首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
建筑科学   1篇
  1993年   1篇
排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
When Europe's largest civil-engineering construction site, the Channel Tunnel, requested a guaranteed source of water during 1988, the Folkestone District Water Company was experiencing the first signs of the drought conditions which were to prevail for the next three years. Whilst infrastructure changes allowed for supplies to be made available to the Channel Tunnel contractors, the increasing reduction of resources meant that an alternative supply of water was required.
The solution to the problem was to utilize desalination by reverse osmosis of sea water taken from the English Channel. The process design and operation of this most arduous of feed water is discussed, demonstrating the successful application of this technology.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号