首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
轻工业   1篇
一般工业技术   1篇
  2021年   1篇
  2004年   1篇
排序方式: 共有2条查询结果,搜索用时 0 毫秒
1
1.
Effects of alkaline [NaOH, saturated Ca(OH)2 and/or limewater] soaking and subsequent washing (with water vs. without washing) treatments on physicochemical properties of rice flour were investigated. Alkaline soaking treatment generally caused a loss of granule angularity but some birefringence was observed for unwashed alkali-soaked flour granules. After soaking, protein content of the flours significantly (P < 0.05) decreased but swelling power significantly (P < 0.05) increased compared to the control (soaked in water). The washed flours had lower protein content than unwashed flours (3.77–6.87% vs. 5.26–7.87%). The NaOH-soaking treatment yielded higher swelling power and solubility, respectively, for unwashed and washed flours. Alkaline soaking increased breakdown but decreased pasting temperature, trough viscosity, final viscosity and setback of the paste compared to the control. Compared to the control, hardness of soaked flour paste was lower due to lower final viscosity and setback. Overall, physicochemical properties of rice flour could be modified by alkali-soaking and washing treatments.  相似文献   
2.
Order selection and scheduling with leadtime flexibility   总被引:3,自引:0,他引:3  
In this paper, we study integrated order selection and scheduling decisions, where the manufacturer has the flexibility to choose leadtimes. Our main goal is to provide a mechanism for coordinating order selection, leadtime and scheduling decisions and to determine under what conditions leadtime flexibility is most useful for increasing the manufacturer's profits. Through numerical analyses, we compare and contrast the benefits of leadtime flexibility and the flexibility to partially fulfill orders in different demand environments defined by the congestion level (or demand load), seasonality of the demand and order size. We consider both the cases where the manufacturer has and does not have the flexibility to produce orders early before they are committed.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号