首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
建筑科学   1篇
一般工业技术   1篇
  2022年   1篇
  2012年   1篇
排序方式: 共有2条查询结果,搜索用时 218 毫秒
1
1.

The magnified images of thin wires, plastic, steel and lead plates which were obtained using linear microfocus hard bremsstrahlung generated through interaction of an 18 MeV electron beam with a 13 μm thick Ta foil oriented along the internal beam of a B-18 betatron are presented. The images indicate high absorption contrast of the objects due to a small horizontal size of the radiation source the width of which is 115-fold smaller than the diameter of the electron beam. Some results have shown a few peculiarities in the images which were not earlier observed. Several results were compared with the ones obtained earlier using the microfocus bremsstrahlung generated by the 18 MeV electron beam of B-18 in a narrow Si target.

  相似文献   
2.
Construction projects in India are experiencing widespread delays. Due to a dramatic shift in the capacity and volume of the Indian construction sector over the last decade, the need of a systematic analysis of the reasons of delays and developing a clear understanding among the industry professionals are highly crucial. Using a selected set of 45 attributes, this research first identified the key factors impacting delay in Indian construction industry and then established the relationship between the critical attributes for developing prediction models for assessing the impacts of these factors on delay. A questionnaire and personal interviews have formed the basis of this research. Factor analysis and regression modelling were used to examine the significance of the delay factors. From the factor analysis, most critical factors of construction delay were identified as (1) lack of commitment; (2) inefficient site management; (3) poor site coordination; (4) improper planning; (5) lack of clarity in project scope; (6) lack of communication; and (7) substandard contract. Regression model indicates slow decision from owner, poor labour productivity, architects' reluctance for change and rework due to mistakes in construction are the reasons that affect the overall delay of the project significantly. These findings are expected to be significant contributions to Indian construction industry in controlling the time overruns in construction contracts.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号