排序方式: 共有55条查询结果,搜索用时 15 毫秒
1.
LEI Peng CHANG XiaoLin XIAO Feng ZHANG GuiJin & SU HuaiZhi School of Hydraulic Engineering Changsha University of Science Technology Changsha China College of Water Resources Hydroelectric Engineering Wuhan University.Wuhan Mid-south Design Research Institute China Hydropower Engineering Consulting Group Co Changsha College of Water Conservancy Hydropower Engineering Hohai University Nanjing 《中国科学:信息科学(英文版)》2011,(6)
Owing to the deficiency in early warning for high concrete dam,a formula was established to characterize the deformation behavior of high concrete dam as a whole.The early warning index of spatial deformation was calculated by low probability principle on the basis of the deformation entropy formula proposed.The steps were as follows.Firstly,the probability method was utilized to define the degree of order and degree of chaos for each survey point.Secondly,the weight distribution among the survey points was... 相似文献
2.
一种新型水轮发电机组智能模糊控制系统 总被引:14,自引:4,他引:10
本文提出了一种新型的水轮发电机组智能模糊控制系统。它充分利用一有水轮机调速器的硬件资源,在进行智能模糊实时控制的同时,以神经网络贯穿对水轮机系统的和学习,从而圆满地解决了以往智能控制学习时由于模型未知而无法求反向传播误差的问题。 相似文献
3.
4.
Cui Li Li Lin-puDept. of Civil Engineering DUT Dalian P. R. ChinaMong Fan-chunLiaoning Investigation Design Institute of Hydroelectric Power Shenyang P.R. China 《水动力学研究与进展(B辑)》1997,(2)
A Finite Difference Method with four points weighted implicit scheme and Newton-Raphson iteration method are introduced to complete the flood routing in the tidal river. The problems related to normalization of cross-sectional area and optimization of weighting factor α are discussed and α = 0. 5 - 0. 7 is suggested. With such a α, high accuracy, stable and convergence results and flexible time step will be expected. The computational example of a tidal river in Liaoning Province shows the good agreement with the measuring data on prototype. 相似文献
5.
6.
湖北省水力发电工程学会丹江口分会 《湖北水力发电》2008,(5)
介绍了丹江口水利枢纽的开发规划初期工程的枢纽布置及主要建筑物;重点介绍了续建计划中的大坝加高工程及水利枢纽主要的社会经济效益。 相似文献
7.
8.
Liu Qing-chao Chai Fang-Kun Chen Zhen-xi Institute of Water Conservancy Hydroelectric Power Research Beijing P.R.China 《水动力学研究与进展(B辑)》1992,(4)
With the application of body-fitted coordinate method and the standard k-epsilonequations,the rtumericat sotution to the averaged N-S equations is obtained.Laminar and turbu-tent flows inside a 90-Deg-Bent duct are studied,yielding good results. 相似文献
9.
本文从大坝施工监理的实际情况出发,着重阐述如何在大坝施工监理的具体实践中,及时调整监理理念,因地制宜地把国内外面板堆石坝施工管理中行之有效的质量控制方式与引子渡水电站实际情况相结合进行施工监理。 相似文献
10.
引子渡水电站为引水式地面厂房,厂区布置紧凑,无施工干扰。由于施工工期紧,设计上采用轻型屋面网架结构、钢结构吊车梁等优化设计,施工采用滑模施工技术代替传统混凝土浇筑方法,对缩短工期起到了有效作用,解决了目前在建工程工期短的一些问题。 相似文献