首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
冶金工业   1篇
  2011年   1篇
排序方式: 共有1条查询结果,搜索用时 15 毫秒
1
1.
Investigation of the background of the 610?mm (24?in.) spacing of stud shear connectors showed that this limit was set on the basis of a small amount of testing of beams with spacing greater than this limit. The literature search showed that some attempts have been recently made to extend this limit. One of the objectives of the NCHRP 12-65 research project was to investigate the possibility of extending this limit to 1,220?mm (48?in.) for cluster of studs used for precast concrete panels made composite with steel I-beams. The experimental investigation included testing of push-off specimens and full-scale composite beams. Results of the push-off specimens have shown that the fatigue loading has no detrimental effect on the load-slip relationship when the number of studs is doubled per cluster. This paper covers the second part of the experimental investigation, which is fatigue and ultimate testing of full-scale composite beams. The full-scale testing has proven that full-composite action between precast concrete panels and steel girders can be achieved when the spacing between the stud clusters is extended up to 1,220?mm (48?in.).  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号