-objective fuzzy goal programming (MOFGP) approach. A numerical example is given to illustrate the proposed model.  相似文献   

13.
While the usual assumptions in multi-periodic inventory control problems are that the orders are placed at the beginning of each period (periodic review) or depending on the inventory level they can happen at any time (continuous review), in this article, we relax these assumptions and assume that the periods between two replenishments of the products are independent and identically distributed random variables. Furthermore, assuming that the purchasing price are triangular fuzzy variables, the quantities of the orders are of integer-type and that there are space and service level constraints, total discount are considered to purchase products and a combination of back-order and lost-sales are taken into account for the shortages. We show that the model of this problem is a fuzzy mixed-integer nonlinear programming type and in order to solve it, a hybrid meta-heuristic intelligent algorithm is proposed. At the end, a numerical example is given to demonstrate the applicability of the proposed methodology and to compare its performance with one of the existing algorithms in real world inventory control problems.  相似文献   

14.
In this paper, we concentrate on developing a fuzzy rough multi-objective decision-making model according to uncertainty theory. We present some equivalent models and a traditional algorithm based on an interactive fuzzy satisfying method, which is similar to the interactive fuzzy rough satisfying method, in order to obtain a satisfying solution for the decision maker. In addition, the technique of fuzzy rough simulation is applied to deal with general fuzzy rough objective functions and fuzzy rough constraints which are usually difficult to convert into their equivalents. Furthermore, combined with the techniques of fuzzy rough simulation, a genetic algorithm using the compromise approach is designed for solving a fuzzy rough multi-objective programming problem. Finally, a model is applied to an inventory problem to illustrate the usefulness of the proposed model and algorithm, and then a sensitivity analysis is made.  相似文献   

15.
This paper presents a bi-objective vendor managed inventory (BOVMI) model for a supply chain problem with a single vendor and multiple retailers, in which the demand is fuzzy and the vendor manages the retailers’ inventory in a central warehouse. The vendor confronts two constraints: number of orders and available budget. In this model, the fuzzy demand is formulated using trapezoidal fuzzy number (TrFN) where the centroid defuzzification method is employed to defuzzify fuzzy output functions. Minimizing both the total inventory cost and the warehouse space are the two objectives of the model. Since the proposed model is formulated into a bi-objective integer nonlinear programming (INLP) problem, the multi-objective evolutionary algorithm (MOEA) of non-dominated sorting genetic algorithm-II (NSGA-II) is developed to find Pareto front solutions. Besides, since there is no benchmark available in the literature to validate the solutions obtained, another MOEA, namely the non-dominated ranking genetic algorithms (NRGA), is developed to solve the problem as well. To improve the performances of both algorithms, their parameters are calibrated using the Taguchi method. Finally, conclusions are made and future research works are recommended.  相似文献   

16.
Fuzzy systems comprise one of the models best suited to function approximation problems, but due to the non linear dependencies between the parameters that define the system rules, the solution search space for this type of problems contains many local optima. Another important issue is the identification of the optimum structure for the fuzzy system. Depending on the complexity of the model, different solutions can be found with different compromises between their approximation error and their generalization properties. Thus, the problem becomes a multi-objective problem with two clearly competing objectives, the complexity of the model and its approximation error.The algorithms proposed in the literature to construct fuzzy systems from examples usually refine iteratively a unique model until a compromise between its complexity and its approximation error is found. This is not an adequate approach for this problem because there exists a set of Pareto-optimum solutions that can be considered equivalent. Thus, we propose the use of multi-objective evolutionary algorithms because, as they maintain a population of potential solutions for the problem, they are able to optimize both objectives simultaneously. We also incorporate some new expert evolutionary operators that try to avoid the generation of worse solutions in order to accelerate the convergence of the algorithm.The proposed algorithm is tested with some target functions widely used in the literature and the results obtained are compared to other approaches.  相似文献   

17.
An “economic production lot size” (EPLS) model for an item with imperfect quality is developed by considering random machine failure. Breakdown of the manufacturing machines is taken into account by considering its failure rate to be random (continuous). The production rate is treated as a decision variable. It is assumed that some defective units are produced during the production process. Machine breakdown resulting in idle time of the respective machine which leads to additional cost for loss of manpower is taken into account. It is assumed that the production of the imperfect quality units is a random variable and all these units are treated as scrap items that are completely wasted. The models have been formulated as profit maximization problems in stochastic and fuzzy-stochastic environments by considering some inventory parameters as imprecise in nature. In a fuzzy-stochastic environment, using interval arithmetic technique, the interval objective function has been transformed into an equivalent deterministic multi-objective problem. Finally, multi-objective problem is solved by Global Criteria Method (GCM). Stochastic and fuzzy-stochastic problems and their significant features are illustrated by numerical examples. Using the result of the stochastic model, sensitivity of the nearer optimal solution due to changes of some key parameters are analysed.  相似文献   

18.
In this paper, a multiobjective quadratic programming problem fuzzy random coefficients matrix in the objectives and constraints and the decision vector are fuzzy variables is considered. First, we show that the efficient solutions fuzzy quadratic multiobjective programming problems series-optimal-solutions of relative scalar fuzzy quadratic programming. Some theorems are to find an optimal solution of the relative scalar quadratic multiobjective programming with fuzzy coefficients, having decision vectors as fuzzy variables. An application fuzzy portfolio optimization problem as a convex quadratic programming approach is discussed and an acceptable solution to such problem is given. At the end, numerical examples are illustrated in the support of the obtained results.  相似文献   

19.
Multiobjective and single-objective inventory models of stochastically deteriorating items are developed in which demand is a function of inventory level and selling price of the commodity. Production rate depends upon the quality level of the items produced and unit production cost is a function of production rate. Deterioration depends upon both the quality of the item and duration of time for storage. The time-related deterioration function follows a two-parameter Weibull distribution in time. In these models, results are derived for both without shortages and partially backlogged shortages. Here, objectives for profit maximization for each item are separately formulated with different goals and compromise solutions of the multiobjective production/inventory problems are obtained by goal programming method. The models are illustrated with numerical examples and results for different formulations are compared. The results for the models assuming them to be a single house integrated business are also obtained using a gradient-based optimization technique and compared with those obtained from the respective decentralized models. Taking man-machine interaction into consideration, interactive solutions are derived for one of the said models—multiobjective model with shortages using interactive fuzzy satisficing method. Pareto optimum and satisficing results are derived for some numerical data.  相似文献   

20.
《Knowledge》2007,20(5):495-507
Decisions in a decentralized organization often involve two levels. The leader at the upper level attempts to optimize his/her objective but is affected by the follower; the follower at the lower level tries to find an optimized strategy according to each of possible decisions made by the leader. When model a real-world bilevel decision problem, it also may involve fuzzy demands which appear either in the parameters of objective functions or constraints of the leader or the follower or both. Furthermore, the leader and the follower may have multiple conflict objectives that should be optimized simultaneously in achieving a solution. This study addresses both fuzzy demands and multi-objective issues and propose a fuzzy multi-objective bilevel programming model. It then develops an approximation branch-and-bound algorithm to solve multi-objective bilevel decision problems with fuzzy demands. Finally, two case-based examples further illustrate the proposed model and algorithm.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号