首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   1篇
  免费   0篇
自动化技术   1篇
  2008年   1篇
排序方式: 共有1条查询结果,搜索用时 0 毫秒
1
1.
We introduce a general discrete time dynamic framework to value pilot project investments that reduce idiosyncratic uncertainty with respect to the final cost of a project. The model generalizes different settings introduced previously in the literature by incorporating both market and technical uncertainty and differentiating between the commercial phase and the pilot phase of a project. In our model, the pilot phase requires NN stages of investment for completion. With this distinction we are able to frame the problem as a compound perpetual Bermudan option. We work in an incomplete markets setting where market uncertainty is spanned by tradable assets and technical uncertainty is idiosyncratic to the firm. The value of the option to invest as well as the optimal exercise policy are solved by an approximate dynamic programming algorithm that relies on the independence of the state variables increments. We prove the convergence of our algorithm and derive a theoretical bound on how the errors compound as the number of stages of the pilot phase is increased. We implement the algorithm for a simplified version of the model where revenues are fixed, providing an economic interpretation of the effects of the main parameters driving the model. In particular, we explore how the value of the investment opportunity and the optimal investment threshold are affected by changes in market volatility, technical volatility, the learning coefficient, the drift rate of costs and the time to completion of a pilot stage.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号