首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
机械仪表   1篇
自动化技术   1篇
  2009年   1篇
  2008年   1篇
排序方式: 共有2条查询结果,搜索用时 0 毫秒
1
1.
This paper considers a flexible flow shop scheduling problem, where at least one production stage is made up of unrelated parallel machines. Moreover, sequence- and machine-dependent setup times are given. The objective is to find a schedule that minimizes a convex sum of makespan and the number of tardy jobs in a static flexible flow shop environment. For this problem, a 0–1 mixed integer program is formulated. The problem is, however, a combinatorial optimization problem which is too difficult to be solved optimally for large problem sizes, and hence heuristics are used to obtain good solutions in a reasonable time. The proposed constructive heuristics for sequencing the jobs start with the generation of the representatives of the operating time for each operation. Then some dispatching rules and flow shop makespan heuristics are developed. To improve the solutions obtained by the constructive algorithms, fast polynomial heuristic improvement algorithms based on shift moves and pairwise interchanges of jobs are applied. In addition, metaheuristics are suggested, namely simulated annealing (SA), tabu search (TS) and genetic algorithms. The basic parameters of each metaheuristic are briefly discussed in this paper. The performance of the heuristics is compared relative to each other on a set of test problems with up to 50 jobs and 20 stages and with an optimal solution for small-size problems. We have found that among the constructive algorithms the insertion-based approach is superior to the others, whereas the proposed SA algorithms are better than TS and genetic algorithms among the iterative metaheuristic algorithms.  相似文献   
2.
In textile industries, production facilities are established as multi-stage production flow shop facilities, where a production stage may be made up of parallel machines. This known as a flexible or hybrid flow shop environment. This paper considers the problem of scheduling n independent jobs in such an environment. In addition, we also consider the general case in which parallel machines at each stage may be unrelated. Each job is processed in ordered operations on a machine at each stage. Its release date and due date are given. The preemption of jobs is not permitted. We consider both sequence- and machine-dependent setup times. The problem is to determine a schedule that minimizes a convex combination of makespan and the number of tardy jobs. A 0–1 mixed integer program of the problem is formulated. Since this problem is NP-hard in the strong sense, we develop heuristic algorithms to solve it approximately. Firstly, several basic dispatching rules and well-known constructive heuristics for flow shop makespan scheduling problems are generalized to the problem under consideration. We sketch how, from a job sequence, a complete schedule for the flexible flow shop problem with unrelated parallel machines can be constructed. To improve the solutions, polynomial heuristic improvement methods based on shift moves of jobs are applied. Then, genetic algorithms are suggested. We discuss the components of these algorithms and test their parameters. The performance of the heuristics is compared relative to each other on a set of test problems with up to 50 jobs and 20 stages.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号