首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   4篇
  免费   0篇
电工技术   1篇
轻工业   1篇
一般工业技术   2篇
  2019年   1篇
  2015年   1篇
  2014年   1篇
  2013年   1篇
排序方式: 共有4条查询结果,搜索用时 15 毫秒
1
1.
2.
3.
The leakage of a supercritical boiler tube has been investigated. The leakage was observed during a working pressure hydrostatic test under 40.1 MPa. The internal geometry of the investigated leaking tube was multi-lead ribbed tube. Various methods for investigation namely radiography, microstructural analysis using optical and scanning electron microscopes, Vickers hardness testing and chemical analysis were conducted to investigate the main cause of leakage. The results revealed that the material tube met the standard for supercritical boiler tube (ASTM A 213 Grade T12). From the microstructural analysis, there was a crack, which initiated from the outer wall adjacent to the weld metal and propagated to the inner wall of the tube. The crack was due to a weld defect known as “excessive melt through” which is due to overheating during the welding process in joining the tubes. It is suggested that control of welding process parameters must be accomplished during fabrication to make a furnace wall, and placing strip of steel between the tubes to reduce the fit-up gap should be considered.  相似文献   
4.
Journal of Failure Analysis and Prevention - A failure analysis was carried out on an A213 T91 secondary superheater tube after 4 months of overhaul. The failure caused the 600-MW coal...  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号