首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   5篇
  免费   1篇
水利工程   6篇
  2013年   1篇
  2012年   2篇
  2009年   2篇
  2005年   1篇
排序方式: 共有6条查询结果,搜索用时 31 毫秒
1
1.
Based on the basic theory of temperature field and stress field for mass concrete, a feedback calculation for the temperature control simulation is made in accordance with the specific characteristics of the pier of the flood discharge sluice for a water control project in Xinjiang. It is known through the calculation that the adoptions of both the measure to alleviate the temperature difference between the inner and the outer concrete of the pier during the early period and the measure of the following-up temperature insulation for the concrete are the favorable methods to prevent the cracking of the pier concrete, and then this study result can provide references for the related project concerned.  相似文献   
2.
针对某严寒干旱地区RCC重力坝所在地"冷、热、风、干"的气候特点,分析了温度裂缝产生的原因,并主要从加强混凝土的表面保温着手,结合工程实际,利用有限元法进行坝体表面温度和温度应力的仿真分析。研究表明:表面保温是防止混凝土产生裂缝的有效措施之一;根据现场施工条件,采取对已浇筑的坝体表面粘贴5 cm厚XPS板并回填土进行保温的综合表面保温措施。  相似文献   
3.
本文分析了严寒地区RCC(碾压混凝土)重力坝温度裂缝产生的原因,并主要从加强混凝土的表面保温着手,结合现场保温试验,进行保温材料比选,提出了适合工程实际的永久的坝体表面保温材料,以提高RCC重力坝的抗裂能力。  相似文献   
4.
喀腊塑克水电站钢岔管采用600MPa、800MPa级高强钢制造,钢岔管在焊接后存在较大的焊接应力不均匀性及较大的焊接应力。经过振动时效消除应力技术,钢岔管焊接应力趋于均匀,较好地降低了焊接残余应力。  相似文献   
5.
罗清萍  虢强 《水利水电技术》2012,43(3):68-70,32
本文介绍了北疆某水电站尾水管扩散段现场拼装,尾水管安装以及防变形焊接过程,并对尾水管的安装过程中出现的沉降问题作了分析。通过该电站尾水管的安装,总结出了一整套在平地上安装尾水管及扩散段的施工方法和经验,为今后类似施工积累了宝贵的经验。  相似文献   
6.
坝下埋涵是额尔齐斯河水库的重要建筑物,其安全运行直接影响到大坝的安全.对涵洞基础处理进行论证分析,确定换填砾质土的处理方案,减小了涵洞不均匀沉降,达到了经济合理、安全可靠的目的,为以后同类工程的建设提供可借鉴的经验.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号