排序方式: 共有25条查询结果,搜索用时 0 毫秒
11.
12.
Boiling structures on evaporation surface of red copper sheet with a diameter (D) of 10 mm and a wall thickness (h) of 1 mm were processed by the ploughing-extrusion (P-E) processing method, which is one part of the phase-change heat sink for high power (HP) light emitting diode (LED). The experimental results show that two different structures of rectangular- and triangular-shaped micro-grooves are formed in P-E process. When P-E depth (ap), interval of helical grooves (dp) and rotation speed (n) are 0.12 mm, 0.2 mm and 100 r/min, respectively, the boiling structures of triangular-shaped grooves with the fin height of 0.15 mm that has good evaporation performance are obtained. The shapes of the boiling structures are restricted by dp and dp, and dp is determined by n and amount of feed (f). The ploughing speed has an important influence on the formation of groove structure in P-E process. 相似文献
13.
根据系统动力学仿真方法,建立了一个高仓位混凝土浇筑施工的系统动力学仿真模型,通过这一系统模型分析:如闸门槽二期混凝土的回填、滑动模板施工的结构部位等混凝土浇筑施工过程的情况。以指导此方面的生产与调度安排。 相似文献
14.
1 石料调配模型的建立
堆石坝填筑施工的经济性总是伴随着土石的挖填平衡规划这一主题.利用枢纽其他结构物的开挖石料(尽最大可能地减少石料发生二次倒运)进行大坝填筑的程度,决定了大坝填筑施工经济性的程度. 相似文献
15.
高面板堆石坝的坝体变形性状复杂。无疑,大坝全断面、均匀填筑碾压上升是最有利于避免坝体出现过大差异变形的施工方式。然而,在实际施工中,受各种因素的制约,实现全断面、均匀填筑碾压上升是很难做到的。通过对马来西亚巴贡面板堆石坝实际填筑施工过程的描述,找出了这些在实际施工中约束大坝全断面、均匀铺筑碾压上升的各种限制因素,阐述了针对这些因素的限制在巴贡面板堆石坝填筑中实际采取的坝体加载次序。以巴贡工程的实测数据为基础,对实际采取的坝体加载方式对坝体变形的影响作了一些初步分析。得出以下结果:(1)尽管由于实际条件的限制而不能全断面、均匀填筑碾压上升使大坝在过程中变形速率有差异,然而,随着时间的推移,大坝变形终会趋于稳定、协调。因此,在堆石坝的填筑中,简单且单一地考虑沉陷的均匀性而片面地追求全断面、均匀填筑上升却忽视经济的施工资源配置是不必要的。(2)考虑不能全断面、均匀填筑碾压上升限制因素的影响而制定出的实际填筑加载方式成为混凝土面板堆石坝数值计算时设定边界条件时所考虑的因素,数值计算的结果可能会更接近实际情况。(3)描述了为削弱这些因素对坝体出现过大差异变形的影响所采取的一些经验性的处理方式。 相似文献
16.
17.
18.
19.
利用热阻网络方法建立相变热沉理论模型,分析各参数对相变热沉热阻的影响,并确定影响热阻的主要因素。利用冲压挤压法在相变热沉蒸发面成形三维微沟槽强化沸腾结构以提高蒸发效率,并优化小型相变热沉制造的关键参数。另外,基于开发的测试平台对相变热沉的传热性能进行测试。测试结果表明,该相变热沉具有良好的传热性能,适用于大功率LED的散热。 相似文献
20.