A new practical method is proposed which gives a quasi-optimal solution of the dynamic load-dispatching problem formulated by a multiconstraint multiobjective optimization problem. Here, the multiple constraints are rate reserve constraints and power flow ones, and the multiple objectives are fuel cost and CO2 emission. The proposed method is an integration of the following three techniques: (1) “Group Dispatch Scheme,” which is developed by the authors, is used to satisfy a violated constraint easily. This scheme consists of three steps. The first step is to classify all generators into two groups. One is the group which should be more loaded to satisfy the violated constraint, and the other is the should-be less loaded group. The second step is to add some load to the former group, and to subtract the same load from the latter. The third step is to dispatch each group load to each groups generators, respectively; (2) the dynamic load-dispatching algorithm is used which provides, in practical time, quasi-optimal generation trajectories; (3) the conventional weighting parametric method is used to obtain a Pareto optimal solution of multiobjective problems. The effectiveness of the method is clarified by a computer simulation on the actual power system of Kansai Electric Power Company. 相似文献
Present-day power systems operate with high reliability, and it is rare that a blackout will extend over an entire system swiftly and securely. This paper considers automatic power supply to loads after a complete blackout of a system. First, taking into account characteristics of generators, loads, and initial power sources, a method is proposed of allocating several generators to each load in parallel to the system and supplying power to the load sequentially. Second, to remove the imbalance between supply and demand of power, a method is proposed of adjusting the amount of supply and generation according to a present imbalance and the sum of past ones. Third, to automatically issue orders for start-up, parallel, follow-up, stand-by, and stoppage of generators, several rules for each power station are set and an expert system is made based on them. Finally, the expert system is applied to a model power system, and it is verified that it can restore loads without any trouble for a complete blackout which occur at any time of a day and in any restoration pattern. 相似文献
Fluorans are given considerable attention as functional dyes for heat-and/or pressure-sensitive recording media. Numerous potential metal complexes were synthesised to prolong the life of coloured species. The protecting effect of these compounds against the photofading was examined on cellulose. It was found that the zinc or nickel salts of 3,5-dihydroxy-2-naphthoic acid and its derivatives can be applied as effective stabilisers against the fading of fluoran dyes. 相似文献
Service life planning comprises a model for the determination of a reasonable expected service life for buildings and components, and it establishes a routine for the assessment of design alternatives. A design option is considered reasonable when it meets or exceeds performance requirements over time that have been drawn up specifically for the specific project. Due to this assessment reference, there is a very evident link to the concept of performance-based building. Any stakeholder involved in the value chain or in the design process of the building, as well as regulators and building users, can express performance requirements. Identified requirements, both in relevance and in quality, will vary with the stakeholder and his/her perspective of interest. As building sector manufacturers develop most products with reference to standards rather than with reference to specific requirements, there is no direct link from user requirements to the product design. Instead, the building designer has the responsibility to ensure performance requirements are met by the performance of products integrated into the design. As these design decisions also have to be made at the material and component level, a performance-based building would benefit from an established rationale that enables the communication of performance requirements across the relevant system levels in the relevant design processes. A path for the connection of the established concepts of service life planning and performance-based building is presented. The aim is to identify key elements that need to be developed for the successful linkage of performance-based building with service life planning. 相似文献
Istanbul is one of the most famous historical cities in the world. However, the project alignment selected as the best of a range of alignments cannot avoid passing beneath the historical and cultural heritages of Istanbul as well as under ancient and densely inhabited areas of the city. This paper will explain some of the challenges related to the bored tunnels.
Historical buildings are vulnerable. Yet many existing residential and office buildings are old and constructed on minimal foundations. As a consequence, it is vital that any drawdown of groundwater and any ground settlements have to be minimized.
In addition, the connection between the immersed and bored tunnels will be made directly and totally underground, without the usual intermediate shafts and beneath the deep waters of the Bosphorus Strait. This operation needs the utmost control of the tunnel excavation face to ensure its stability and to minimize water ingress. Based on such considerations, tunnel excavation by tunnel boring machine (TBM) using a slurry shield and having the ability to operate under high pore pressures was recommended as the method of excavation for the main running tunnels.
The paper will explain how the design team from Avrasyaconsult – the Employer’s Representative – arrived at the final minimum, specific and functional requirements of the bored tunneling works which are to be carried out using the ‘FIDIC EPC/Turnkey Project’ conditions. 相似文献
Electric power systems are expanding in size and complexity, and the requirement for the energy management system (EMS) is becoming more important. In this computer control system, a single control computer is used mainly as the primary computer and its software is very complicated because of its hugh number of small, quick tasks to obtain high response speed. Therefore, much effort is needed to develop and modify the programs, and the responsiveness of this centralized architecture varies greatly when many faults occur in the power system. This paper describes a new distributed architecture for the EMS. Distributed processors execute the functions cooperatively with periodic access to the common bulletin board database in which information about the power system exist. This architecture facilitates the software development and maintenance, and it also enhances the performance by the parallel processing of the distributed functions. 相似文献