首页 | 本学科首页   官方微博 | 高级检索  
文章检索
  按 检索   检索词:      
出版年份:   被引次数:   他引次数: 提示:输入*表示无穷大
  收费全文   2篇
  免费   0篇
一般工业技术   1篇
自动化技术   1篇
  2014年   1篇
  2005年   1篇
排序方式: 共有2条查询结果,搜索用时 0 毫秒
1
1.
2.
The cumulative scheduling constraint, which enforces the sharing of a finite resource by several tasks, is widely used in constraint-based scheduling applications. Propagation of the cumulative constraint can be performed by several different filtering algorithms, often used in combination. One of the most important and successful of these filtering algorithms is edge-finding. Recent work by Vilím has resulted in a ?? (kn log n) algorithm for cumulative edge-finding (where n is the number of tasks and k is the number of distinct capacity requirements), as well as a new related filter, timetable edge-finding, with a complexity of ??(n 2). We present a sound ??(n 2) filtering algorithm for standard cumulative edge-finding, orthogonal to the work of Vilím; we also show how this algorithm’s filtering may be improved by incorporating some reasoning from extended edge-finding, with no increase in complexity. The complexity of the new algorithm does not strictly dominate previous edge-finders for small k, and it sometimes requires more iterations to reach the same fixpoint; nevertheless, results from Project Scheduling Problem Library benchmarks show that in practice this algorithm consistently outperforms earlier edge-finding filters, and remains competitive with timetable edge-finding, despite the latter algorithm’s generally stronger filtering.  相似文献   
1
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号