This paper presents a comprehensive overview study of the DDPMSG (direct driven permanent magnet synchronous generator) for wind energy generation system. Wind turbine controls are provided. The PMSG (permanent magnet synchronous generator) is introduced as construction and model. Configurations of different power converters are presented for use with DDPMSG in wind systems at variable speed operation and maximum power capture. Control techniques for the system are discussed for both machine-side and grid-side in details. Grid integration is provided with focus on how to insure power quality of the system and the performance at disturbances.  相似文献   

2.
Short circuit and ground failures that are quite common in power transmission lines are investigated. These failures are designed considering a system that is supplied by this wind system, and analyses are interpreted. In the study, a system is set up and it is fed by the wind turbine. Furthermore, the mathematical model of wind turbine and generator is prepared and the results obtained from the simulation are evaluated. The short circuit and ground fault analyzes were performed separately for each of the three phases. ATP (alternative transient program)-EMTP (electromagnetic transients program) program is used in the analysis and the results obtained were found to be quite compatible.  相似文献   

3.
In this article, the authors give an overview of different logistics concepts for operation and maintenance of OWPP (offshore wind power plants). These can be generally classified into onshore based and offshore based concepts. The operation of OWPPs can still be improved as research has shown that the availability of OWPPs is low compared to onshore wind power plants. There are a few tools to calculate operating costs and to evaluate the different concepts. However, most tools have a weak focus on logistics although logistics account for a big share of the costs. The tool the authors are introducing in this article focuses on the logistics processes. It is first explained and then tested with an OWPP scenarin  相似文献   

4.
The aim of this work is double. Firstly, we want to stress out that investing in renewable energies in 2009 in Spain was a profitable activity. This question will be answered studying the possibilities of expanding "Sierra de Tineo" wind farm in the Principality of Asturias (location, wind resource, data analysis, simulation, legal standards and economic and sensitivity study of the investment), and for that, data from the year 2009 have been used. And secondly, the goal is to set the bases for a future paper where the current situation of Spain (within the renewable framework), will be compared with the 2009 scenario.  相似文献   

5.
6.
Power quality is one of the major concerns among consumers and electric utility companies. CUPS (custom power systems) devices are used to improve the quality of power and enhance the reliability of the power supply in the distribution networks. The DVR (dynamic voltage restorer) is an important CUPS device used to mitigate voltage sag/swell and imbalances. Various control techniques have been implemented to control the DVR, among which the PID (proportional-integral-derivative) controller is dominant because of its model independent property and its error driven technique. In this paper, a new controller based on the ADRC (active disturbance rejection control) concept is developed, and its performance is compared to that of the PID controller. The model of the DVR and its ADRC and PID controllers were developed under the MATLAB (matrix laboratory)/Simulink environment. The simulation results demonstrated the effectiveness of the ADRC over the PID controller.  相似文献   

7.
The wind power generation is increasing in many countries as a result of decreasing technology costs, active government policies for renewable energy sources, environmental concerns, etc.. This paper investigates the impact of wind power generation on ATC (available transmission capacity) calculation. In order to determine the maximum incremental MW transfer possible between two parts of a power system without violating any specified limits, ATCs are calculated. When calculating ATC values, it is necessary to assume production and consumption pattern in power system. Production of wind power depends on the wind speed, which is a random variable and it is impossible to forecast exactly the production of wind power that is needed for the ATCs calculation. In order to investigate influence of the stochastic wind power production on the ATCs value, computer model of Croatian electric power system is made in Power World Simulator. ATCs are calculated for southern part of Croatian power system in which besides wind power, hydro power plants are only type of power generation. Available wind speed measurements are used as input data for wind power production. The results of the ATC calculation for different scenario of wind power production and location in the Southern Croatian power system are presented and discussed in the paper.  相似文献   

8.
9.
Japan's first open sea offshore wind farm, Kamisu offshore windfarm Phase l, was stricken by an earthquake of intensity 6 on the Japanese seismic scale and a five-meter-high tsunami during the Great East Japan Earthquake on March 11,2011. The wind farm resumed operation on March 14 after checks revealed no damage to the system, even though the wind farm was temporarily forced to stop due to the grid failure caused by the earthquake. Wind turbines require a precise seismic design especially in an earthquake-prone country such as Japan. Wind power Kamisu Phase 2 was built one year after the earthquake based on the experience of Kamisu Phase 1. This paper presents the seismic design of offshore wind turbines and the situation during the earthquake and tsunami.  相似文献   

10.
A distribution grid is generally characterized by a high R/X (resistance/reactance) ratio and it is radial in nature. By design, a distribution grid system is not an active network, and it is normally designed in such a way that power flows from transmission system via distribution system to consumers. But in a situation when wind turbines are connected to the distribution grid, the power source will change from one source to two sources, in this case, network is said to be active. This may probably have an impact on the distribution grid to whenever the wind turbine is connected. The best way to know the impact of wind turbine on the distribution grid in question is by carrying out load flow analysis on that system with and without the connection of wind turbines. Two major fundamental calculations: the steady-state voltage variation at the PCC (point of common coupling) and the calculation of short-circuit power of the grid system at the POC (point of connection) are necessary before carrying out the load flow study on the distribution grid. This paper, therefore, considers these pre-load flow calculations that are necessary before carrying out load flow study on the test distribution grid. These calculations are carded out on a test distribution system.  相似文献   

11.
The electric energy which is generated by wind power plants depends on the wind speed and exceeds with strong permissible wind speed the electric energy requirements of the country. In order not to reduce this electrical energy, it must be stored. The sensible energy storage is currently the pumped storage power plants. As the mountain ranges for conventional pumped storage power plants with drop heights of H 〉 600 m are strictly limited, the development of low potential pumped storage power plants has begun. Increasing the capacity of pumped storage power plants with regard to the wind power plants is urgently needed. In this paper, it is shown using the example of an unneeded port facility, how a port facility can be used after low conversion as a test facility for low potential pumped storage power plants and at the same time for the testing of hydro-kinetic turbines. This type of pump storage power plants does not save the energy due to large drop heights, but primarily due to the large volume flow of water.  相似文献   

12.
The installation of wind power generators on buildings located in areas with regular winds may be a suitable investment in a renewable power source. Brazil has a high eolic potential, where the annual mean wind speed may reach over eight meters per second. This case study is aimed to assess the economic feasibility of the installation of small wind power plants in urban areas. This work evaluates a project for the installation of a vertical axis wind turbine in three buildings (15-, 22-, and 26-story) including the following stages: (1) installation of a real-time power meter in the 15-store unit; (2) demand analysis of the 26-store building's power consumption; (3) winds survey along the coast of the State of Ceara; (4) analysis of the wind turbines available in the market; (5) simulation aimed to choose the system. Vertical wind power generators offer better conditions of use in urban areas. The turnover time was established to be between four and six years in the three studied units. The installation of a wind power generator on buildings in regions with an adequate eolic regimen reaches a financial return of the investment before the end of the equipment's lifespan.  相似文献   

13.
This research seeks to evaluate the economic benefits to be gained by installing a small-scale wind turbine for a customer with a three-phase electrical supply requirement. The evidence for the claims made in this paper is obtained by using actual data obtained from the installed equipment over a three year period. The objective is to accurately appraise the financial investment using real data. There appears to be limited studies conducted into this type of research, possibly because the renewable energy sector is in the infancy stage in the host country, Ireland. There are some wind energy installations with financial appraisal techniques based on modeled data, which may, or may not, be accurate. The study concludes by claiming that the financial benefits of the wind energy turbine installation had disappointing results when compared to predicted benefits based on modeled data.  相似文献   

14.
The development of offshore wind energy is fast as it is clean, safe and of high efficiency. The harsh marine environment raises high demand on the foundation design of offshore wind turbine. Earthquake loading is one of the most significant factors which should be considered in the design phase. In this paper, a group of earthquake centrifuge tests were conducted on a physical wind turbine model with tripod foundation. The seismic responses of both wind turbine model and foundation soil were analyzed in terms of the recorded accelerations, pore water pressures, lateral displacements and settlements. The results were also compared with those measured in the previous research on mono-pile foundation. It is demonstrated that the tripod foundation can provide better resistance in the lateral displacement and structural settlement under earthquake loading.  相似文献   

15.
The present paper addresses an advanced teaching lab consisting of setting up an islanded production unit. This teaching lab takes place in the very last semester at master level for students in electrical engineering with energy specialization. The purpose of this teaching lab is to combine knowledge learned in different areas such as power electronics, control, electrical machines and networks, and make use of all of them in practice. The present paper describes in detail the different steps followed by the student to set up an islanded production unit.  相似文献   

16.
Early and accurate fault detection and diagnosis for renewable energy systems can increase their safety and ensure the continuity of their service. This paper presents a comprehensive review of different fault detection and diagnosis methods for hybrid renewable energy systems consisting of a wind turbine power generator, a PV (photovoltaic) array, a PEM (polymer electrolyte membrane) fuel cell and a battery storage system. The need of batteries to store the generated power from the solar panel, wind turbine or PEM fuel cell is also emphasized. Finally, an overview of the current methods used in the diagnosing of the lead-acid battery degradation is given.  相似文献   

17.
In this paper, a new control method for synchronous motor with excitation and damper windings is presented. It is based on one type of nonlinear control; feedback linearization control. To make a realization in the sense of electric drive, symmetricM space vector PWM (pulse width modulation) is applied. Estimation of damper winding currents via Lyapunov function for the whole estimated system is done. The aim of control is to make tracking system for rotor speed and square of stator flux. Simulation of motor starting to predefined operating points is done, and also maintaining these points during step change of load torque is obtained. Simulations give good results.  相似文献   

18.
This paper develops a high time-resolution optimal power generation mix model in its time resolution of 10 minutes on 365 days by linear programming technique. The model allows us to analyse the massive deployment of photovoltaic system and wind power generation in power system explicitly considering those short-term output variation. PV (photovoltaic) and wind output are estimated, employing meteorological database. Simulation results reveal that variable fluctuation derived from a high penetration level of those renewables is controlled by quick load following operation of natural gas combined cycle power plant, pumped-storage hydro power, stationary NAS (sodium and sulfur) battery and the output suppression control of PV and wind. It additionally turns out that the operational configuration of those technologies for the renewable variability differs significantly depending on those renewable output variations in each season and solving the seasonal electricity imbalance as well as the daily imbalance is important if variable renewables are massively deployed.  相似文献   

19.
Due to randomness of wind generator's availability, power system planners have big concern on EEG (expected energy generation) and system reliability of power system with wind generators. This paper presents a methodology to evaluate the EEG as well as overall LOLP (loss of load probability), which is an index for system reliability of multi-area interconnected systems with wind generators, as well as conventional fossil fuel based generating units. The proposed model is also capable of tracking the energy export incorporating the multi-state probability model for wind generator which output varies with time and season.  相似文献   

20.
In this paper, a high power factor LED driver with hot swap, smart output voltage regulation and dimming control is proposed. The dimming control is used to change LED brightness. During converter is working, the hot swap function supply users to remove and insert LED module. The smart output voltage can regulate quickly and rightly output voltage in different number of LED series connection. The system consists two stages, one is 50 W flyback converter which is used as power factor corrector, it is input source is 110-220 V, PF (power factor) is about 0,994. The other is Boost DC/DC converter, it can offer 35-60 V of output voltage. Finally, a prototype has been built and tested. The simulation and experimental results are shown to verify the feasibility of the proposed method.  相似文献   