全文获取类型
收费全文 | 80篇 |
免费 | 2篇 |
专业分类
电工技术 | 3篇 |
化学工业 | 15篇 |
金属工艺 | 16篇 |
机械仪表 | 3篇 |
建筑科学 | 5篇 |
能源动力 | 2篇 |
轻工业 | 2篇 |
无线电 | 10篇 |
一般工业技术 | 13篇 |
冶金工业 | 6篇 |
自动化技术 | 7篇 |
出版年
2024年 | 2篇 |
2023年 | 1篇 |
2022年 | 5篇 |
2021年 | 5篇 |
2020年 | 5篇 |
2019年 | 6篇 |
2018年 | 7篇 |
2017年 | 3篇 |
2016年 | 5篇 |
2014年 | 3篇 |
2013年 | 9篇 |
2012年 | 5篇 |
2011年 | 6篇 |
2010年 | 5篇 |
2009年 | 3篇 |
2008年 | 3篇 |
2007年 | 1篇 |
2006年 | 2篇 |
2005年 | 2篇 |
2003年 | 2篇 |
1998年 | 1篇 |
1997年 | 1篇 |
排序方式: 共有82条查询结果,搜索用时 0 毫秒
81.
Diminishing resources, alarming pollution levels and escalating price associated with the application of diesel in compression ignition engine have forced scientific community throughout the world to conduct several experiments for the evaluation of biodiesel (BD) as a substitute for diesel. Due to difference in the physical and chemical properties of BD and diesel, the engine parameters such as compression ratio (CR), injection pressure (IP) and injection timing (IT) may not be optimum for BD, especially for higher blends. The present study is carried out with the aim to investigate the combined effect of CR, IP and IT on the performance and emission of a diesel engine widely used in agriculture sector in India, fuelled with B40 (40% BD and 60% diesel on a volume basis). Furthermore, this paper also aims to find the optimum engine parameters. A total of 27 sets of experiments were conducted for different combination of engine parameters and 162 sets of performance and emission data were recorded with varying load conditions. Adjustment of operating parameters was helpful to overcome the shortcoming of higher blend of BD (B40). The results demonstrated that higher CR (18:1) and IP (240 bar) along with advance IT (26° bTDC) is the best combination for a constant speed engine with brake power of 3.5 kW. 相似文献
82.
Contractors throughout the construction supply chain develop and use cost information. By treating ‘cost as information’, insights are generated into how cost information is created and flows from work carried out to a client cost. A case study of a main contractor’s supply chain involved semi-structured interviews, workshops and document reviews. We considered whether contractors’ current costing practices used for the purpose of pricing and cost control could support decision-making about improvements through the supply chain. The results show that firms recognize that current costing practices do not provide a good representation of work carried out. Cost information that is useful in a narrative that seeks to improve site operations is either not created or hidden in layers of assumptions and lost as it does not cross the boundaries between organizations. This implies that the implementation of current practices of costing in building information modelling will not increase the effectiveness of modelling construction costs for the purpose of improvements. However, cost information that is useful in decision-making about improvements could be created. This could be achieved but requires a systemic change, where new representations of cost are tied to work processes used within more stable procurement relationships. 相似文献