首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   16篇
  免费   5篇
化学工业   3篇
轻工业   3篇
无线电   1篇
一般工业技术   9篇
自动化技术   5篇
  2022年   5篇
  2021年   1篇
  2020年   1篇
  2018年   5篇
  2017年   2篇
  2015年   1篇
  2013年   3篇
  2011年   1篇
  2008年   1篇
  2006年   1篇
排序方式: 共有21条查询结果,搜索用时 0 毫秒
21.
The two-stage assembly scheduling problem has received growing attention in the research community. Furthermore, in many two-stage assembly scheduling problems, the job processing times are commonly assumed as a constant over time. However, it is at odds with real production situations some times. In fact, the dynamic nature of processing time may occur when machines lose their performance during their execution times. In this case, the job that is processed later consumes more time than another one processed earlier. In view of these observations, we address the two-stage assembly linear deterioration scheduling problem in which there are two machines at the first stage and an assembly machine at the second stage. The objective is to complete all jobs as soon as possible (or to minimise the makespan, implies that the system can yield a better and efficient task planning to limited resources). Given the fact that this problem is NP-hard, we then derive some dominance relations and a lower bound used in the branch-and-bound method for finding the optimal solution. We also propose three metaheuristics, including dynamic differential evolution (DDE), simulated annealing (SA) algorithm, and cloud theory-based simulated annealing (CSA) algorithm for find near-optimal solutions. The performances of the proposed algorithms are reported as well.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号