The laser-induced thermal grating technique has been used to determine the thermal diffusivity of liquids and liquid mixtures. But the dynamic behaviour of the transient thermal grating has not yet been thoroughly investigated, and the systematic errors, which result from the departures from one-dimensional heat conduction, have scarcely been studied quantitatively. In this paper. a three-dimensional numerical simulation and results of the transient thermal grating technique are presented, which enable a good understanding of the dynamic behaviour of the transient thermal grating. The results of this simulation are important for the proper design of the experimental setup to keep the systematic errors for the diffusivity measurement small. Based on the simulation method, the systematic errors were analyzed quantitatively. Here, the following effects were studied: (I) sample thickness, (2) intersection angle, (3) absorption, (4) Gaussian beam intensity distribution and focusing of heating laser beam, and (5) heating pulse duration and laser power. This error analysis makes it possible to specify the criteria for optimum measuring conditions, to correct the measured thermal-diffusivity values for systematic errors, and to estimate the accuracy of the measurements. 相似文献
We consider an integer-subset representation problem motivated by a medical application in radiation therapy. We prove NP-completeness, derive nontrivial bounds, and report on the performance of a greedy heuristic. 相似文献
The Technical University of Catalonia (UPC) has been jointly working with the Asociación Nuclear Ascó-Vandellòs (ANAV) for a number of years in order to establish, qualify and use best estimate (BE) models for the reactors under the control of ANAV. ANAV is the consortium that is responsible for operation of the Ascó and Vandellòs-II reactors. The reactors are Westinghouse-design three-loop PWRs with an approximate electrical power of 1000 MW. The existing integral plant models for each plant are currently used for many different purposes among which are support of plant operation and control. Quite a number of studies have been done in order to improve both safety and plant competitiveness. Most of these dynamic analyses were carried out in relation to transients starting at nominal full power or at least, very close to full power. This paper develops a specific use of the Vandellòs-II plant model for operation and control support at low power involving new ranges of system actuation parameters. It also examines scenarios that are somewhat different from those typically analysed. The study starts showing the results of an assessment case, which is a start-up test and provides some additional qualification, and subsequently attempts to establish calculations to support both an improvement in feed water controls and to set up operating recommendations for low-load manual operation of feed water turbo-pump. Both results hopefully, will produce an outcome, which leads to an improvement in safety and reduces reactor trip probability. 相似文献
We introduce a new graph cut for clustering which we call the Information Cut. It is derived using Parzen windowing to estimate an information theoretic distance measure between probability density functions. We propose to optimize the Information Cut using a gradient descent-based approach. Our algorithm has several advantages compared to many other graph-based methods in terms of determining an appropriate affinity measure, computational complexity, memory requirements and coping with different data scales. We show that our method may produce clustering and image segmentation results comparable or better than the state-of-the art graph-based methods. 相似文献
The infrastructure renewal program at MIT consists of a large number of projects with an estimated budget that could approach $1 billion. Infrastructure renewal at the Massachusetts Institute of Technology (MIT) is the process of evaluating and investing in the maintenance of facility systems and basic structure to preserve existing campus buildings. The selection and prioritization of projects must be addressed with a systematic method for the optimal allocation of funds and other resources. This paper presents a case study of a prioritization method utilizing multi-attribute utility theory. This method was developed at MIT's Department of Nuclear Engineering and was deployed by the Department of Facilities after appropriate modifications were implemented to address the idiosyncrasies of infrastructure renewal projects and the competing criteria and constraints that influence the judgment of the decision-makers. Such criteria include minimization of risk, optimization of economic impact, and coordination with academic policies, programs, and operations of the Institute. A brief overview of the method is presented, as well as the results of its application to the prioritization of infrastructure renewal projects. Results of workshops held at MIT with the participation of stakeholders demonstrate the feasibility of the prioritization method and the usefulness of this approach. 相似文献
Istanbul is one of the most famous historical cities in the world. However, the project alignment selected as the best of a range of alignments cannot avoid passing beneath the historical and cultural heritages of Istanbul as well as under ancient and densely inhabited areas of the city. This paper will explain some of the challenges related to the bored tunnels.
Historical buildings are vulnerable. Yet many existing residential and office buildings are old and constructed on minimal foundations. As a consequence, it is vital that any drawdown of groundwater and any ground settlements have to be minimized.
In addition, the connection between the immersed and bored tunnels will be made directly and totally underground, without the usual intermediate shafts and beneath the deep waters of the Bosphorus Strait. This operation needs the utmost control of the tunnel excavation face to ensure its stability and to minimize water ingress. Based on such considerations, tunnel excavation by tunnel boring machine (TBM) using a slurry shield and having the ability to operate under high pore pressures was recommended as the method of excavation for the main running tunnels.
The paper will explain how the design team from Avrasyaconsult – the Employer’s Representative – arrived at the final minimum, specific and functional requirements of the bored tunneling works which are to be carried out using the ‘FIDIC EPC/Turnkey Project’ conditions. 相似文献