首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   42篇
  免费   0篇
电工技术   1篇
化学工业   2篇
金属工艺   2篇
建筑科学   3篇
无线电   3篇
一般工业技术   6篇
冶金工业   19篇
自动化技术   6篇
  2020年   1篇
  2019年   1篇
  2017年   1篇
  2016年   1篇
  2015年   1篇
  2014年   1篇
  2013年   2篇
  2011年   3篇
  2010年   1篇
  2009年   5篇
  2008年   6篇
  2007年   4篇
  2006年   1篇
  2005年   2篇
  2004年   1篇
  2001年   2篇
  1999年   2篇
  1997年   2篇
  1995年   2篇
  1993年   1篇
  1987年   1篇
  1985年   1篇
排序方式: 共有42条查询结果,搜索用时 15 毫秒
41.
This paper raises the issue of “soft” considerations in the selection of equipment for building construction projects. The paper aims at increasing the awareness: (1) to the nature, variety, and richness of soft factors; (2) to their significant role and potential impact on the outcome of decision making; and (3) to the inherent difficulty of evaluating them and integrating them within a comprehensive selection process. Existing state-of-the-art equipment selection models were analyzed and found to be inadequate in terms of both considering soft factors and providing mechanisms for their systematic evaluation. Six cases of large-size, complex construction projects were investigated to obtain an extensive list of typical soft factors. This investigation revealed that the consideration of soft factors in current practices is essentially unstructured and is not integrated within the selection process in a systematic manner. A desirable selection process is outlined that generally responds to the needs identified in the study. The proposition of a specific method for the quantitative treatment of soft factors and their tradeoff with cost factors is the subject of another paper.  相似文献   
42.
A great many of today’s construction projects are characterized by high levels of dynamics, namely, the combined effect of complexity, uncertainty, and speed. Managing projects under such conditions is difficult and challenging, and the question is asked: How do managers do it? Aspiring to answer this question, ten excellent on-site construction project managers were systematically observed during one workweek each, within an extensive study that examined their performance in their dynamic management environments. The structured observation and documentation and the analysis that followed them enabled us to characterize the managers’ work and exposed their unique modes of operation through which they consistently excel in their work. Among many aspects addressed by the said study, this paper focuses on communication and, using various measures, examines the intensiveness and extensiveness of communication performed by the PMs in the broad context of their work. The study found that the on-site construction PMs were strongly oriented toward verbal communication of information (during nearly 80% of their activities and time); they spent a major portion of their workdays in meetings (during 60% of their activities, and of which nearly 80% were unplanned); and they showed clear preference for interacting informally with no more than one or two other persons (during 93% of their activities and 88% of the time). The unique knowledge base resulting from this study constitutes a potential contribution for practitioners who are required to function in similar dynamic work environments, as well as for students, teachers, and researchers of construction management.  相似文献   
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号