排序方式: 共有5条查询结果,搜索用时 0 毫秒
1
1.
2.
High precision time measurement is required in the readout of the neutron wall and TOF walls in the ex- ternal target experiment of the Cooling Storage Ring (CSR) project in the Heavy Ion Research Facility in Lanzhou (HIRFL). Considering the time walk correction, both time and charge are measured in the readout electronics. In this 16-channel measurement module, time and charge information are digitized by TDCs at the same time based on the Time-Over-Threshold (TOT) method; meanwhile, by employing high-density ASIC chips, the electronics complexity is effectively reduced. Test results indicate that this module achieves a time resolution better than 25 ps and a charge resolution better than 5% over the input amplitude range from 50 mV to 3V. 相似文献
3.
为配合BEPC II(Beijing Electron Positron Collider,即北京正负电子对撞机)的改造,目前北京谱仪(Beijing Spectrometer,简称BES)正在进行第三期升级改造工程,称为BESIII。改造后的BESIII将大幅度提高探测器性能。TOF(Time of Flight),即飞行时间计数器,是BESIII的重要子系统,其负责时间和电荷测量的前端电子学读出模块(Front End Electronics Module,简称FEE)要求时间分辨率好于25ps,电荷分辨率好于10bit。为了对FEE模块的性能进行测试,保证工程进度和质量,一个完备的测试控制/分析系统的建立是十分必要的。文章将简要论述其中测试控制及分析软件的设计。 相似文献
4.
为配合BEPCⅡ(Beijing Electron Positron Collider,即北京正负电子对撞机)的改造,目前北京谱仪(Beijing Spectrometer,简称 BES)正在进行第三期升级改造工程,称为BESⅢ.改造后的BESⅢ将大幅度提高探测器性能.TOF(Time of Flight),即飞行时间计数器,是BESⅢ的重要子系统,其负责时间和电荷测量的前端电子学读出模块(Front End Eletronics Module,简称FEE)要求时间分辨率好于25ps,电荷分辨率好于10bit.为了对FEE模块的性能进行测试,保证工程进度和质量,一个完备的测试控制/分析系统的建立是十分必要的.文章将简要论述其中测试控制及分析软件的设计. 相似文献
5.
1