首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 15 毫秒
1.
Wastewater from seafood industry contains high concentrations of organic matter, nitrogen compounds, and solid matter. Constructed wetland can be used as tertiary treatment and for nutrient recycling. This research studied the performance of nitrogen and suspended solids removal efficiency of a constructed wetland treating wastewater from a seafood-processing factory located at Songkhla, southern Thailand. The existing constructed wetland has dimensions of 85 m, 352 m and 1.5 m in width, length and depth respectively, with an area of about 29,920 m2. The water depth of 0.30 m is maintained in operation with plantation of cattails (Typha augustifolia). Flow rate of influent ranged between 500-4,660 m3/d. Average hydraulic retention time in the constructed wetland was about 4.8 days. Influent and effluent from the constructed wetland were collected once a week and analyzed for pH, temperature, dissolved oxygen (DO), biochemical oxygen demand (BOD5), Suspended solid (SS), total Kjeldahl nitrogen (TKN), ammonia nitrogen (NH3-N), organic nitrogen (Org-N), nitrate (NO3-N), and nitrite (NO2-N). The average removal efficiencies of BOD5, SS, TKN, NH3-N, and Org-N were 84%, 94%, 49%, 52% and 82%, respectively. It was found that the constructed wetland acting as a tertiary treatment process provided additional removal of BOD5, SS and TKN from wastewater from the seafood industry.  相似文献   

2.
A pilot scale treatment system was established in 2002 at the Laflèche Landfill in Eastern Ontario, Canada. The system consists of a series of treatment steps: a stabilisation basin (10,000 m3), a woodland peat trickling filter (5,200 m2), a subsurface flow constructed wetland planted in Phragmites sp. (2,600 m2), a surface flow constructed wetland planted in Typha sp. (3,600 m2) and a polishing pond (3,600 m2). The system operates from May to December with leachate being recycled within the landfill during the winter months. Hydraulic loading was increased three-fold over four operating seasons with nitrogen and organic mass loading increasing six-fold. Excellent removal efficiencies were observed with 93% BOD5, 90% TKN and 97% NH4-N removed under the highest loading conditions. Almost complete denitrification was observed throughout the treatment system with NO3-N concentrations never exceeding 5mg L(-1). The peat filter reached treatment capacity at a hydraulic loading of 4cm d(-1) and organic loading rate of 42 kg BOD ha(-1) d(-1), which is consistent with design criteria for vertical flow wetland systems and intermittent sand filters, The first order plug flow kinetic model was effective at describing TKN and ammonium removal in the SSF and FWS wetlands when background concentrations were taken into account. Ammonium removal k-values were consistent with the literature at 52.6 and 57.7 yr(-1) for the SSF and FWS wetlands, respectively, while TKN k-values at 6.9 and 7.7 yr(-1) were almost an order of magnitude lower than literature values, suggesting that leachate TKN could contain refractory organics not found in domestic wastewater.  相似文献   

3.
"Dirty water", a wastewater produced on dairy farms, is typically disposed of by application to land with no prior treatment. Pollution can occur if the dirty water reaches a watercourse following an inadequate period of retention in the soil. This paper describes experiments using a novel, soil-based batch recirculation system for pre-treating dirty water prior to land application. Three polythene-lined, vegetated soil-based treatment planes (23 m long, 1 m wide, 0.25 m deep) were constructed. Each treatment plane was supplied with approximately 1 m3 of dirty water which was recirculated until a clear treatment pattern had emerged. Five batches were treated over a six-month period. The soil-based treatment system could typically be expected to achieve a 90% removal of key pollutants in approximately two weeks for BODs and NH4-N, and three weeks for MRP and total solids. An exponential trendline gave a good fit to the treatment curves for BOD5, NH4-N and MRP after the first day or two of batch treatment. The data for total solids removal were more variable. Treatment rates were sustained throughout the five runs for BOD5 and NH4-N, indicating no apparent effect of seasonal weather on the treatment process. The apparent progressive slowing of the MRP removal rate throughout the treatment of the five batches may have implications for the sustainable use of this technology for phosphorus control.  相似文献   

4.
Data from 18 sampling wells in Kodij?rve horizontal subsurface flow (HSSF) constructed wetland (CW) (South Estonia) is presented and differences in purification efficiencies inside the HSSF CW are calculated. Temporarily anaerobic conditions in the Kodij?rve HSSF system did not allow efficient removal of BOD7, NH4-N, Ntot and Ptot. In 2002 a vertical subsurface flow filter was constructed to enhance aeration. The design of the system was based simply on the oxygen demand of the wastewater and on the aeration potential of vertical flow wetlands. The vertical flow system has shown satisfactory results. The purification efficiency of BOD7 in the Kodij?rve CW has improved significantly and there has been a slight increase in purification efficiencies of NH4-N and Ntot. On the ohther hand, the removal efficiency of Ptot has decreased significantly. Although, the mass loading rates have increased, mass removal rates of all four parameters have improved significantly. Nevertheless, optimization of the constructed wetland system is essential in order to meet effluent standards during wintertime.  相似文献   

5.
土壤过滤系统处理农村生活污水的 试验研究   总被引:1,自引:0,他引:1  
采用一种土壤过滤系统处理农村生活污水,考察了该工艺对CODCr、BOD5、NH3-N、全氮(TN)和全磷(TP)的去除效果。实验结果表明,当水力负荷约为0.05 m3/(m2·d), 水力停留时间为3 d时。该土壤过滤系统对CODCr、BOD5、NH3-N、全氮(TN)和全磷(TP)的去除效果较好,平均去除率分别达到84.6%、83.3%、64.3%、59.8%和70%。出水CODCr约为18.3~42.1 mg/L,BOD5约为8.9~17.3 mg/L,NH3-N约为11.2~17.7 mg/L,TN约为21.2~31.3 mg/L,TP小于2.0 mg/L,出水水质优于农田灌溉水质标准(GB 5084—2005)。气温变化和进水污染物浓度对处理效果影响明显。总体上来讲,温度大于22 ℃时,进水污染物浓度越低处理效果越好。  相似文献   

6.
This research project aimed to determine the technologically feasible and applicable wastewater treatment systems which will be constructed to solve environmental problems caused by small communities in Turkey. Pilot-scale treatment of a small community's wastewater was performed over a period of more than 2 years in order to show applicability of these systems. The present study involves removal of organic matter and suspended solids in serially operated horizontal (HFCW) and vertical (VFCW) sub-surface flow constructed wetlands. The pilot-scale wetland was constructed downstream of anaerobic reactors at the campus of TUBITAK-MRC. Anaerobically pretreated wastewater was introduced into this hybrid two-stage sub-surface flow wetland system (TSCW). Wastewater was first introduced into the horizontal sub-surface flow system and then the vertical flow system before being discharged. Recirculation of the effluent was tested in the system. When the recirculation ratio was 100%, average removal efficiencies for TSCW were 91 +/- 4% for COD, 83 +/- 10% for BOD and 96 +/- 3% for suspended solids with average effluent concentrations of 9 +/- 5 mg/L COD, 6 +/- 3 mg/L BOD and 1 mg/L for suspended solids. Comparing non-recirculation and recirculation periods, the lowest effluent concentrations were obtained with a 100% recirculation ratio. The effluent concentrations met the Turkish regulations for discharge limits of COD, BOD and TSS in each case. The study showed that a hybrid constructed wetland system with recirculation is a very effective method of obtaining very low effluent organic matter and suspended solids concentrations downstream of anaerobic pretreatment of domestic wastewaters in small communities.  相似文献   

7.
An on-site study on the operational performance of a combined eco-system of ponds and SF constructed wetland for municipal wastewater treatment and reclamation/reuse in Donging City, Shandong, China was carried out from January 2001 through October 2003. The removal efficiencies for various main parameters were: TSS 84.8 +/- 7.3%, BOD5 87.2 +/- 5.3%, CODCr 70.2 +/- 18.6%, TP 52.3 +/- 23.1%, and NH(3)-N 54.8 +/- 23.9% with effluent concentration of TSS 9.12 +/- 5.12 mg/l, BOD5 6.44 +/- 4.58 mg/l, CODCr, 42.8 +/- 6.7 mg/l, TP 0.94 +/- 0.27 mg/l and NH(3)-N 7.95 +/- 2.36 mg/l. In addition, the removal efficiencies for faecal coliforms and total bacteria were > 99.97% and > 99.998% respectively, which well meet Chinese National standards for effluent quality of municipal wastewater treatment plants. The composition of TSS was closely related to CODCr and BOD5 variations, and nitrification-denitrification is the major mechanism of nitrogen removal both in ponds and in wetlands. In addition, sedimentation also played an important role in the removal of TSS, nitrogen, phosphorus and BOD5. The removal efficiencies of various parameters, the number of species and biomass of biological community in the system increased gradually with the ecological maturation.  相似文献   

8.
北方某人工湿地净化能力分析   总被引:1,自引:1,他引:0  
在对北方某人工湿地长期观测取得的大量详尽数据的基础上,分析了人工湿地系统总体净化能力和潜流人工湿地水质动态变化特征。结果表明:该人工湿地示范工程对水质净化效果较为明显,对各类污染物的去除率平均可达40%;潜流人工湿地可对污水进行深度处理,对BOD5、NH4-N的去除效果最好,去除率为80%~90%,对NO3-N、TN的去除效果较好,去除率为65%~75%,对CODMn和SS的去除效果一般,去除率为40%~60%,对TP的去除效果随着时间推移逐渐减弱,碎石吸附对TP去除起主要作用。  相似文献   

9.
张云  蔡彬彬 《人民长江》2017,48(10):30-32
将生态湿地技术用于处理南通市某污水处理厂的尾水,详细介绍了处理工艺流程和设计参数,并对主要技术指标进行了分析。运行结果表明:生态湿地技术对城市污水处理厂尾水具有较好的净化效果,对COD、BOD5、NH3-N和TP的平均去除率分别达到60.1%,55.3%,76.6%,57.8%以上,出水水质达到了《地表水环境质量标准》(GB3838-2002)中Ⅲ类水的要求,有效削减了污染物的入河排放量,改善了区域水环境质量。  相似文献   

10.
Duckweed-based ponds (DWBPs) have the potential for nitrogen (N) removal from wastewater; however, operational problems such as duckweed die-off regularly occur. In this study, effluent recirculation was applied to the DWBPs to solve the above problem as well as to investigate N removal mechanisms. Two pilot scale recirculated DWBPs were employed to treat municipal wastewater. The average removal efficiencies for TN, TKN and NH4-N were 75%, 89% and 92%, respectively at TN loading of 1.3 g/m2.d and were 73%, 74% and 76%, respectively at TN loading of 3.3 g/m2.d. The effluent of the system under both operational conditions had stable quality and met the effluent standard. Duckweed die-off was not observed during the study, which proves the system stability and effluent recirculation which is thought to be a reason. N-mass balance revealed that nitrification-denitrification and duckweed uptake play major roles in these recirculated DWBPs. The rates of nitrification-denitrification were increased as TN loading was higher, which might be an influence from an abundance of N and a suitable condition. The rates of N uptake by duckweed were found similar and did not depend on the higher TN loading applied, as the duckweed has limited capacity to assimilate it.  相似文献   

11.
A three-stage constructed wetland for leachate treatment was monitored on a landfill at a pilot scale. The plant had been designed to achieve at least 75% nitrogen removal. NH4-N input concentration was 240 (median) up to 290 mgl(-1) and COD concentration was 455 to 511 mgl(-1), respectively. A 14 m2 vertical flow sand filter plus a 14 m2 horizontal flow sand filter followed by a 3.3 m2 vertical flow sand filter was chosen. Acetic acid was added to the horizontal flow system for denitrification. The results showed a very stable nitrification rate within the vertical flow system of 94% (median) at NH4-N loading rates of about 10 (median) up to 17 gm(-2)d(-1). Denitrification was mainly dependent on the dosing of acetic acid and could reach a maximum of 98%. One interesting effect was the production of nitrite in the horizontal flow sand filter. This could efficiently be eliminated by the subsequent vertical flow sand filter. The chosen concept proved to be very effective for nitrogen removal. In combination with a final activated carbon filter the COD effluent concentrations could be easily and safely controlled. The design of denitrification reed beds showed a further potential for optimization.  相似文献   

12.
用氧化塘—浮石床湿地系统处理暖寒季低污染河水   总被引:1,自引:0,他引:1       下载免费PDF全文
在滇池流域构建氧化塘-浮石床湿地复合系统对暖季与寒季的城市低污染河水开展了净化效能研究。结果表明:该系统可通过小幅调节流量来有效净化暖季与寒季低污染河水。塘与湿地的水力负荷分别为0.22、0.37m3/(m2.d)时系统对暖季低污染河水具有较高的处理效率,各污染物的平均去除率分别为CODCr75%、TP 93%、TN 64%、NH4+-N 87%。塘与湿地的水力负荷分别为0.17、0.29 m3/(m2.d)时系统对寒季低污染河水具有较优的处理效果:各污染物的平均去除率分别为CODCr72%、TP 89%、TN 53%、NH4+-N 73%。系统出水均符合GB18918-2002的一级A排放标准。系统在暖季对低污染河水中污染物的去除速率明显高于寒季。  相似文献   

13.
With the aim of protecting drinking water sources in rural regions, pilot-scale subsurface water flow (SSF) and free water surface flow (FWS) constructed wetland systems were evaluated for removal efficiencies of nitrogenous pollutants in tertiary stage treated wastewaters (effluent from the Pasak?y biological nutrient removal plant). Five different hydraulic application rates and emergent (Canna, Cyperus, Typhia sp., Phragmites sp., Juncus, Poaceae, Paspalum and Iris) and floating (Pistia, Salvina and Lemna) plant species were assayed. The average annual NH4-N, NO3-N and organic-N treatment efficiencies were 81, 40 and 74% in SSFs and 76, 59 and 75% in FWSs, respectively. Two types of the models (first-order plug flow and multiple regression) were tried to estimate the system performances. Nitrification, denitrification and ammonification rate constants (k20) values in SSF and FWS systems were 0.898 d-1 and 0.541 d(-1), 0.486 d(-1) and 0.502 d(-1), 0.986 d(-1) and 0.908, respectively. Results show that the first-order plug flow model clearly estimates slightly higher or lower values than observed when compared with the other model.  相似文献   

14.
An eco-system consisting of integrated ponds and constructed wetland systems is employed in Dongying City, Shandong Province for the treatment and utilization of municipal wastewater with design capacity of 100,000 m(3)/d. The total capital cost of this system is 680 Yuan (RMB) or US dollars 82/m(3)/d, or about half that of the conventional system based on activated sludge process, and the O/M cost is 0.1 Yuan (RMB) or US dollars 0.012/m(3), only one fifth that of conventional treatment systems. The performance of the wastewater treatment and utilization eco-system is quite good with a final effluent COD, BOD, SS, NH3-N and TP of 45-65 mg/l, 7-32 mg/l, 12-35 mg/l, 2-13 mg/l and 0.2-1.8mg/l respectively and the annual average removals of COD, BOD, SS, NH3-N and TP are 69.1%, 78.3%, 76.4%, 62.1% and 52.9%o respectively, which is much better than that of conventional pond system or constructed wetland used separately and illustrates that the artificial and integrated eco-system is more effective and efficient than the simple natural eco-system.  相似文献   

15.
Nitrogen removal performance and the ammonia-oxidising bacterial (AOB) community were assessed in the batch loaded 1.3 ha saturated surface vertical flow wetland at CSBP Ltd, a fertiliser and chemical manufacturer located in Kwinana, Western Australia. From September 2008 to October 2009 water quality was monitored and sediment samples collected for bacterial analyses. During the period of study the wetland received an average inflow of 1,109 m3/day with NH3-N = 40 mg/L and NO3-N = 23 mg/L. Effluent NH3-N and NO3-N were on average 31 and 25 mg/L, respectively. The overall NH3-N removal rate for the period was 1.2 g/m2/day indicating the nitrifying capacity of the wetland. The structure of the AOB community was analysed using group specific primers for the ammonia monooxygenase gene (amoA) by terminal restriction fragment length polymorphism and by clone libraries to identify key members. The majority of sequences obtained were most similar to Nitrosomonas sp. while Nitrosospira sp. was less frequent. Another two vertical flow wetlands, 0.8 ha each, were commissioned at CSBP in July 2009, since then the wetland in this study has received nitrified effluent from these two new cells.  相似文献   

16.
两种复合垂直流人工湿地污水处理对比研究   总被引:1,自引:0,他引:1  
构建下行流-上行流、下行流-下行流两套复合人工湿地处理生活污水,考察不同运行方式下两套湿地系统污染物净化效果。结果表明,下行流-上行流复合系统适合在较低水力负荷[0.6m3/(m^2.d)]下运行,系统连续进水5天的出水效果很好,COD、TP、氨氮、TN的去除率分别为75%-95%、65%-85%、45%-80%、45%-80%。下行流-下行流复合系统耐水力负荷冲击能力强,适合在高水力负荷[1.2m3/(m^2.d)]下运行,COD、TP、氨氮、TN的去除率分别为70%-95%、40%-85%、50%-90%、50%-80%;其水流方式较下行流-上行流复合系统水流方式更利于复氧,有利于高水力负荷下COD、氨氮的降解。研究成果为实际中人工湿地处理生活污水的运行操作提供了依据和参考。  相似文献   

17.
李运来  袁博宇 《中国水利》2006,(21):53-54,20
官厅水库黑土洼人工湿地系统经过一年多的运行,经历了严寒冬季的考验,获取了1万多组监测数据。通过对BOD5等指标去除率分析,人工湿地对Orth—D、TP、CODMn去除率较多,TN、NH4^+-N、NO^-3-N处理效果一般。建议二期工程进一步改进工艺,促进有机物的降解。  相似文献   

18.
深圳市布吉污水处理厂构建人工湿地试验研究   总被引:2,自引:0,他引:2  
为了最大程度地改善深圳市布吉河水质状况,在先期进行布吉污水处理厂中试试验的基础上,建设了小型人工湿地,深度处理污水处理厂二级出水,探讨污水处理厂二级出水在人工湿地基础上的改善程度,为该市布吉污水处理厂建设完成后是否规划建设景观湿地提供参考依据。结果表明:人工湿地对二级出水的COD、NH3-N、TN、TP等重要控制指标均有比较明显的深度处理作用;夏季的运行效果总体上比秋、冬季处理效果好,季节变化对TN去除率的影响最为明显,但对出水COD、NH3-N、TP指标影响相对较小。  相似文献   

19.
Two MBR pilot systems were constructed and tested in the Bali Primary WWTP. The pilot study shows that two MBR systems, i.e. the Green-MenBio system (MBR-1) and the Bio-MF system (MBR-2), can both fulfill the requirement of wastewater reclamation standard. The MBR-2 system is more economical compared with MBR-1 system. The cost of US dollars 0.10-0.16/m3 is estimated to reclaim the effluent of primary WWTP in Taiwan. The Bali Primary WWTP has the capacity of 1,320,000 cmd which is the biggest in Taiwan. The domestic wastewater of partial Taipei City and Taipei County are collected and transported to the Bali Primary WWTP. The effluent of the Bali Primary WWTP is then discharged into the ocean through two 3.8 m marine outfalls. The AO processes are installed in both MBR systems. More than 90% of the NH3-N can be removed through the AO and membrane processes. The outflow of the MBR systems (without RO) can reach the quality of COD <30 mg/l, BOD <10 mg/l, SS <5 mg/l, NH3-N <3 mg/L. The outflow of the MBR system is proposed to transport 40 km south to the Taoyuan County where four new industrial parks are to be constructed. Part of the reclaimed water is to be used on irrigation and another portion is to be sent to the industries after RO treatment.  相似文献   

20.
A novel technology suitable for centralised and decentralised wastewater treatment has been developed, extensively tested at laboratory-scale, and trialled at a number of sites for populations ranging from 15 to 400 population equivalents (PE). The two-reactor-tank pumped flow biofilm reactor (PFBR) is characterised by: (i) its simple construction; (ii) its ease of operation and maintenance; (iii) low operating costs; (iv) low sludge production; and (v) comprising no moving parts or compressors, other than hydraulic pumps. By operating the system in a sequencing batch biofilm reactor (SBBR) mode, the following treatment can be achieved: 5-day biochemical oxygen demand (BOD5), chemical oxygen demand (COD) and total suspended solids (TSS) reduction; nitrification and denitrification. During a 100-day full-scale plant study treating municipal wastewater and operating at 165 PE and 200 PE (Experiments 1 and 2, respectively), maximum average removals of 94% BOD5, 86% TSS and 80% ammonium-nitrogen (NH4-N) were achieved. During the latter part of Experiment 2, effluent concentrations averaged: 14 mg BOD5/l; 32 mg COD(filtered)/l; 14 mg TSS/l; 4.4 mg NH4-N/l; and 4.0 mg NO3-N/l (nitrate-nitrogen). The average energy consumption was 0.46-0.63 kWh/m3(treated) or 1.25-1.76 kWh/kg BOD5 removed. No maintenance was required during these experiments. The PFBR technology offers a low energy, minimal maintenance technology for the treatment of municipal wastewater.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号