首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   26篇
  免费   0篇
化学工业   3篇
机械仪表   1篇
建筑科学   1篇
能源动力   1篇
轻工业   8篇
无线电   1篇
一般工业技术   4篇
冶金工业   1篇
自动化技术   6篇
  2018年   1篇
  2013年   10篇
  2012年   1篇
  2011年   1篇
  2010年   1篇
  2007年   1篇
  2006年   1篇
  2002年   1篇
  1999年   1篇
  1998年   1篇
  1997年   1篇
  1989年   1篇
  1982年   1篇
  1978年   1篇
  1976年   1篇
  1974年   1篇
  1968年   1篇
排序方式: 共有26条查询结果,搜索用时 15 毫秒
21.
22.
23.
24.
Dynamic lot sizing heuristics commonly implemented in standard MRP software perform well under conditions of systematic demand only. A survey and numerical test of methods proposed in the literature shows that techniques are available which cope efficiently with both systematic and erratic demand. The paper discusses theoretical and practical ramifications of the dynamic lot sizing problem, surveys heuristics published in the U.S. and West German literature, reports summarily on the findings of extensive simulation experiments involving these heuristics, and, as a conclusion from analytical and numerical results, proposes an algorithm which enhances performance under conditions of erratic demand.  相似文献   
25.
In the past 30 years, Sanya has developed into a high-density city with fragmented ecosystems and bottlenecked urban development. In April 2015, the Ministry of Housing and Urban-Rural Development proposed “Ecological Restoration and Urban Remediation” for Sanya and prioritized the Sanya and Linchun Rivers — two rivers that run through the central city — as core causes. The Fengxinglong Ecological Park project is located at the junction of the two rivers in downtown and its surroudings are occupied for various land uses. Diversified urban interfaces, abundant green space, and numerous ecological contradictions make the site critical for the remediation and restoration of waterways in Sanya. Through a series of resilient landscape design interventions, Fengxinglong Ecological Park catches, stores, and purifies rainwater to reduce river pollution and flooding disasters in addition to offering recreational funtions. As a valuable “urban sponge” and comprehensive resilient ecological park, it has helped restore the historic ecosystem and realized the intensive use of resources.  相似文献   
26.
Extensive research on the Economic Lot Scheduling Problem (ELSP), and on related topics, has produced powerful techniques originally designed to solve quite specific (coordination) problems. This paper emphasizes the omni-presence of coordination issues in multi-item inventories, characterizes them as problems of staggering and/or clustering replenishment activities or events, and shows how ELSP techniques combine to form a pertinent and fairly comprehensive methodology. A numerical example illustrates the use of one particularly powerful tool (powers of two) in stabilizing replenishment workloads.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号