排序方式: 共有16条查询结果,搜索用时 11 毫秒
11.
厦门石鼓山立交近年来交通量剧增,桥梁超载情况比较严重。动静载试验发现H匝道桥主梁应变及挠度实测值偏大,且5号桥台一侧的板式橡胶支座出位偏移较严重。通过在桥梁跨中增加支撑,和对支座进行纠偏等桥梁加固措施,增大了梁体的线刚度,减少了跨中负弯矩。加固后对桥梁进行结构验算,结构是安全的。 相似文献
12.
For the purpose to suit the bad mining technical conditions, such as deep imbed, gentle dip angle, and high initial stress in Dongguashan deposit, the stoping scheme was optimized. The new mining technique, with temporary curtain walls, large panels and stopes, was achieved as well. The deposit model, which was built through the DATAMINE, was led into FLAC^3D for numerical simulation. Based on these, the stabilities of pillars and stopes were analyzed. On the other hand, the impact of output stability by new scheme was verified with the help of optimization planning theory. The results show that stopes and curtain walls are safe when the width of temporary curtain walls between panels are 18 m. The length and width of stope increase to 78 m (82 m) and 18 m respectively, and those of panel increase to 300-500 m and 100 m respectively. The commercial test indicates that the new scheme can attain the aims of simpler production organization, better stope ventilation and work condition, smaller quantities of development and cutting, and 2/3 of equipments as before with the stable output. The pillar stoping technique is credible and valuable. 相似文献
13.
14.
15.
根据赞比亚谦比西铜矿多年采矿经验,总结了无底柱分段崩落法开采中厚、倾斜矿体的设计要素、技术措施以及在实际生产管理中碰到的问题及解决办法,为其他类似矿山提供参考借鉴。 相似文献
16.